Prepared By:
Atlantic Richfield Company Pioneer Technical Services, Inc.
Document Type
Government Report
Publication Date
Winter 1-31-2025
Subject Area
Butte
Recommended Citation
Bryson, Josh, "Butte Priority Soils Operable Unit (BPSOU) Groundwater Remedy Optimization Subdrain Pump Station Preliminary (30%) Remedial Design Package Submittal" (2025). Silver Bow Creek/Butte Area Superfund Site. 1226.
https://digitalcommons.mtech.edu/superfund_silverbowbutte/1226
Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.
Final Revised_BPSOU Pump Station RDWP.pdf (6550 kB)
Included in
Environmental Health and Protection Commons, Environmental Indicators and Impact Assessment Commons, Environmental Monitoring Commons
Comments
Includes:
• Final Revised Butte Priority Soils Operable Unit (BPSOU) Groundwater Remedy Optimization (GWRO) BPSOU Subdrain Pump Station Remedial Design (RD) Work Plan
o Final Revised Butte Priority Soils Operable Unit (BPSOU) Groundwater Remedy Optimization (GWRO) BPSOU Subdrain Pump Station Pre-Design Investigation (PDI) Work Plan (Attachment 1 to the RD Work Plan)
• Draft Final Butte Priority Soils Operable Unit (BPSOU) Groundwater Remedy Optimization (GWRO) Preliminary (30%) Remedial Design Report for the BPSOU Subdrain Pump Station Upgrades
o Preliminary (30%) Construction Drawings (Appendix A to the Remedial Design Report)