Follow

Submissions from 2025

PDF

Draft Final 2024 Residential Metals Abatement Program (RMAP) Baptist Student Union (former McKinley School) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.

PDF

Draft Final 2024 Residential Metals Abatement Program (RMAP): Walkerville Park (Walkerville Drive & Ryan Road) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.

PDF

Draft Final 2025 Residential Metals Abatement Program (RMAP) Butte KOA Playground Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

PDF

Draft Final 2025 Residential Metals Abatement Program (RMAP): CCCS Gymnasium Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

PDF

Draft Final 2025 Residential Metals Abatement Program (RMAP) Non-Residential Daycare Soil Sampling: Field Sampling Plan (FSP) Submittal #15 [Mini Scholars Discovery Academy, Hands on Learning Childcare, Kidz Konnection, Young Explorers, & University on Princeton], Pioneer Technical Services, Inc.

PDF

Draft Final 2025 Residential Metals Abatement Program (RMAP) Quality Assurance Project Plan (QAPP) Annual Update (Non-Residential Parcels and Residential Daycares), Pioneer Technical Services, Inc.

PDF

Draft Final 2025 Residential Metals Abatement Program (RMAP) Quality Assurance Project Plan (QAPP) Annual Update (Non-Residential Parcels and Residential Daycares), Pioneer Technical Services, Inc.

PDF

Draft Final 2025 Residential Metals Abatement Program (RMAP) Quality Assurance Project Plan (QAPP) Annual Update (Residential Parcels), Pioneer Technical Services, Inc.

PDF

Draft Final 2025 Residential Metals Abatement Program (RMAP) Quality Assurance Project Plan (QAPP) Annual Update (Residential Parcels), Pioneer Technical Services, Inc.

PDF

Draft Final 2025 Residential Metals Abatement Program (RMAP) Rock Creek Cattle Company Borrow Submittal #1, Pioneer Technical Services, Inc.

PDF

Draft Final BPSOU Insufficiently Reclaimed Sites BRES No. 158 - Waste Rock Dump Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

PDF

Draft Final BPSOU Insufficiently Reclaimed Sites Josephine Shaft (IR-37) Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

PDF

Draft Final BPSOU Unreclaimed Sites UR-05 Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

PDF

Draft Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc.

PDF

Draft Final Butte Priority Soils Operable Unit (BPSOU) Insufficiently Reclaimed Sites Remedial Action Work Plan (RAWP): BRES No. 104 (Colorado Dump) North Slope, Pioneer Technical Services, Inc.

PDF

Draft Final Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites: UR-03 Site Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

PDF

Draft Final Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites UR-46 Temporary Best Management Practices Work Plan, Pioneer Technical Services, Inc.

PDF

Draft Final Butte Priority Soils Operable Unit (BPSOU) Unreclaimed (UR) Sites New and Mahoney (UR-23) Construction Completion Report (CCR), Pioneer Technical Services, Inc.

PDF

Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – First Quarter 2025, Pioneer Technical Services, Inc.

PDF

Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2024, Pioneer Technical Services, Inc.

PDF

Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2024, Pioneer Technical Services, Inc.

PDF

Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Second Quarter 2025, Pioneer Technical Services, Inc.

PDF

Draft Final Silver Bow Creek Conservation Area Repository Data Gap Data Summary Report (DSR), Pioneer Technical Services, Inc.

PDF

Draft Final - Silver Bow Creek Conservation Area (SBCCA) Butte Reduction Works (BRW) Air Monitoring for Interim Demolition Activities – Phase I Data Summary Report (DSR), Pioneer Technical Services, Inc.

PDF

Draft Final Silver Bow Creek Conservation Area (SBCCA) Construction Quality Assurance Plan (CQAP), Pioneer Technical Services, Inc.

PDF

Final 2025 Residential Metals Abatement Program (RMAP) Butte KOA Playground Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

PDF

Final 2025 Residential Metals Abatement Program (RMAP) CCCS Gymnasium Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

PDF

Final 2025 Residential Metals Abatement Program (RMAP) Quality Assurance Project Plan (QAPP) Annual Update (Non-Residential Parcels and Residential Daycares), Pioneer Technical Services, Inc.

PDF

Final 2025 Residential Metals Abatement Program (RMAP) Quality Assurance Project Plan (QAPP) Annual Update (Residential Parcels), Pioneer Technical Services, Inc.

PDF

Final 2025 Residential Metals Abatement Program (RMAP) Rock Creek Cattle Company Borrow Submittal #1, Pioneer Technical Services, Inc.

PDF

Final Annual Operations and Maintenance (O&M) Report: Butte Treatment Lagoon (BTL) System – 2024, Pioneer Technical Services, Inc.

PDF

Final BPSOU Unreclaimed Sites: UR-05 Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

PDF

Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc.

PDF

Final Butte Mine Waste Repository Geotechnical Investigation Work Plan, Pioneer Technical Services, Inc.

PDF

Final Butte Priority Soils Operable Unit (BPSOU) Insufficiently Reclaimed Sites Remedial Action Work Plan (RAWP): BRES No. 104 (Colorado Dump) North Slope, Pioneer Technical Services, Inc.

PDF

Final Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites: UR-03 Site Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

PDF

Final Butte Priority Soils Operable Unit (BPSOU) Unreclaimed (UR) Sites: UR-35 Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

PDF

Final Horseshoe Bend Effluent Line (HBEL) Discharge Structure Surface Enhancements Work Plan, Pioneer Technical Services, Inc.

PDF

Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.

PDF

Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023, Pioneer Technical Services, Inc.

PDF

Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2024, Pioneer Technical Services, Inc.

PDF

Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023, Pioneer Technical Services, Inc.

PDF

Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Third Quarter 2022, Pioneer Technical Services, Inc.

PDF

Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Third Quarter 2023, Pioneer Technical Services, Inc.

PDF

Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Third Quarter 2024, Pioneer Technical Services, Inc.

PDF

Final Silver Bow Creek Conservation Area (SBCCA) Butte Reduction Works (BRW) Air Monitoring for Interim Demolition Activities – Phase I Data Summary Report (DSR), Pioneer Technical Services, Inc.

PDF

Final Unreclaimed Sites Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.

PDF

RE: Draft Final 2023 Residential Metals Abatement Program (RMAP) Butte-Silver Bow Parks Soil Remedial Action Construction Completion Report (CCR), Pioneer Technical Services, Inc.

PDF

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: BRES No. 158 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

PDF

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: BRES No. 30 – Atlantic-1 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

PDF

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: BRES No. 32 – Corra 2 Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.

PDF

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: BRES No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc.

PDF

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: BRES No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc.

PDF

Revised Draft Final 2022 Insufficiently Reclaimed Sites Sampling: BRES No. 38 – Sister Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.

PDF

Revised Draft Final 2022 Unreclaimed Sites Sampling: UR-13 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

PDF

Revised Draft Final 2022 Unreclaimed Sites Sampling: UR-20 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

PDF

Revised Draft Final Annual Operations and Maintenance (O&M) Report: Butte Treatment Lagoon (BTL) System – 2023, Pioneer Technical Services, Inc.

PDF

Revised Draft Final BPSOU Unreclaimed Sites: UR-05 Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

PDF

Revised Draft Final Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites: UR-03 Site Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

PDF

Revised Draft Final Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites: UR-08 (Anderson Shaft) Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

PDF

Revised Draft Final Butte Treatment Lagoons (BTL) Groundwater Treatment System Routine Operations, Maintenance, and Monitoring (OM&M) Plan, Pioneer Technical Services, Inc.

PDF

Revised Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – First Quarter 2024, Pioneer Technical Services, Inc.

PDF

Revised Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Second Quarter 2024, Pioneer Technical Services, Inc.

PDF

Approval Letter for Final BPSOU Insufficiently Reclaimed Sites Belle of Butte (BRES No. 8 & UR-39) Remedial Action Work Plan (RAWP) Request for Change IR-2024-RA-01, Revision 1 (dated December 13, 2024), Molly Roby

PDF

Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Unreclaimed Sites (UR-35) Remedial Action Work Plan (RAWP) (dated June 14, 2024), Molly Roby

PDF

Comment letter for the Butte Priority Soils Operable Unit (BPSOU) 2025 Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (dated February 14, 2025), Molly Roby

PDF

Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Butte Reclamation Evaluation System (BRES) Draft 2024 Field Evaluation Summary and Technical Recommendations Report (dated November 15, 2024), Molly Roby

PDF

Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites UR-03 Remedial Action Work Plan (RAWP) (dated January 27, 2025)., Molly Roby

PDF

Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final 2022 Unreclaimed Sites Sampling: UR-28 Site Evaluation Summary Report (dated April 23, 2025), Molly Roby

PDF

Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final 2025 Residential Metals Abatement Program (RMAP) Rock Creek Cattle Company Borrow Submittal #1 (dated May 23, 2025), Molly Roby

PDF

Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final BRES No. 35 Del Monte Reclamation Improvement Sites Field Sampling (FSP) (dated August 14, 2025), Molly Roby

PDF

Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites Field Sampling (FSP): BRES No.177 - North Alice Culvert (dated August 21, 2025), Molly Roby

PDF

Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (FSP): BRES No. 100 – Capri Motel-Arctic Dump (dated August 12, 2025), Molly Roby

PDF

Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (FSP): BRES No. 18 – Walkerville Ballfield (dated August 13, 2025), Molly Roby

PDF

Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (FSP): BRES No. 26 – Cripple Dump (dated August 21, 2025), Molly Roby

PDF

Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites Remedial Action Work Plan (RAWP): BRES No. 104 – (Colorado Dump) North Slope (dated October 17, 2025), Molly Roby

PDF

Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Residential Metals Abatement Program Investigation Summary Report (Non‐Residential Parcels – Indoor Dust) – CCCS Gym Annex (dated October 4, 2024), Molly Roby

PDF

Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Final Insufficiently Reclaimed Sites Field Sampling Plan (FSP): UR- 19 – Butte, Anaconda & Pacific Railway from Montana Street to South Arizona Avenue – Montana Street Adjacent Parcel (dated August 13, 2025), Molly Roby

PDF

Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Final Multi-Pathway Residential Metals Abatement Program (RMAP) Plan (dated March 27, 2025), Molly Roby

PDF

Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Insufficiently Reclaimed Sites Sampling: BRES No. 84 Site Evaluation Summary Report (dated April 11, 2025), Molly Roby

PDF

Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Revised Draft Final Insufficiently Reclaimed Sites BRES No. 158 Site Evaluation Summary Report (dated February 24, 2025), Molly Roby

PDF

Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (FSP): BRES No. 120 – Bonanza Dump (dated August 12, 2025), Molly Roby

PDF

Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Revised Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (dated May 27, 2025), Molly Roby

PDF

Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Revised Draft Final Reclamation Improvement Sites Field Sampling and Investigation Plan (FSP): BRES No. 45 – Garfield Response to Agency comments (dated August 14, 2025), Molly Roby

PDF

Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Revised Draft Final Unreclaimed Sites (UR-05) Remedial Action Work Plan (RAWP) (dated June 10, 2025), Molly Roby

PDF

Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Revised Final Multi- Pathway Residential Metals Abatement Program (RMAP) Plan (dated January 13, 2025), Molly Roby

PDF

Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Revised Insufficiently Reclaimed Sites BRES No. 158 – Waste Rock Dump Remedial Action Work Plan (RAWP) (dated June 24, 2025), Molly Roby

PDF

Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites UR-46 Temporary Best Management Practices Work Plan (dated October 17, 2025), Molly Roby

PDF

Re: Approval letter for the Response to Comment Letter and the Butte Priority Soils Operable Unit (BPSOU) Draft 2024 Butte Reclamation Evaluation System (BRES) Corrective Action Plans for Reclaimed Sites (both dated June 6, 2025), Molly Roby

PDF

Re: Approval letter with comment for the Butte Priority Soils Operable Unit (BPSOU) 2025 Revised Draft Final Unreclaimed Sites: UR-03 Site Remedial Action Work Plan (RAWP) (dated June 2, 2025), Molly Roby

PDF

Re: Approval of the Butte Priority Soils Operable Unit (BPSOU) Butte Reclamation Evaluation System (BRES) Revised Draft 2024 Field Evaluation Summary and Technical Recommendations Report (dated June 4, 2025), Molly Roby

PDF

Re: Comment Letter for 2024 Annual Operations and Maintenance Report Butte Reclamation Evaluation System (BRES) Annual Summary Report for Work Completed in Quadrant 4 (dated May 1, 2025), Molly Roby

PDF

Re: Comment Letter for BPSOU Uncontrolled Surface Flow Areas Drainage C 30% Design RAWP (dated June 23, 2025), Molly Roby

PDF

Re: Comment Letter for Draft Final BPSOU Unreclaimed Site Anderson Shaft Remedial Action Work Plan (RAWP) (dated June 14, 2024), Molly Roby

PDF

Re: Comment Letter for Draft Final Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites UR-05 Remedial Action Work Plan (RAWP) (dated March 14, 2025), Molly Roby

PDF

Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) 2022 Draft Final Insufficiently Reclaimed Sites Sampling BRES No. 30 – Atlantic 1 Site Evaluation Summary Report (dated February 24, 2025), Molly Roby

PDF

Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) 2022 Draft Final Insufficiently Reclaimed Sites Sampling: BRES No. 32 Site Evaluation Summary Report (dated December 11, 2024), Molly Roby

PDF

Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) 2022 Draft Final Insufficiently Reclaimed Sites Sampling: BRES No. 37 – Josephine Shaft Site Evaluation Summary Report (December 6, 2024), Molly Roby

PDF

Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) 2022 Draft Final Insufficiently Reclaimed Sites Sampling: BRES No. 38 – Sister Dump Site Evaluation Summary Report (December 31, 2024), Molly Roby

PDF

Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) 2024 Draft Final Backfill and Cover Material Quality Assurance Project Plan (dated September 27, 2024), Molly Roby