• Home
  • Search
  • Browse Collections
  • My Account
  • About
  • DC Network Digital Commons Network™
Skip to main content
Montana Tech
  • My Account
  • FAQ
  • About
  • Home
Digital Commons @ Montana Tech

Digital Commons @ Montana Tech

    Content Posted in 2025

    PDF

    2022 Annual Operations and Maintenance Report, Butte Silver Bow

    PDF

    2023 Annual Operations and Maintenance Report, Butte-Silver Bow Department of Reclamation and Environmental Services

    PDF

    2024 Annual Operations and Maintenance Report, Butte-Silver Bow Department of Reclamation and Environmental Services

    PDF

    2024 RMAP NON-RESIDENTIAL PARCELS DATA SUMMARY REPORT SILVER BOW CREEK/BUTTE AREA NPL SITE BPSOU, Environmental Standards, Inc. and Pioneer Technical Services, Inc.

    PDF

    2025 Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.

    PDF

    2025 Draft Final Unreclaimed Sites Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.

    PDF

    2025 Field Evaluation of Reclaimed Sites Summary Report, Butte-Silver Bow Department of Reclamation and Environmental Services

    PDF

    2025 Final Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Phase III Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.

    PDF

    2025 Final Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Phase III Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.

    PDF

    2025 Final Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (QAPP) for Microbial Analysis and Biotreatability Study, Pioneer Technical Services, Inc.

    PDF

    2025 Final Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (QAPP) for Microbial Analysis and Biotreatability Study, Pioneer Technical Services, Inc.

    PDF

    2025 Revised Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.

    PDF

    2025 Revised Draft Final Unreclaimed Sites Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.

    PDF

    A METHODOLOGY FOR EVALUATING AND COMPARING UNMANNED INSPECTION PLATFORMS IN UNDERGROUND AND INDOOR ENVIRONMENTS, Sydney Shockley

    PDF

    APA 7th Edition Checklist, Dawn Atkinson

    PDF

    A Pilot Study in Healthcare: Salivary Cortisol Levels and Burnout, Hannah Oggerino

    PDF

    Applying the Fast Fit Test Method for Quantitative CNC to the Qualitative Fit Test Method Utilizing and Approved Reference Method and a Modified Reference Method, McKenna Kaelber

    PDF

    Approval for: Berkeley Pit and Discharge Pilot Project, Quarterly Pilot Project Report, Third Quarter 2022, dated December 23, 2022, Nikia Greene

    PDF

    Approval Letter for Final BPSOU Insufficiently Reclaimed Sites Belle of Butte (BRES No. 8 & UR-39) Remedial Action Work Plan (RAWP) Request for Change IR-2024-RA-01, Revision 1 (dated December 13, 2024), Molly Roby

    PDF

    Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Unreclaimed Sites (UR-35) Remedial Action Work Plan (RAWP) (dated June 14, 2024), Molly Roby

    PDF

    A PROPOSED METALS RECOVERY ASSESSMENT PROTOCOL TO EVALUATE MINE WASTE FOR CRITICAL MINERALS AND RARE EARTH RECOVERY PRIOR TO SITE REMEDIATION, Claire Mbia

    PDF

    ATLANTIC RICHFIELD COMPANY DISCHARGE SYSTEM 2023 DATA QUALITY ASSESSMENT BERKELEY PIT AND DISCHARGE PILOT PROJECT SILVER BOW CREEK/BUTTE AREA NPL SITE BUTTE MINE FLOODING OPERABLE UNIT, WSP Environment & Infrastructure, Inc.

    PDF

    Berkeley Pit and Discharge Pilot Project Quarterly Pilot Project Report Second Quarter 2025, Atlantic Richfield Company and Montana Resources, LLC

    PDF

    Berkeley Pit and Discharge Pilot Project Quarterly Pilot Project Report Third Quarter 2024, Atlantic Richfield Company and Mark Thompson

    PDF

    Berkeley Pit Geochemical and Limnological Evaluation Pre-Design Investigation (PDI) Work Plan, Josh Bryson

    PDF

    Blacktail Creek Energy Laboratories Metals & Mercury Laboratory Analysis Results with HGL 2B Data Validation Qualifiers, Pioneer Technical Services, Inc.

    PDF

    Blacktail Creek PDIER, HGL

    PDF

    BMFOU Pilot Project RFC - REQUEST FOR CHANGE, Pioneer Technical Services, Inc.

    PDF

    Butte Mine Flooding Operable Unit Berkeley Pit and Discharge Pilot Project – January 2025 Monthly Discharge Monitoring Report, Mark Thompson and Dave Griffis

    PDF

    Butte Priority Soils Operable Unit (BPSOU)2020 Consent Decree Appendix D Attachment C Sections 7 and 8 Discrepancies, Mike McAnulty

    PDF

    Butte Priority Soils Operable Unit (BPSOU) 2024 Monthly Progress Report. Consent Decree for the Butte Priority Soils Operable Unit. Civil Action No. CV 89-039-BU-SEH, Josh Bryson

    PDF

    Butte Priority Soils Operable Unit (BPSOU) 2025 Monthly Progress Report. Consent Decree for the Butte Priority Soils Operable Unit. Civil Action No. CV 89-039-BU-SEH, Josh Bryson

    PDF

    Butte Priority Soils Operable Unit (BPSOU) 2025 Monthly Progress Report. Consent Decree for the Butte Priority Soils Operable Unit. Civil Action No. CV 89-039-BU-SEH, Josh Bryson

    PDF

    Butte Priority Soils Operable Unit (BPSOU) 2025 Monthly Progress Report. Consent Decree for the Butte Priority Soils Operable Unit. Civil Action No. CV 89-039-BU-SEH, Josh Bryson

    PDF

    Butte Priority Soils Operable Unit (BPSOU) Draft Final 2022 Insufficiently Reclaimed Sites Sampling BRES No. 32 – Corra 2 Dump Site Evaluation Summary Report, Mike McAnulty

    PDF

    Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites Field Sampling and Investigation Plan (FSP): BRES No. 100 – Capri Motel – Arctic Dump, Mike McAnulty

    PDF

    Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (FSP) BRES No. 45 – Garfield, Mike McAnulty

    PDF

    Butte Priority Soils Operable Unit (BPSOU) Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Third Quarter 2024., Dave Griffis

    PDF

    Butte Priority Soils Operable Unit (BPSOU) Draft Final Reclamation Improvement Sites Field Sampling and Investigation Plan (FSP): BRES No. 18 – Walkerville Ballfield, Mike McAnulty

    PDF

    Butte Priority Soils Operable Unit (BPSOU) Final BPSOU Insufficiently Reclaimed Sites Belle of Butte (BRES No. 8 & UR-39) Remedial Action Work Plan (RAWP) Request for Change IR- 2024-RA-01, Mike McAnulty

    PDF

    Butte Priority Soils Operable Unit (BPSOU) Final BPSOU Insufficiently Reclaimed Sites Belle of Butte (BRES No. 8 & UR-39) Remedial Action Work Plan (RAWP) Request for Change IR- 2024-RA-01, Revision 1, Mike McAnulty

    PDF

    Butte Priority Soils Operable Unit (BPSOU) Final BPSOU Insufficiently Reclaimed Sites Belle of Butte (BRES No. 8 & UR-39) Remedial Action Work Plan (RAWP) Request for Change IR- 2024-RA-02, Mike McAnulty

    PDF

    Butte Priority Soils Operable Unit (BPSOU) Groundwater Remedy Optimization Subdrain Pump Station Preliminary (30%) Remedial Design Package Submittal, Josh Bryson

    PDF

    Butte Priority Soils Operable Unit (BPSOU) Revised Butte Hill Revegetation Specifications, Mike McAnulty and Eric Hassler

    PDF

    Butte Priority Soils Operable Unit (BPSOU) Superfund Operation and Maintenance (O&M) Request for Maintenance – Kelley Stormwater Channels (Dated April 22, 2025), Josh Bryson

    PDF

    Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites and Insufficiently Reclaimed Areas – Racetrack Borrow Material Usage, Mike McAnulty

    PDF

    Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (QAPP) Revision 0, Woodard & Curran

    PDF

    Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (QAPP) Revision 0, Woodard & Curran

    PDF

    Butte Priority Soils Operable Unit Draft Final 2023 Reclamation Improvement Sites Sampling: BRES No. 84 – Mandan Park Site Evaluation Summary Report, Mike McAnulty

    PDF

    Butte Priority Soils Operable Unit SBCCA Principles for a Greener Cleanup Report, Josh Bryson

    PDF

    Butte Reclamation Evaluation System Corrective Action Plans for Reclaimed Sites - 2024 BRES Site Specific Corrective Action Plans for Quadrant 1, Butte-Silver Bow Department of Reclamation and Environmental Services

    PDF

    Butte Reduction Work (BRW) Phase II Interim Demolition Plan Construction Drawings and Floodplain Encroachment Analysis, Julia Crain

    PDF

    Butte Reduction Works (BRW) Phase II Interim Demolition Plan Construction Drawings and Floodplain Encroachment Analysis, Pioneer Technical Services, Inc.

    PDF

    Clark Tailings Consolidated Waste Management Area (CTCWMA) Site Investigation Draft Data Summary Report 2019 Surface Water, Groundwater Seep, and Soil Characterization 2021-2023 Surface Water and Groundwater Seep Evaluation 2023 Waterloo APS Soil and Groundwater Evaluation, Woodard & Curran

    PDF

    Clark Tailings Consolidated Waste Management Area (CTCWMA) Site Investigation Draft Data Summary Report 2024 Surface Water, Groundwater, and Soil Characterization, Woodard & Curran

    PDF

    Comma Tips, Dawn Atkinson

    PDF

    Comment Letter for BPSOU Draft Phase I Design Investigation Evaluation Report (dated September 25, 2024), Emma Rott

    PDF

    Comment letter for the Butte Priority Soils Operable Unit (BPSOU) 2025 Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (dated February 14, 2025), Molly Roby

    PDF

    Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Butte Reclamation Evaluation System (BRES) Draft 2024 Field Evaluation Summary and Technical Recommendations Report (dated November 15, 2024), Molly Roby

    PDF

    Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites UR-03 Remedial Action Work Plan (RAWP) (dated January 27, 2025)., Molly Roby

    PDF

    Common Grammatical Errors and Conventions in Academic Writing, Dawn Atkinson

    PDF

    Comparing Ergonomic Hazard Control Methods for Rock Drilling, Mickenzie Alt

    PDF

    Critical Mineral Recovery from Metals-Laden Mine Water, Matthew Ingersoll

    PDF

    DESIGNING AND MCAT STUDY APP THAT UPDATES AUTOMATICALLY AND INCLUDES A NOVEL GOAL OF OPTOMIZING A USER'S MENTAL HEALTH, Richard Vasquez

    PDF

    DEVELOPMENT OF ROBOTIC SAMPLING METHOD FOR REEs IN GPS-DENIED AND HAZARDOUS ENVIRONMENTS, Alan Arthur

    PDF

    DISCHARGE SYSTEM FIELD SAMPLING PLAN, 2025 UPDATE SILVER BOW CREEK/BUTTE AREA NPL SITE BUTTE MINE FLOODING OPERABLE UNIT | BUTTE, MONTANA, Mark Thompson and Dave Griffis

    PDF

    DRAFT 2025 Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Woodard & Curran

    PDF

    DRAFT 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran

    PDF

    DRAFT 2026 Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Woodard & Curran

    PDF

    Draft Final 2021-2022 Residential Metals Abatement Program (RMAP) Butte School District No. 1 (West Elementary School and Butte High School) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.

    PDF

    Draft Final 2022 Insufficiently Reclaimed Sites Sampling BRES No. 30 – Atlantic 1 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

    PDF

    Draft Final 2022 Unreclaimed Sites Sampling: UR-06 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

    PDF

    Draft Final 2022 Unreclaimed Sites Sampling: UR-12 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

    PDF

    Draft Final 2022 Unreclaimed Sites Sampling: UR-20 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

    PDF

    Draft Final 2022 Unreclaimed Sites Sampling: UR-22 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

    PDF

    Draft Final 2022 Unreclaimed Sites Sampling: UR-28 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

    PDF

    Draft Final 2023 Residential Metals Abatement Program (RMAP): Koprivica Park Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.

    PDF

    Draft Final 2024 BPSOU Subdrain Data Summary Report (DSR), Pioneer Technical Services, Inc.

    PDF

    Draft Final 2024 Butte Priority Soils Operable Unit (BPSOU) Borrow Amendment Submittal #1, Pioneer Technical Services, Inc.

    PDF

    Draft Final 2024 Residential Metals Abatement Program (RMAP) Baptist Student Union (former McKinley School) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.

    PDF

    Draft Final 2024 Residential Metals Abatement Program (RMAP) Mandan Park Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

    PDF

    Draft Final 2024 Residential Metals Abatement Program (RMAP) Park Soil Sampling Field Sampling Plan (FSP) Submittal #13 [Copper Mountain Park], Pioneer Technical Services, Inc.

    PDF

    Draft Final 2024 Residential Metals Abatement Program (RMAP): Walkerville Park (Walkerville Drive & Ryan Road) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.

    PDF

    Draft Final 2025 Residential Metals Abatement Program (RMAP) Butte KOA Playground Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

    PDF

    Draft Final 2025 Residential Metals Abatement Program (RMAP): CCCS Gymnasium Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

    PDF

    Draft Final 2025 Residential Metals Abatement Program (RMAP) Non-Residential Daycare Soil Sampling: Field Sampling Plan (FSP) Submittal #15 [Mini Scholars Discovery Academy, Hands on Learning Childcare, Kidz Konnection, Young Explorers, & University on Princeton], Pioneer Technical Services, Inc.

    PDF

    Draft Final 2025 Residential Metals Abatement Program (RMAP) Quality Assurance Project Plan (QAPP) Annual Update (Non-Residential Parcels and Residential Daycares), Pioneer Technical Services, Inc.

    PDF

    Draft Final 2025 Residential Metals Abatement Program (RMAP) Quality Assurance Project Plan (QAPP) Annual Update (Non-Residential Parcels and Residential Daycares), Pioneer Technical Services, Inc.

    PDF

    Draft Final 2025 Residential Metals Abatement Program (RMAP) Quality Assurance Project Plan (QAPP) Annual Update (Residential Parcels), Pioneer Technical Services, Inc.

    PDF

    Draft Final 2025 Residential Metals Abatement Program (RMAP) Quality Assurance Project Plan (QAPP) Annual Update (Residential Parcels), Pioneer Technical Services, Inc.

    PDF

    Draft Final 2025 Residential Metals Abatement Program (RMAP) Rock Creek Cattle Company Borrow Submittal #1, Pioneer Technical Services, Inc.

    PDF

    Draft Final BPSOU Insufficiently Reclaimed Sites BRES No. 158 - Waste Rock Dump Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

    PDF

    Draft Final BPSOU Insufficiently Reclaimed Sites Josephine Shaft (IR-37) Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

    PDF

    Draft Final BPSOU Unreclaimed Sites UR-05 Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

    PDF

    Draft Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc.

    PDF

    Draft Final Butte Priority Soils Operable Unit (BPSOU) Insufficiently Reclaimed Sites Remedial Action Work Plan (RAWP): BRES No. 104 (Colorado Dump) North Slope, Pioneer Technical Services, Inc.

    PDF

    Draft Final Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites: UR-03 Site Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

    PDF

    Draft Final Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites UR-46 Temporary Best Management Practices Work Plan, Pioneer Technical Services, Inc.

    PDF

    Draft Final Butte Priority Soils Operable Unit (BPSOU) Unreclaimed (UR) Sites New and Mahoney (UR-23) Construction Completion Report (CCR), Pioneer Technical Services, Inc.

    PDF

    DRAFT FINAL PHASE I PRE-DESIGN INVESTIGATION EVALUATION REPORT BLACKTAIL CREEK RIPARIAN ACTIONS BUTTE PRIORITY SOILS OPERABLE UNIT OF THE SILVER BOW CREEK/BUTTE AREA SUPERFUND SITE SILVER BOW COUNTY, MONTANA, HydroGeoLogic, Inc.

    PDF

    Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – First Quarter 2025, Pioneer Technical Services, Inc.

    PDF

    Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2024, Pioneer Technical Services, Inc.

    PDF

    Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2024, Pioneer Technical Services, Inc.

    PDF

    Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Second Quarter 2025, Pioneer Technical Services, Inc.

    PDF

    Draft Final Silver Bow Creek Conservation Area Repository Data Gap Data Summary Report (DSR), Pioneer Technical Services, Inc.

    PDF

    Draft Final - Silver Bow Creek Conservation Area (SBCCA) Butte Reduction Works (BRW) Air Monitoring for Interim Demolition Activities – Phase I Data Summary Report (DSR), Pioneer Technical Services, Inc.

    PDF

    Draft Final Silver Bow Creek Conservation Area (SBCCA) Construction Quality Assurance Plan (CQAP), Pioneer Technical Services, Inc.

    PDF

    Editing Activity Using the Microsoft Word Find Function, Dawn Atkinson

    PDF

    Editing and Proofreading Tips, Dawn Atkinson

    PDF

    Effects of Oxygen Content of Admitted Gases in Sulfide Flotation, Brian J. Boyle

    PDF

    EPA REGION 8 OPTIMIZED UFP-QAPP REVIEW CROSSWALK, Environmental Protection Agency and Emma Rott

    PDF

    EVALUATING THE POTENTIAL TO INCREASE OIL PRODUCTION FROM LEGACY FIELDS IN MONTANA, Noel Dapilee

    PDF

    Exhibit 2 “Basement ISWP” 1029 Oregon Ave. Butte, MT 59701 January 30, 2025 Database Residential Identifier: R-03611, Butte-Silver Bow Department of Reclamation and Environmental Services

    PDF

    Exhibit 2 “Basement ISWP” 122 W. Daly St. Butte, MT 59701 January 16, 2025 Database Residential Identifier: R-00845, Butte-Silver Bow Department of Reclamation and Environmental Services

    PDF

    Exhibit 2 “Basement ISWP” 1232 E. Second St. Butte, MT 59701 January 21, 2025 Database Residential Identifier: R-04389, Butte-Silver Bow Department of Reclamation and Environmental Services

    PDF

    Exhibit 2 “Basement ISWP” 223 N. Alabama St. Butte, MT 59701 January 2, 2025 Database Residential Identifier: R-00455, Butte-Silver Bow Department of Reclamation and Environmental Services

    PDF

    Exhibit 2 “Basement ISWP” 537 S. Colorado St. Butte, MT 59701 January 22, 2025 Database Residential Identifier: R-05338, Butte-Silver Bow Department of Reclamation and Environmental Services

    PDF

    Exhibit 2 “Basement ISWP” 604 S. Clark St. Butte, MT 59701 January 24, 2025 Database Residential Identifier: R-01537, Butte-Silver Bow Department of Reclamation and Environmental Services

    PDF

    Exhibit 2 “Basement ISWP” 615 W. Galena St. Butte, MT 59701 January 23, 2025 Database Residential Identifier: R-05384, Butte-Silver Bow Department of Reclamation and Environmental Services

    PDF

    EXPERIMENTS AND MODELING OF PMU UNDER GPS SPOOFING ATTACKS, Joshua Afosa-Baffoe

    PDF

    February 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson and Loren Burmeister

    PDF

    February 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson and Loren Burmeister

    PDF

    FENITIZATION OF MAFIC WALLROCK ASSOCIATED WITH EMPLACEMENT OF REE-RICH CARBONATITES OF SHEEP CREEK, SOUTHERN RAVALLI COUNTY, MONTANA, Tage Young

    PDF

    Final 2023 Residential Metals Abatement Program (RMAP) Gold Hill Lutheran Church (containing the Creativity Factory Preschool) Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

    PDF

    Final 2025 Residential Metals Abatement Program (RMAP) Butte KOA Playground Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

    PDF

    Final 2025 Residential Metals Abatement Program (RMAP) CCCS Gymnasium Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

    PDF

    Final 2025 Residential Metals Abatement Program (RMAP) Quality Assurance Project Plan (QAPP) Annual Update (Non-Residential Parcels and Residential Daycares), Pioneer Technical Services, Inc.

    PDF

    Final 2025 Residential Metals Abatement Program (RMAP) Quality Assurance Project Plan (QAPP) Annual Update (Residential Parcels), Pioneer Technical Services, Inc.

    PDF

    Final 2025 Residential Metals Abatement Program (RMAP) Rock Creek Cattle Company Borrow Submittal #1, Pioneer Technical Services, Inc.

    PDF

    Final Annual Operations and Maintenance (O&M) Report: Butte Treatment Lagoon (BTL) System – 2024, Pioneer Technical Services, Inc.

    PDF

    Final BPSOU Unreclaimed Sites: UR-05 Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

    PDF

    Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc.

    PDF

    Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc.

    PDF

    Final Butte Priority Soils Operable Unit (BPSOU) Insufficiently Reclaimed Sites Remedial Action Work Plan (RAWP): BRES No. 104 (Colorado Dump) North Slope, Pioneer Technical Services, Inc.

    PDF

    Final Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites: UR-03 Site Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

    PDF

    Final Butte Priority Soils Operable Unit (BPSOU) Unreclaimed (UR) Sites: UR-35 Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

    PDF

    Final Horseshoe Bend Effluent Line (HBEL) Discharge Structure Surface Enhancements Work Plan, Pioneer Technical Services, Inc.

    PDF

    Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.

    PDF

    Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023, Pioneer Technical Services, Inc.

    PDF

    Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2024, Pioneer Technical Services, Inc.

    PDF

    Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023, Pioneer Technical Services, Inc.

    PDF

    Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Third Quarter 2022, Pioneer Technical Services, Inc.

    PDF

    Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Third Quarter 2023, Pioneer Technical Services, Inc.

    PDF

    Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Third Quarter 2024, Pioneer Technical Services, Inc.

    PDF

    FINAL REMOVAL SIGN OFF Individual Site Work Plans 2025 Round 2 RMAP Basement Projects Butte, MT 59701 January 31, 2025, Butte-Silver Bow Department of Reclamation and Environmental Services and Atlantic Richfield Company

    PDF

    Final Silver Bow Creek Conservation Area (SBCCA) Butte Reduction Works (BRW) Air Monitoring for Interim Demolition Activities – Phase I Data Summary Report (DSR), Pioneer Technical Services, Inc.

    PDF

    Final Unreclaimed Sites Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.

    PDF

    Graphic Organizer for Taking Notes During a Lesson, Dawn Atkinson

    PDF

    GRAVITY FED BATHYMETRY AGNOSTIC WAVE SYSTEM INNOVATION & RESPONSIVE SURF FIN DEVELOPMENT, Erik Casagranda

    PDF

    How to Conduct a Discovery Interview to Address Academic Integrity Concerns, Dawn Atkinson and Stacey Corbitt

    PDF

    INVESTIGATION OF THE BOULDER PORPHYRY PROSPECT JEFFERSON COUNTY, MONTANA, Everett LaBudda

    PDF

    Ladder Safety: A Taxonomy of Limb-Movement Patterns for Three Points of Control, Roger C. Jensen and Charles Holland

    PDF

    Leadership in Higher Education Instructional Design, Shihua Brazill, Travis N. Thurston, and Pat Munday

    PDF

    Lesson Summary Sheet, Dawn Atkinson

    PDF

    L.G. Twidwell: A Summary of Fifty-Six Years of Research, Larry G. Twidwell

    PDF

    L.G. Twidwell: A Summary of Fifty-Six Years of Research, Larry G. Twidwell

    PDF

    L.G. Twidwell Fifty-Six Years of Research A Summary, Larry G. Twidwell

    PDF

    Magma 1949, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1951, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1952, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1953, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1954, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1956, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1958, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1959, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1961, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1962, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1963, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1964, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1966, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1967, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1969, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1971, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1972, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1973, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1974, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1976, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1977, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1977, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1978, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1979, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1981, Associated Students of the Montana College of Mineral Science and Technology

    PDF

    Magma 1982, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1983, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1984, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1986, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1987, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1988, Associated Students of the Montana College of Mineral Science and Technology

    PDF

    Magma 1989, Associated Students of the Montana College of Mineral Science and Technology

    PDF

    Magma 1991, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1992, Associated Students of the Montana State School of Mines.

    PDF

    Magma 1993, Associated Students of the Montana College of Mineral Science and Technology

    PDF

    Magma 1994, Associated Students of the Montana College of Mineral Science and Technology

    PDF

    Magma 1996, Associated Students of the Montana College of Mineral Science and Technology

    PDF

    Magma 1997, Associated Students of the Montana College of Mineral Science and Technology

    PDF

    Magma 2006, Montana Economic Revitalization & Development (MERDI)

    PDF

    Medical Monitoring Working Group Meeting Minutes, Mike McAnulty

    PDF

    Methods of Studying The Effects of Frothers, Frank L. Bazzanella

    PDF

    Mitigation of Impacts to Historic Features at the Butte Reduction Works (BRW) Smelter, Kate McCourt

    PDF

    Mitigation of Impacts to Historic Features at the Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site, Mitzi Rossillon

    PDF

    MODELING COPPER BIOGEOCHEMISTRY IN CONTINENTAL ENVIRONMENTS: 0 – 93 °C, Paul Goldsborough Helfrich

    PDF

    MONTHLY PROGRESS REPORT BUTTE PRIORITY SOILS OPERABLE UNIT CONSENT DECREE PARTIAL REMEDIAL DESIGN/REMEDIAL ACTION AND OPERATION AND MAINTENANCE, Josh Bryson

    PDF

    November 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson and Loren Burmeister

    PDF

    NRDP Comments on BP-Atlantic Richfield (BP-AR’s) Draft Materials Management Plan and Associated Documents at Butte Priority Soils Operable Unit of the Silver Bow Creek/Butte Area Superfund Site, Jim Ford

    PDF

    October 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson and Loren Burmeister

    PDF

    On-Site Water Management Field Sampling Plan (FSP), 2025 Update, Mark Thompson and Rampart Solutions

    PDF

    Peer Review Workshop, Dawn Atkinson

    PDF

    Process Intensification by Resonant Vibratory Mixing for the Recyclable Samarium - Cobalt Magnets after Chemical Leaching with Deep Eutectic Solvents, Zainab Nasrullah, Frank Agyemang, Mehran Saddat, and Richard LaDouceur

    PDF

    QUALITY ASSURANCE PROJECT PLAN, 2023 Butte Mine Flooding Operable Unit Long-Term Monitoring Program, Montana Bureau of Mines and Geology

    PDF

    QUANTIFYING MULTIPHASE FLOW IN SMALL-DIAMETER VERTICAL PIPES, Umaer Abdullah Zaki

    PDF

    Quick Guide to Punctuation, Dawn Atkinson

    PDF

    Quick Guide to Using Commas, Dawn Atkinson

    PDF

    Quick Guide to Writing Professional Emails, Dawn Atkinson

    PDF

    Quick Tips for Concise Writing, Dawn Atkinson

    PDF

    RARE EARTH MINERAL FLOTATION – A COMPARISON OF SILICATES TO OXIDES, CARBONATES AND PHOSPHATES, Abdul Mamudu

    PDF

    RE: 1st Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson

    PDF

    Re: 2025 Spring Migration Seasonal Report for Berkeley Pit Waterfowl Protection Plan, Mark Thompson and Loren Burmeister

    PDF

    RE: 2025 Spring Semi-Annual – Interim Site-Wide Groundwater Monitoring Data Report Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson

    PDF

    RE: 2nd Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson

    PDF

    RE: 3rd Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson

    PDF

    Re: Acknowledgement Letter for the Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report (dated February 27, 2025), Emma Rott

    PDF

    Re: Approval Letter for BPSOU Blacktail Creek Riparian Actions Draft Field Work Plan: Wetlands Delineation and Functional Assessment (received August 8, 2025), Emma Rott

    PDF

    Re: Approval Letter for BPSOU Blacktail Creek Riparian Actions Revised Draft Final Uniform Federal Policy Quality Assurance Project Plan (dated September 30, 2025), Emma Rott

    PDF

    Re: Approval Letter for Butte Priority Soils Operable Unit (BPSOU) Draft Final 2024 Subdrain Data Summary Report (dated April 30, 2025), Emma Rott

    PDF

    Re: Approval Letter for Butte Priority Soils Operable Unit (BPSOU) Superfund Operation and Maintenance (O&M) Request for Maintenance – Kelley Stormwater Channels (revised on July 23, 2025), Emma Rott

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Butte Reduction Works (BRW) Phase II Interim Demolition Plan Construction Drawings and Floodplain Encroachment Analysis (dated November 27, 2024), Emma Rott

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Butte Treatment Lagoons (BTL) Groundwater Treatment System Quarterly Operation and Maintenance Report – Quarter 1 2025 (dated June 30, 2025), Emma Rott

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Butte Treatment Lagoons (BTL) Groundwater Treatment System Quarterly Operation and Maintenance Report – Quarter 4 2024 (dated March 28, 2025), Emma Rott

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Butte Treatment Lagoons (BTL) Groundwater Treatment System Routine Operations, Maintenance, and Monitoring (OM&M) Plan (dated August 29, 2025), Emma Rott

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU), Draft 2024 Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) – Montana Technological University (Prospector Residence Hall) (dated March 21, 2024), Molly Roby

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU), Draft Final 2021-2022 Residential Metals Abatement Program – Aware Early Head Start Soil Remedial Action Construction Completion Report (dated April 26, 2024), Molly Roby

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU), Draft Final 2021 Residential Metals Abatement Program – Head Start (former Lincoln School) Soil Remedial Action Construction Completion Report (dated April 26, 2024), Molly Roby

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final 2022 Unreclaimed Sites Sampling: UR-28 Site Evaluation Summary Report (dated April 23, 2025), Molly Roby

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final 2025 Residential Metals Abatement Program (RMAP) Rock Creek Cattle Company Borrow Submittal #1 (dated May 23, 2025), Molly Roby

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final BRES No. 35 Del Monte Reclamation Improvement Sites Field Sampling (FSP) (dated August 14, 2025), Molly Roby

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites Field Sampling (FSP): BRES No.177 - North Alice Culvert (dated August 21, 2025), Molly Roby

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (FSP): BRES No. 100 – Capri Motel-Arctic Dump (dated August 12, 2025), Molly Roby

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (FSP): BRES No. 18 – Walkerville Ballfield (dated August 13, 2025), Molly Roby

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (FSP): BRES No. 26 – Cripple Dump (dated August 21, 2025), Molly Roby

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites Remedial Action Work Plan (RAWP): BRES No. 104 – (Colorado Dump) North Slope (dated October 17, 2025), Molly Roby

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) – United Congregational Church (Crayon Academy Preschool) (dated April 2, 2024), Molly Roby

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Residential Metals Abatement Program (RMAP) – Interior School Dust - Investigation Summary Report – East Middle School (dated January 16, 2024), Molly Roby

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Unreclaimed Sites Field Sampling Plan (FSP) Package #11: UR-49 and UR-50 (dated May 6, 2024), Molly Roby

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Residential Metals Abatement Program Investigation Summary Report (Non‐Residential Parcels – Indoor Dust) – CCCS Gym Annex (dated October 4, 2024), Molly Roby

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Final BPSOU Insufficiently Reclaimed Sites Belle of Butte (BRES No. 8 & UR-39) Remedial Action Work Plan (RAWP) Request for Change IR-2024-RA-02 (dated December 19, 2024), Molly Roby

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Final Insufficiently Reclaimed Sites Field Sampling Plan (FSP): UR- 19 – Butte, Anaconda & Pacific Railway from Montana Street to South Arizona Avenue – Montana Street Adjacent Parcel (dated August 13, 2025), Molly Roby

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Final Multi-Pathway Residential Metals Abatement Program (RMAP) Plan (dated March 27, 2025), Molly Roby

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Insufficiently Reclaimed Sites Sampling: BRES No. 84 Site Evaluation Summary Report (dated April 11, 2025), Molly Roby

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Request for Change (RFC-RMAP-2024-001) (dated May 9, 2024), Molly Roby

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Residential Metals Abatement Program (RMAP) Residential Daycares Field Sampling Plan (FSP) – Submittal R- 04941 and R-04947 (dated November 5, 2024), Molly Roby

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Revised Draft Final Insufficiently Reclaimed Sites BRES No. 158 Site Evaluation Summary Report (dated February 24, 2025), Molly Roby

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (FSP): BRES No. 120 – Bonanza Dump (dated August 12, 2025), Molly Roby

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Revised Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (dated May 27, 2025), Molly Roby

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Revised Draft Final Reclamation Improvement Sites Field Sampling and Investigation Plan (FSP): BRES No. 45 – Garfield Response to Agency comments (dated August 14, 2025), Molly Roby

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Revised Draft Final Unreclaimed Sites (UR-05) Remedial Action Work Plan (RAWP) (dated June 10, 2025), Molly Roby

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Revised Final Multi- Pathway Residential Metals Abatement Program (RMAP) Plan (dated January 13, 2025), Molly Roby

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Revised Insufficiently Reclaimed Sites BRES No. 158 – Waste Rock Dump Remedial Action Work Plan (RAWP) (dated June 24, 2025), Molly Roby

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites and Insufficiently Reclaimed Areas – Racetrack Borrow Material Usage (dated December 19, 2024), Molly Roby

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites UR-46 Temporary Best Management Practices Work Plan (dated October 17, 2025), Molly Roby

    PDF

    Re: Approval Letter for the Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area 2019-2023 Data Summary Report and Response to EPA Comments (dated September 24, 2025), Emma Rott

    PDF

    Re: Approval letter for the Butte Priority Soils Operable Unit, Residential Metals Abatement Program Construction Completion Report (Non-Residential Parcels-Indoor Dust) - Butte Career Center/Webster Garfield (dated March 29, 2024), Molly Roby

    PDF

    Re: Approval Letter for the Draft Final Butte Reduction Works (BRW) Air Monitoring for Interim Demolition Activities – Phase I Data Summary Report (dated March 21, 2025), Emma Rott

    PDF

    Re: Approval Letter for the Draft Final Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Phase III Quality Assurance Project Plan (QAPP) (dated February 27, 2025), Emma Rott

    PDF

    Re: Approval Letter for the Draft Final Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (QAPP) for Microbial Analysis and Biotreatability Study (dated February 27, 2025), Emma Rott

    PDF

    Re: Approval letter for the Final Butte Priority Soils Operable Unit (BPSOU) Butte Treatment Lagoons (BTL) Groundwater Treatment System Quarterly Operation and Maintenance Report – Quarter 1 2024 (dated August 14, 2025), Emma Rott

    PDF

    Re: Approval letter for the Final Butte Priority Soils Operable Unit (BPSOU) Butte Treatment Lagoons (BTL) Groundwater Treatment System Quarterly Operation and Maintenance Report – Quarter 2 2024 (dated August 19, 2025), Emma Rott

    PDF

    Re: Approval letter for the Final Silver Bow Creek Conservation Area Repository Data Gap Data Summary Report (dated April 4, 2025), Emma Rott

    PDF

    Re: Approval letter for the Response to Comment Letter and the Butte Priority Soils Operable Unit (BPSOU) Draft 2024 Butte Reclamation Evaluation System (BRES) Corrective Action Plans for Reclaimed Sites (both dated June 6, 2025), Molly Roby

    PDF

    Re: Approval letter with comment for the Butte Priority Soils Operable Unit (BPSOU) 2025 Revised Draft Final Unreclaimed Sites: UR-03 Site Remedial Action Work Plan (RAWP) (dated June 2, 2025), Molly Roby

    PDF

    Re: Approval letter with comments for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Annual Operations and Maintenance (O&M) Butte Treatment Lagoons (BTL) System 2024 (dated May 30, 2025), Emma Rott

    PDF

    Re: Approval of: Berkeley Pit and Discharge Pilot Project Temperature Evaluation, 2023 Update, dated June 28, 2024., Jason Rappe

    PDF

    Re: Approval of: Operations and Maintenance Manual, Horseshoe Bend Water Treatment Plant, dated July 26, 2024., Jason Rappe

    PDF

    Re: Approval of the Butte Priority Soils Operable Unit (BPSOU) Butte Reclamation Evaluation System (BRES) Revised Draft 2024 Field Evaluation Summary and Technical Recommendations Report (dated June 4, 2025), Molly Roby

    PDF

    Re: Approval of the Revised Draft Final Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (QAPP) (dated 5/7/24), Emma Rott

    PDF

    Re: August 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson and Loren Burmeister

    PDF

    Re: August 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson and Loren Burmeister

    PDF

    RE: BPSOU Superfund Stormwater Operation and Maintenance (O&M) Request for Maintenance – Kelley Stormwater Channels, Josh Bryson

    PDF

    Re: Butte Mine Flooding Operable Unit Berkeley Pit and Discharge Pilot Project – August 2024 Monthly Discharge Monitoring Report, Mark Thompson and Dave Griffis

    PDF

    Re: Butte Mine Flooding Operable Unit Berkeley Pit and Discharge Pilot Project – August 2025 Monthly Discharge Monitoring Report, Mark Thompson and Dave Griffis

    PDF

    Re: Butte Mine Flooding Operable Unit Berkeley Pit and Discharge Pilot Project – December 2024 Monthly Discharge Monitoring Report, Mark Thompson and Dave Griffis

    PDF

    Re: Butte Mine Flooding Operable Unit Berkeley Pit and Discharge Pilot Project – July 2025 Monthly Discharge Monitoring Report, Mark Thompson and Dave Griffis

    PDF

    Re: Butte Mine Flooding Operable Unit Berkeley Pit and Discharge Pilot Project – June 2025 Monthly Discharge Monitoring Report, Mark Thompson and Dave Griffis

    PDF

    Re: Butte Mine Flooding Operable Unit Berkeley Pit and Discharge Pilot Project – May 2025 Monthly Discharge Monitoring Report, Mark Thompson and Dave Griffis

    PDF

    Re: Butte Mine Flooding Operable Unit Berkeley Pit and Discharge Pilot Project – November 2024 Monthly Discharge Monitoring Report, Mark Thompson and Dave Griffis

    PDF

    Re: Butte Mine Flooding Operable Unit Berkeley Pit and Discharge Pilot Project – October 2024 Monthly Discharge Monitoring Report, Mark Thompson and Dave Griffis

    PDF

    Re: Butte Mine Flooding Operable Unit Berkeley Pit and Discharge Pilot Project – September 2024 Monthly Discharge Monitoring Report, Mark Thompson and Dave Griffis

    PDF

    Re: BUTTE MINE FLOODING SITE CD, CV 02-35 Bu-RFC, 2024 Fourth Quarter Report, Mark Thompson and Dave Griffis

    PDF

    Re: BUTTE MINE FLOODING SITE CD, CV 02-35 Bu-RFC, 2024 Third Quarter Report, Mark Thompson and Dave Griffis

    PDF

    Re: BUTTE MINE FLOODING SITE CD, CV 02-35 Bu-RFC, 2025 Second Quarter Report, Mark Thompson and Dave Griffis

    PDF

    RE: Butte Priority Soil Operable Unit (BPSOU) Final BRES No. 35 Del Monte Reclamation Improvement Field Sampling Plan, Mike McAnulty

    PDF

    RE: Butte Priority Soil Operable Unit (BPSOU) Final BRES No.94 – Rialto Dump Reclamation Improvement (RI) Field Sampling Plan (FSP), Mike McAnulty

    PDF

    RE: Butte Priority Soil Operable Unit (BPSOU) Final Insufficiently Reclaimed Sites Field Sampling Plan (FSP): BRES No. 177 – North Alice Culvert, Mike McAnulty

    PDF

    RE: Butte Priority Soil Operable Unit (BPSOU) Final Insufficiently Reclaimed Sites Field Sampling Plan (FSP): BRES No. 91 – Robert Emmett Dump, Mike McAnulty

    PDF

    RE: Butte Priority Soils Operable Unit (BPSOU) 2025 Monthly Progress Report. Consent Decree for the Butte Priority Soils Operable Unit. Civil Action No. CV 89-039-BU-SEH, Josh Bryson

    PDF

    Re: Butte Priority Soils Operable Unit (BPSOU) Draft Final BRES No. 35 Del Monte Reclamation Improvement Field Sampling Plan (FSP), Mike McAnulty

    PDF

    Re: Butte Priority Soils Operable Unit (BPSOU) Draft Final BRES No. 94 – Rialto Dump Reclamation Improvement (RI) Field Sampling Plan (FSP)., Mike McAnulty

    PDF

    Re: Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites Field Sampling and Investigation Plan (FSP): BRES No. 177 – North Alice Culvert, Mike McAnulty

    PDF

    Re: Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites Field Sampling and Investigation Plan (FSP): BRES No. 91 – Robert Emmett Dumps, Mike McAnulty

    PDF

    Re: Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (FSP) BRES No. 121 – Travona Dump., Mike McAnulty

    PDF

    Re: Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (FSP) BRES No. 125 – Child Harold-2 Dump., Mike McAnulty

    PDF

    Re: Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (FSP): BRES No. 26 – Cripple Dump, Mike McAnulty

    PDF

    Re: Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (FSP) BRES No. 34E – Eveline Dump East., Mike McAnulty

    PDF

    Re: Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (FSP) BRES No. 49 – Old Glory., Mike McAnulty

    PDF

    Re: Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (FSP) BRES No. 52 – Moscow Dump., Mike McAnulty

    PDF

    Re: Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (FSP) BRES No. 74 – West Gagnon Dump., Mike McAnulty

    PDF

    Re: Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (FSP) BRES No. 78 – Original Mine Yard., Mike McAnulty

    PDF

    Re: Butte Priority Soils Operable Unit (BPSOU) Final Insufficiently Reclaimed Sites Field Sampling and Investigation Plan (FSP): BRES No. 100 – Capri Motel – Arctic Dump, Mike McAnulty

    PDF

    Re: Butte Priority Soils Operable Unit (BPSOU) Final Insufficiently Reclaimed Sites Field Sampling and Investigation Plan (FSP): BRES No. 120 – Bonanza Dump, Mike McAnulty

    PDF

    RE: Butte Priority Soils Operable Unit (BPSOU) Final Insufficiently Reclaimed Sites Field Sampling and Investigation Plan (FSP) for UR-19 – Butte, Anaconda & Pacific Railway from Montana Street to South Arizona Avenue – Montana Street Adjacent Parcel, Mike McAnulty

    PDF

    Re: Butte Priority Soils Operable Unit (BPSOU) Final Insufficiently Reclaimed Sites Field Sampling Plan (FSP): BRES No. 181 – Mountain Con-3 Dump., Mike McAnulty

    PDF

    Re: Butte Priority Soils Operable Unit (BPSOU) Final Insufficiently Reclaimed Sites Field Sampling Plan (FSP): BRES No. 26 – Cripple Dump, Mike McAnulty

    PDF

    Re: Butte Priority Soils Operable Unit (BPSOU) Final Reclamation Improvement Sites Field Sampling and Investigation Plan (FSP): BRES No. 18 – Walkerville Ballfield, Mike McAnulty

    PDF

    Re: Butte Priority Soils Operable Unit (BPSOU) Final Reclamation Improvement Sites Field Sampling and Investigation Plan (FSP): BRES No. 45 – Garfield, Mike McAnulty

    PDF

    RE: Butte Priority Soils Operable Unit (BPSOU) Superfund Operation and Maintenance (O&M) Request for Maintenance – Kelley Stormwater Channels (Dated April 22, 2025), Josh Bryson

    PDF

    RE: Butte Priority Soils Operable Unit Final Leak Infiltration Evaluation, Josh Bryson

    PDF

    RE: Butte Priority Soils Operable Unit Revised Draft Final Reclamation Improvement Sites Field Sampling and Investigation Plan (FSP): BRES No. 45 – Garfield Response to Agency comments received June 28, 2024, Mike McAnulty

    PDF

    Re: Comment Letter for 2024 Annual Operations and Maintenance Report Butte Reclamation Evaluation System (BRES) Annual Summary Report for Work Completed in Quadrant 4 (dated May 1, 2025), Molly Roby

    PDF

    Re: Comment Letter for BPSOU Blacktail Creek Riparian Actions Revised Draft Final Uniform Federal Policy Quality Assurance Project Plan (dated July 31, 2025), Emma Rott

    PDF

    Re: Comment Letter for BPSOU Draft Final Phase I Design Investigation Evaluation Report and Response to Comments, Blacktail Creek Riparian Actions (dated January 24, 2025), Emma Rott

    PDF

    Re: Comment Letter for BPSOU Draft Phase I Design Investigation Evaluation Report (dated September 25, 2024), Emma Rott

    PDF

    Re: Comment Letter for BPSOU Uncontrolled Surface Flow Areas Drainage C 30% Design RAWP (dated June 23, 2025), Molly Roby

    PDF

    Re: Comment Letter for Butte Priority Soils Operable Unit Berkeley Pit Geochemical and Limnological Evaluation Pre-Design Investigation (PDI) Work Plan (dated December 17, 2024), Emma Rott

    PDF

    Re: Comment Letter for Butte Priority Soils Operable Unit (BPSOU) Draft 2024 Groundwater Monitoring Data Summary Report (dated May 30, 2025), Emma Rott

    PDF

    Re: Comment Letter for Butte Priority Soils Operable Unit (BPSOU) Draft 2024 Site-Wide Surface Water Monitoring Data Summary Report (dated May 30, 2025), Emma Rott

    PDF

    Re: Comment Letter for Butte Priority Soils Operable Unit (BPSOU), Draft Preliminary (30%) Remedial Design Report, Blacktail Creek Riparian Actions (dated July 28, 2025), Emma Rott

    PDF

    Re: Comment Letter for Butte Priority Soils Operable Unit (BPSOU) Notice of Intent to Abandon BPS07-05A and BPS07-05B (dated July 14, 2025), Emma Rott

    PDF

    Re: Comment Letter for Butte Priority Soils Operable Unit (BPSOU) Principles for a Greener Cleanup Report (dated December 23, 2024), Emma Rott

    PDF

    Re: Comment Letter for Butte Priority Soils Operable Unit (BPSOU) Residential Metals Abatement Program (RMAP) Plan (dated October 29, 2024), Molly Roby

    PDF

    Re: Comment Letter for Butte Priority Soils Operable Unit (BPSOU) Superfund Operation and Maintenance (O&M) Request for Maintenance – Kelley Stormwater Channels (dated April 22, 2025), Emma Rott

    PDF

    Re: Comment Letter for Butte Priority Soils Operable Unit Draft Final Leak Infiltration Evaluation (dated July 24, 2025), Emma Rott

    PDF

    Re: Comment Letter for Butte Priority Soils Operable Unit Subdrain Pump Station 30% Remedial Design Package Submittal (dated January 31, 2025), Emma Rott

    PDF

    Re: Comment Letter for Clark Tailings Consolidated Waste Management Area (CTCWMA) Site Investigation Quality Assurance Project Plan Revision 01 (dated June 6, 2025), Emma Rott

    PDF

    Re: Comment Letter for Diggings East 95 % Remedial Design Package Submittal (dated August 29, 2025), the Silver Bow Creek Conservation Area (SBCCA) – 95 Percent Programmatic Technical Specifications Submittal (dated August 19, 2025), the Draft Final SBCCA Construction Quality Assurance Plan (dated August 20, 2025) and the Butte Priority Soils SBCCA Operations and Maintenance (O&M) Plan (dated August 14, 2025), Emma Rott

    PDF

    Re: Comment Letter for Draft Blacktail Creek Groundwater Hydraulic Control System Preliminary 30% Remedial Design Report (dated October 28, 2024), Emma Rott

    PDF

    Re: Comment Letter for Draft BPSOU Blacktail Creek Riparian Actions Remedial Design Work Plan (RDWP) (dated April 4, 2024), Emma Rott

    PDF

    Re: Comment Letter for Draft Final BPSOU Unreclaimed Site Anderson Shaft Remedial Action Work Plan (RAWP) (dated June 14, 2024), Molly Roby

    PDF

    Re: Comment Letter for Draft Final Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites UR-05 Remedial Action Work Plan (RAWP) (dated March 14, 2025), Molly Roby

    PDF

    Re: Comment Letter for Final BPSOU Insufficiently Reclaimed Sites Belle of Butte (BRES No. 8 & UR-39) Remedial Action Work Plan (RAWP) Request for Change IR-2024-RA-01 (dated December 3, 2024), Molly Roby

    PDF

    Re: Comment Letter for the 2022 Butte Priority Soils Operable Unit (BPSOU) Groundwater Compliance Evaluation (dated March 10, 2025), Emma Rott

    PDF

    Re: Comment Letter for the 2023 Butte Priority Soils Operable Unit (BPSOU) Groundwater Compliance Evaluation (dated March 10, 2025), Emma Rott

    PDF

    Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) 2022 Draft Final Insufficiently Reclaimed Sites Sampling: BRES No. 158 Site Evaluation Summary Report (dated November 21, 2024), Molly Roby

    PDF

    Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) 2022 Draft Final Insufficiently Reclaimed Sites Sampling BRES No. 30 – Atlantic 1 Site Evaluation Summary Report (dated February 24, 2025), Molly Roby

    PDF

    Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) 2022 Draft Final Insufficiently Reclaimed Sites Sampling: BRES No. 32 Site Evaluation Summary Report (dated December 11, 2024), Molly Roby

    PDF

    Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) 2022 Draft Final Insufficiently Reclaimed Sites Sampling: BRES No. 37 – Josephine Shaft Site Evaluation Summary Report (December 6, 2024), Molly Roby

    PDF

    Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) 2022 Draft Final Insufficiently Reclaimed Sites Sampling: BRES No. 38 – Sister Dump Site Evaluation Summary Report (December 31, 2024), Molly Roby

    PDF

    Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) 2024 Draft Final Backfill and Cover Material Quality Assurance Project Plan (dated September 27, 2024), Molly Roby

    PDF

    Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Butte Reclamation Evaluation System (BRES) Draft 2024 Corrective Action Plans (dated January 27, 2025), Molly Roby

    PDF

    Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Butte Treatment Lagoons (BTL) Groundwater Treatment System Quarterly Operation and Maintenance Report – Quarter 2 2025 (dated September 30, 2025), Emma Rott

    PDF

    Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Butte Treatment Lagoons (BTL) Groundwater Treatment System Routine Operations, Maintenance, and Monitoring (OM&M) Plan (dated December 10, 2024), Emma Rott

    PDF

    Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final 2022 Unreclaimed Sites Sampling: UR-06 Site Evaluation Summary Report (dated April 1, 2025), Molly Roby

    PDF

    Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final 2022 Unreclaimed Sites Sampling: UR-12 Site Evaluation Summary Report (dated April 8, 2025), Molly Roby

    PDF

    Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final 2025 Residential Metals Abatement Program (RMAP) Valley Sand & Gravel (Builders FirstSource) Borrow Submittal #1 (dated June 27, 2025), Molly Roby

    PDF

    Re: Comment Letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report (dated September 16, 2024), Emma Rott

    PDF

    Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Materials Management Plan (dated November 21, 2024), Emma Rott

    PDF

    Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Residential Metals Abatement Program (RMAP) Quality Assurance Project Plan (QAPP) (Non-Residential Parcels and Residential Daycares) (dated February 26, 2025), Molly Roby

    PDF

    Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Residential Metals Abatement Program (RMAP) Quality Assurance Project Plan (QAPP) (Residential Parcels) (dated February 26, 2025), Molly Roby

    PDF

    Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Unreclaimed (UR) Sites UR-13 Site Evaluation Summary Report (SESR) (November 1, 2024), Molly Roby

    PDF

    Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Insufficiently Reclaimed Sites BRES No. 158 – Waste Rock Dump Remedial Action Work Plan (RAWP) (dated March 28, 2025), Molly Roby

    PDF

    Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Insufficiently Reclaimed Sites Josephine Shaft (IR-37) Remedial Action Work Plan (RAWP) (dated February 6, 2025), Molly Roby

    PDF

    Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites UR-22 Site Evaluation Summary Report (dated April 2, 2025), Molly Roby

    PDF

    Re: Comment letter for the Draft Final Butte Priority Soils Operable Unit (BPSOU) 2022 Unreclaimed Sites Sampling: UR-20 Site Evaluation Summary Report (dated March 19, 2025), Molly Roby

    PDF

    Re: Comment letter for the Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites New and Mahoney (UR-23) Construction Completion Report., Molly Roby

    PDF

    Re: Comment Letter for the Draft Final Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (QAPP) for Microbial Analysis and Biotreatability Study (dated October 10, 2024), Emma Rott

    PDF

    Re: Comment letter for the Draft Final Silver Bow Creek Conservation Area Repository Data Gap Data Summary Report (dated January 3, 2025), Emma Rott

    PDF

    Re: Comment letter for the Final Butte Reduction Works (BRW) Smelter Area Waste Remediation and Contaminated Groundwater Hydraulic Control Site Air Monitoring Quality Assurance Project Plan (QAPP) for Interim Demolition Activities (dated May 19, 2025), Emma Rott

    PDF

    Re: Comments on: Draft Final Horseshoe Bend Effluent Line (HBEL) Discharge Structure Surface Enhancements Work Plan, dated August 26, 2024., Jason Rappe

    PDF

    Re: Comments on: Horseshoe Bend Water Treatment Plan [HSBWTP] 2021 Annual Report; dated November 15, 2022, Nikia Greene

    PDF

    Re: Comments on the Draft Final Butte Mine Waste Repository Geotechnical Investigation Work Plan (dated September 23, 2025), Emma Rott

    PDF

    Re: Comments on the Repository, Haul Route, and Pipeline Geotechnical Pre-Design Investigation Summary Report (dated December 30, 2024), Emma Rott

    PDF

    Re: Comments on the Repository, Haul Route, and Pipeline Geotechnical Pre-Design Investigation Summary Report (dated May 13, 2025), Emma Rott

    PDF

    Re: Conditional Approval Letter Butte Priority Soils Operable Unit Grove Gulch Sedimentation Bay 100% Remedial Design (dated March 22, 2024), Emma Rott

    PDF

    Re: Conditional Approval Letter for Butte Priority Soils (BPSOU) Draft Blacktail Creek Riparian Actions Remedial Design Work Plan (dated May 1, 2025, received July 28, 2025), Emma Rott

    PDF

    Re: Conditional approval letter for the Butte Priority Soils Operable Unit (BPSOU) 2025 Revised Draft Final Unreclaimed Sites Quality Assurance Project Plan (QAPP) (dated May 15, 2025), Molly Roby

    PDF

    Re: Conditional approval letter for the Butte Priority Soils Operable Unit (BPSOU) 2025 Revised Draft Final Unreclaimed Sites Quality Assurance Project Plan (QAPP) (dated May 15, 2025), Molly Roby

    PDF

    Re: Conditional approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoons (BTL) System – Third Quarter 2024 (dated December 23, 2024), Emma Rott

    PDF

    Re: Conditional Approval Letter for the Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan Revision 0 (2025 Update) and Response to EPA Comments. (dated September 16, 2025), Emma Rott

    PDF

    Re: Conditional Approval Letter for the Final Butte Mine Waste Repository Geotechnical Investigation Work Plan (dated November 14, 2025), Emma Rott

    PDF

    Re: Condition Approval Letter for BPSOU Draft Final Phase I Design Investigation Evaluation Report, Blacktail Creek Riparian Actions (dated May 2, 2025, received July 28, 2025), Emma Rott

    PDF

    RE: Continued Use of the Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson

    PDF

    RE: Continued Use of the Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson

    PDF

    RE: Continued Use of the Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson

    PDF

    RE: Continued Use of the Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson

    PDF

    Re: December 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson and Loren Burmeister

    PDF

    RE: Draft Final 2023 Residential Metals Abatement Program (RMAP) Butte-Silver Bow Parks Soil Remedial Action Construction Completion Report (CCR), Pioneer Technical Services, Inc.

    PDF

    RE: Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report, Josh Bryson

    PDF

    RE: Final Request for Change (RFC-RMAP-2024-001), Mike McAnulty

    PDF

    Re: January 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson and Loren Burmeister

    PDF

    Re: July 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson and Loren Burmeister

    PDF

    Re: June 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson and Loren Burmeister

    PDF

    Re: Letter response to Butte Priority Soils Operable Unit (BPSOU) Continued Use of the Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area NPL Site (dated September 15, 2025), Emma Rott

    PDF

    Re: Letter response to Butte Priority Soils Operable Unit (BPSOU) Continued Use of the Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area NPL Site (dated September 15, 2025), Emma Rott

    PDF

    RE: Medical Monitoring Working Group Meeting Minutes, Mike McAnulty and Eric Hassler

    PDF

    RE: Medical Monitoring Working Group Meeting Minutes, Mike McAnulty and Eric Hassler

    PDF

    Re: Pilot Project 2025 Annual Update, Mark Thompson and Loren Burmeister

    PDF

    Request for Change (RFC-RMAP-2024-002), Mike McAnulty and Eric Hassler

    PDF

    RE: Request for Change (RFC-RMAP-2024-001), Mike McAnulty

    PDF

    RE: Revised Draft Final Butte Priority Soils Operable Unit (BPSOU) Insufficiently Reclaimed Sites: BRES No. 158 (Waste Rock Dump) Remedial Action Work Plan (RAWP), Mike McAnulty

    PDF

    RE: Revised Draft Final Insufficiently Reclaimed Sites Field Sampling and Investigation Plan (FSP): BRES No. 120 – Bonanza Dump, Mike McAnulty

    PDF

    Residential Metals Abatement Program Construction Completion Report Butte Career Center / Webster Gar􀏐ield, Christopher Berg, Thomas J. Beckman, and Environmental Resource Management (ERM)

    PDF

    Residential Metals Abatement Program Construction Completion Report East Middle School, Environmental Resource Management (ERM)

    PDF

    Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - CCCS Gym Annex, Christopher Berg and Thomas J. Beckman

    PDF

    Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) East Middle School, Environmental Resource Management (ERM)

    PDF

    RE: Silver Bow Creek Butte Area NPL Site 1 st Quarter 2023 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. CV 89- 039-BU-SHE, Josh Bryson

    PDF

    RE: Silver Bow Creek Butte Area NPL Site 2 nd Quarter 2023 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. CV 89- 039-BU-SHE, Josh Bryson

    PDF

    RE: Silver Bow Creek Butte Area NPL Site 3rd Quarter 2023 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. CV 89- 039-BU-SHE, Josh Bryson

    PDF

    RE: Silver Bow Creek Butte Area NPL Site 3rd Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. CV 89- 039-BU-SHE, Josh Bryson

    PDF

    RE: Silver Bow Creek Butte Area NPL Site 4th Quarter 2023 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. CV 89- 039-BU-SHE, Josh Bryson

    PDF

    RE: Silver Bow Creek Butte Area NPL Site 4th Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. CV 89- 039-BU-SHE, Josh Bryson

    PDF

    RE: Silver Bow Creek Butte Area NPL Site Fall Semi-Annual 2023 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent DecreeCivil Action No. CV 89-039-BU-SHE, Josh Bryson

    PDF

    RE: Silver Bow Creek Butte Area NPL Site Fall Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. CV 89-039-BU-SHE, Josh Bryson

    PDF

    RE: Silver Bow Creek Butte Area NPL Site Spring Semi-Annual 2023 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree - Civil Action No. CV 89-039-BU-SHE, Josh Bryson

    PDF

    RE: Silver Bow Creek Butte Area NPL Site Spring Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. CV 89-039-BU-SHE, Josh Bryson

    PDF

    RE: Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (QAPP), Josh Bryson

    PDF

    RESPONSE TO EPA COMMENTS DATED SEPTEMBER 16, 2025 FOR THE BLACKTAIL CREEK RIPARIAN ACTIONS UNIFORM FEDERAL POLICY - QUALITY ASSURANCE PROJECT PLAN SILVER BOW CREEK/BUTTE AREA SUPERFUND SITE SILVER BOW COUNTY, MONTANA, Environmental Protection Agency

    PDF

    Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: BRES No. 158 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

    PDF

    Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: BRES No. 30 – Atlantic-1 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

    PDF

    Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: BRES No. 32 – Corra 2 Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.

    PDF

    Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: BRES No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc.

    PDF

    Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: BRES No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc.

    PDF

    Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: BRES No. 38 – Sister Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.

    PDF

    Revised Draft Final 2022 Unreclaimed Sites Sampling: UR-13 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

    PDF

    Revised Draft Final 2022 Unreclaimed Sites Sampling: UR-20 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

    PDF

    Revised Draft Final Annual Operations and Maintenance (O&M) Report: Butte Treatment Lagoon (BTL) System – 2023, Pioneer Technical Services, Inc.

    PDF

    Revised Draft Final BPSOU Unreclaimed Sites: UR-05 Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

    PDF

    Revised Draft Final Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites: UR-03 Site Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

    PDF

    Revised Draft Final Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites: UR-08 (Anderson Shaft) Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

    PDF

    Revised Draft Final Butte Treatment Lagoons (BTL) Groundwater Treatment System Routine Operations, Maintenance, and Monitoring (OM&M) Plan, Pioneer Technical Services, Inc.

    PDF

    Revised Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – First Quarter 2024, Pioneer Technical Services, Inc.

    PDF

    Revised Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Second Quarter 2024, Pioneer Technical Services, Inc.

    File

    REVISED DRAFT FINAL UNIFORM FEDERAL POLICYQUALITY ASSURANCE PROJECT PLAN, HydroGeoLogic, Inc.

    PDF

    REVISED FINAL - MULTI-PATHWAY RESIDENTIAL METALS ABATEMENT PROGRAM PLAN, Butte-Silver Bow Department of Reclamation and Environmental Services and Atlantic Richfield Company

    PDF

    REVISED FINAL MULTI-PATHWAY RESIDENTIAL METALS ABATEMENT PROGRAM PLAN, Atlantic Richfield Company and Butte Silver Bow

    PDF

    REVISED FINAL MULTI-PATHWAY RESIDENTIAL METALS ABATEMENT PROGRAM PLAN, Atlantic Richfield Company and Butte Silver Bow

    PDF

    REVISED FINAL UNIFORM FEDERAL POLICY- QUALITY ASSURANCE PROJECT PLAN, HydroGeoLogic, Inc.

    PDF

    REVISED FINAL UNIFORM FEDERAL POLICYQUALITY ASSURANCE PROJECT PLAN, HydroGeoLogic, Inc.

    PDF

    Scholarly Writing Conventions, Dawn Atkinson

    PDF

    Selective Leaching of Rare Earth Elements from Complex Rare Earth Ore Using Deep Eutectic Solvents, Frank Agyemang, Mehran Saddat, Zainab Nasrullah, and Richard LaDouceur

    PDF

    Sentence Structure, Dawn Atkinson

    PDF

    Sentence Structure, Dawn Atkinson

    PDF

    September 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson and Loren Burmeister

    PDF

    Settling Defendants BMFOU Annual Report Consent Decree for the Butte Mine Flooding Site CD, CV 02-35 Bu-RFC Remedial Action – Implementation of the Remedy Horseshoe Bend Water Treatment Plant 2024 Annual Report, Mark Thompson and Dave Griffis

    PDF

    Silver Bow Creek Butte Area NPL Site 3rd Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. CV 89- 039-BU-SHE, Josh Bryson

    PDF

    Silver Bow Creek Butte Area NPL Site 4th Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. CV 89- 039-BU-SHE, Josh Bryson

    PDF

    Silver Bow Creek Butte Area NPL Site Fall Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. CV 89-039-BU-SHE, Josh Bryson

    PDF

    Silver Bow Creek Butte Area NPL Site Spring Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. CV 89-039-BU-SHE, Josh Bryson

    PDF

    SNOWMELT RUNOFF DRIVEN HYDROPOWER MODELLING BASED ON SPACEBORNE REMOTELY SENSED AND GROUND WEATHER NETWORK DATA, Ninad Bhagwat

    PDF

    “Sometimes I Have to Figure Things Out by Talking About Them”: Conceptualizing Think-Aloud Protocols as Spaces for Reflexivity During Open Textbook Construction, Dawn Atkinson and Stacey Corbitt

    PDF

    Submittal of Operations and Maintenance Manual for the Horseshoe Bend Water Treatment Plant, Dave Griffis and Mark Thompson

    PDF

    SURFACE CHEMISTRY AND ADSORPTION MECHANISM OF ORFOM® D8 FOR Cu DEPRESSION IN Cu-Mo FLOTATION, Patrick Jeff Mensah

    PDF

    Technical Memorandum - RE: 2022 Butte Priority Soils Operable Unit (BPSOU) Groundwater Compliance Evaluation, Paddy Stoy

    PDF

    TECHNICAL MEMORANDUM - RE: 2022 Butte Priority Soils Operable Unit (BPSOU) Groundwater Compliance Evaluation, Paddy Stoy

    PDF

    Technical Memorandum - RE: 2022 Butte Priority Soils Operable Unit (BPSOU) Groundwater Compliance Evaluation, Paddy Stoy

    PDF

    Technical Memorandum - RE: 2023 Butte Priority Soils Operable Unit (BPSOU) Groundwater Compliance Evaluation, Paddy Stoy

    PDF

    Tetracapsuloides bryosalmonae Ecology in Southwest Montana, Paul Helfrich

    PDF

    THE EFFECTS OF FLOOD IRRIGATION VS. PIVOT IRRIGATION ON GROUNDWATER RECHARGE, Tea Rainey

    PDF

    The Magma, 1934, Associated Students of the Montana College of Mineral Science and Technology

    PDF

    Tips for Avoiding Contract Cheating, Dawn Atkinson

    PDF

    United Congregational Church (Crayon Academy Preschool), Environmental Resource Management (ERM)

    PDF

    UNRAVELING THE IMPACT OF VESSEL GEOMETRY IN RESONANT ACOUSTIC MIXING, Jefferson Guthrie

    PDF

    Validation of a Methodology for Predicting Yield Acceleration of Rock Blocks, Madison Haydn-Myer

    PDF

    Work-Related Musculoskeletal Problems: A Look at How Employers View Causes, Roger C. Jensen

 
 
 

Search

Advanced Search

  • Notify me via email or RSS

Links

  • Author FAQ
  • Copyright
  • Policies
  • Submit Research

Browse

  • Collections
  • Disciplines
  • Authors
 
Elsevier - Digital Commons

Home | About | FAQ | My Account | Accessibility Statement

Privacy Copyright