Follow

Submissions from 2024

PDF

RE: Butte Priority Soils Operable Unit (BPSOU) 2024 Final Unreclaimed Sites Quality Assurance Project Plan (QAPP), Mike McAnulty

PDF

Re: Butte Priority Soils Operable Unit (BPSOU) Final Insufficiently Reclaimed Sites Field Sampling Plan (FSP) BRES No. 121 – Travona Dump., Mike McAnulty

PDF

Re: Butte Priority Soils Operable Unit (BPSOU) Final Insufficiently Reclaimed Sites Field Sampling Plan (FSP) BRES No. 125 – Child Harold-2 Dump., Mike McAnulty

PDF

Re: Butte Priority Soils Operable Unit (BPSOU) Final Insufficiently Reclaimed Sites Field Sampling Plan (FSP) BRES No. 49 – Old Glory., Mike McAnulty

PDF

Re: Butte Priority Soils Operable Unit (BPSOU) Final Insufficiently Reclaimed Sites Field Sampling Plan (FSP) BRES No. 74 – West Gagnon Dump., Mike McAnulty

PDF

Re: Butte Priority Soils Operable Unit (BPSOU) Final Unreclaimed Sites Field Sampling Plan (FSP) Package #10: UR-44, UR-45, UR-46, UR-47, and UR-48, Mike McAnulty

PDF

Re: Butte Priority Soils Operable Unit (BPSOU) Final Unreclaimed Sites Field Sampling Plan (FSP) Package #11: UR-49 and UR-50, Mike McAnulty

PDF

RE: Butte Priority Soils Operable Unit (BPSOU) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plans (FSPs) and Responses to Agency Comments, Mike McAnulty

PDF

RE: Butte Priority Soils Operable Unit (BPSOU) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plans (FSPs) and Responses to Agency Comments, Mike McAnulty

PDF

RE: Butte Priority Soils Operable Unit (BPSOU) Revised Draft Final Insufficiently Reclaimed Sites Field Sampling Plans (FSPs) and Responses to Agency Comments, Mike McAnulty

PDF

Request for Change (RFC-RMAP-2024-002), Mike McAnulty

PDF

Final Executed Request for Change (RFC-RMAP-2024-002), Mike McAnulty and Eric Hassler

2024 Draft Blacktail Creek Remediation and Contaminated Groundwater Hydraulic Control Site Pre-Design Investigation Work Plan, Pioneer Technical Services, Inc.

PDF

2024 Draft Final Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Phase III Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.

PDF

2024 Draft Final Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (QAPP) for Microbial Analysis and Biotreatability Study, Pioneer Technical Services, Inc.

PDF

2024 Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.

PDF

2024 Draft Final Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.

PDF

2024 Draft Final Unreclaimed Sites Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.

PDF

Berkeley Pit and Discharge Pilot Project Downstream Field Sampling Plan 2024 Update, Revision 1, Pioneer Technical Services, Inc.

PDF

BMFOU Berkeley Pit Waterfowl Protection Program - Request For Change, Pioneer Technical Services, Inc.

PDF

Butte Priority Soils Operable Unit (BPSOU) Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022., Pioneer Technical Services, Inc.

PDF

Butte Reduction Works Interim Demolition Plan Phase II Encroachment Analysis, Pioneer Technical Services, Inc.

PDF

Draft Final 2021-2022 Residential Metals Abatement Program (RMAP) Aware Early Head Start Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.

PDF

Draft Final 2021 Residential Metals Abatement Program (RMAP) Head Start (former Lincoln School) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.

PDF

Draft Final 2022 Insufficiently Reclaimed Sites Sampling: BRES No. 158 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

PDF

Draft Final 2022 Insufficiently Reclaimed Sites Sampling BRES No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc.

PDF

Draft Final 2022 Unreclaimed Sites Sampling UR-13 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

PDF

Draft Final 2023 BPSOU Subdrain Data Summary Report (DSR), Pioneer Technical Services, Inc.

PDF

Draft Final 2023 Residential Metals Abatement Program (RMAP) Whitehall Borrow Submittal #2, Pioneer Technical Services, Inc.

PDF

Draft Final 2024 Butte Priority Soils Operable Unit (BPSOU) Borrow Amendment Submittal #1, Pioneer Technical Services, Inc.

PDF

Draft Final 2024 Butte Priority Soils Operable Unit Helehan Borrow Submittal #2, Pioneer Technical Services, Inc.

PDF

Draft Final 2024 Butte Priority Soils Operable Unit Type B Borrow Material Submittal #2, Pioneer Technical Services, Inc.

PDF

Draft Final 2024 Residential Metals Abatement Program (RMAP) Brown’s Gulch Borrow Submittal #1, Pioneer Technical Services, Inc.

PDF

Draft Final 2024 Residential Metals Abatement Program (RMAP) Quality Assurance Project Plan (QAPP) Annual Update (Non-Residential Parcels and Residential Daycares), Pioneer Technical Services, Inc.

PDF

Draft Final Annual Operations and Maintenance (O&M) Report: Butte Treatment Lagoon (BTL) System – 2023, Pioneer Technical Services, Inc.

PDF

Draft Final BPSOU Backfill and Cover Material Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.

PDF

Draft Final BPSOU Insufficiently Reclaimed Sites Belle of Butte (BRES No. 8 & UR-39) Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

PDF

Draft Final BPSOU Unreclaimed Sites Anderson Shaft Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

PDF

Draft Final Butte Treatment Lagoons (BTL) Groundwater Treatment System Routine Operations, Maintenance, and Monitoring (OM&M) Plan, Pioneer Technical Services, Inc.

PDF

Draft Final Horseshoe Bend Effluent Line (HBEL) Discharge Structure Surface Enhancements Work Plan, Pioneer Technical Services, Inc.

PDF

Draft Final Materials Management Plan Silver Bow Creek Conservation Area, Pioneer Technical Services, Inc.

PDF

Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – First Quarter 2024, Pioneer Technical Services, Inc.

PDF

Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023, Pioneer Technical Services, Inc.

PDF

Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Second Quarter 2024, Pioneer Technical Services, Inc.

PDF

Draft Final Revised 2024 Residential Metals Abatement Program (RMAP) Walkerville Park (Alley of North Main and Alley of West Daly) Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

PDF

Draft Final Revised Residential Metals Abatement Program (RMAP) Quality Assurance Project Plan (QAPP) (Residential Parcels), Pioneer Technical Services, Inc.

PDF

Draft Final Revised Residential Metals Abatement Program (RMAP) Quality Assurance Project Plan (QAPP) (Residential Parcels), Pioneer Technical Services, Inc.

PDF

Final 2022 Insufficiently Reclaimed Sites Sampling BRES No. 08 – Belle of Butte Site Evaluation Summary Report, Pioneer Technical Services, Inc.

PDF

Final 2023 Butte Priority Soils Operable Unit Type B Borrow Material Submittal #1, Pioneer Technical Services, Inc.

PDF

Final 2024 Butte Priority Soils Operable Unit Helehan Borrow Submittal #2, Pioneer Technical Services, Inc.

PDF

Final 2024 Butte Priority Soils Operable Unit Type B Borrow Material Submittal #2, Pioneer Technical Services, Inc.

PDF

Final 2024 Residential Metals Abatement Program (RMAP) Baptist Student Union (former McKinley School) Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

PDF

Final 2024 Residential Metals Abatement Program (RMAP) Brown’s Gulch Borrow Submittal #1, Pioneer Technical Services, Inc.

PDF

Final 2024 Residential Metals Abatement Program (RMAP) Park Soil Sampling Field Sampling Plan (FSP) Submittal #14 [Silver Bow Homes Park, Butte KOA, Fairmont RV Park, and CCCS Gymnasium], Pioneer Technical Services, Inc.

PDF

Final 2024 Residential Metals Abatement Program (RMAP) Quality Assurance Project Plan (QAPP) Annual Update (Non-Residential Parcels and Residential Daycares), Pioneer Technical Services, Inc.

PDF

Final 2024 Residential Metals Abatement Program (RMAP) Walkerville Park (Alley of North Main and Alley of West Daly) Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

PDF

Final 2024 Residential Metals Abatement Program (RMAP) Whitehall Borrow Submittal #2, Pioneer Technical Services, Inc.

PDF

Final 2024 Residential Metals Abatement Program (RMAP) Whitehall Borrow Submittal #2, Pioneer Technical Services, Inc.

PDF

Final Blacktail Creek Remediation and Contaminated Groundwater Hydraulic Control Site Pumping Test Data Summary Report (DSR), Pioneer Technical Services, Inc.

PDF

Final BPSOU Insufficiently Reclaimed Sites Belle of Butte (BRES No. 8 & UR-39) Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

PDF

Final Butte Priority Soils Operable Unit (BPSOU) Unreclaimed (UR) Sites: UR-35 Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

PDF

Final Butte Priority Soils Operable Unit Repository Screening Report, Pioneer Technical Services, Inc.

PDF

Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.

PDF

Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – First Quarter 2022, Pioneer Technical Services, Inc.

PDF

Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – First Quarter 2023, Pioneer Technical Services, Inc.

PDF

Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022, Pioneer Technical Services, Inc.

PDF

Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Second Quarter 2022, Pioneer Technical Services, Inc.

PDF

FINAL REPOSITORY SCREENING REPORT, Pioneer Technical Services, Inc.

PDF

Final Residential Metals Abatement Program (RMAP) Quality Assurance Project Plan (QAPP) (Residential Parcels), Pioneer Technical Services, Inc.

PDF

Final West Side Soils Operable Unit Remedial Investigation Sampling Data Summary Report, Pioneer Technical Services, Inc.

PDF

Revised Draft Final 2024 Residential Metals Abatement Program (RMAP) Quality Assurance Project Plan (QAPP) Annual Update (Non-Residential Parcels and Residential Daycares), Pioneer Technical Services, Inc.

PDF

Revised Draft Final BPSOU Insufficiently Reclaimed Sites Belle of Butte (BRES No. 8 & UR-39) Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

PDF

Revised Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022, Pioneer Technical Services, Inc.

PDF

Revised Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023, Pioneer Technical Services, Inc.

PDF

Revised Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Third Quarter 2023, Pioneer Technical Services, Inc.

PDF

Butte Reduction Works (BRW) Phase II Interim Demolition Plan Construction Drawings and Floodplain Encroachment Analysis, Pioneer Technical Services, Inc. and Josh Bryson

PDF

Berkeley Pit and Discharge Pilot Project Discharge System Operations Assurance Plan 2024 Update, Revision 1, Pioneer Technical Services, Inc. and WSP Environment & Infrastructure, Inc.

PDF

Approval of: Berkeley Pit and Discharge Pilot Project, Discharge System Operations and Maintenance Manual, 2024 Update , dated April 23, 2024, Jason Rappe

PDF

Approval of: Discharge System 2023 Annual Operations and Maintenance Report, Berkeley Pit and Discharge Pilot Project, dated May 20, 2024, Jason Rappe

PDF

Approval of: Draft Final 2023 Annual Report, Operations & Maintenance Monitoring Report for the Rocker Timber Framing and Treating Plant Operable Unit; dated April 10, 2024., Jason Rappe

PDF

EPA Remedial Project Manager Change, Berkeley Pit/Mine Flooding Operable Unit (BMFOU) of the Silver Bow Creek/Butte Area and Consent Decree for the Mine Flooding Site, CV 02-35-BU-RFC, Jason Rappe

PDF

EPA Remedial Project Manager Change, Rocker Operable Unit of the Silver Bow Creek/Butte Are, Civil Action No 89-39-BU-PGH, Jason Rappe

PDF

RE: EPA Remedial Project Manager Change, Berkeley Pit/Mine Flooding Operable Unit (BMFOU) of the Silver Bow Creek/Butte Area and Consent Decree for the Mine Flooding Site, CV 02-35-BU-RFC, Jason Rappe

PDF

Approval letter for the Butte Priority Soils Operable Unit (BPSOU) 2024 Draft Final Insufficiently Reclaimed Areas Quality Assurance Project Plan (QAPP) (dated March 8, 2024), Molly Roby

PDF

Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final 2024 Residential Metals Abatement Program (RMAP) Brown’s Gulch Borrow Submittal #1 (dated July 22, 2024), Molly Roby

PDF

Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Uncontrolled Surface Flow Areas Remedial Design (RD) Work Plan, Draft BPSOU Uncontrolled Surface Flow Areas Pre-Design Investigation (PDI) Work Plan, 2023 Uncontrolled Surface Flow Area Soil Characterization Quality Assurance Project Plan (QAPP) [dated January 25, 2024], Molly Roby

PDF

Approval letter for the Butte Priority Soils Operable Unit (BPSOU), Draft Residential Metals Abatement Program Construction Completion Report (Non‐Residential Parcels – Indoor Dust) –East Middle School (dated March 29, 2024), Molly Roby

PDF

Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Request for Change (RFC-RMAP-2024-002) for the Soil Remedial Action at Mandan Park (dated September 19, 2024), Molly Roby

PDF

Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Residential Metals Abatement Program (RMAP) Revised 2024 Walkerville Park (Alley of North Main & Alley of West Daly) Soil Remedial Action Work Plan (RAWP) (dated September 18, 2024), Molly Roby

PDF

Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Residential Metals Abatement Program (RMAP) Revised Yard Submittals Round 2 (dated August 30, 2024), Molly Roby

PDF

Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Revised Draft Final Insufficiently Reclaimed Sites Belle of Butte (BRES No. 8 & UR-39) Remedial Action Work Plan (RAWP) (dated September 27, 2024), Molly Roby

PDF

Comment/Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites Field Sampling Plans (FSPs) for BRES No. 121 – Travona Dump, BRES No. 125 – Child Harold-2 Dump, BRES No. 34E – Eveline Dump East, BRES No. 45 – Garfield, BRES No. 49 – Old Glory, BRES No. 52 – Moscow, BRES No. 74 – West Gagnon Dump, and BRES No. 78 Original Mine (dated May 7, 2024), Molly Roby

PDF

Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites Belle of Butte (BRES No. 8 & UR-39) Remedial Action Work Plan (RAWP), Molly Roby

PDF

Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites Field Sampling Plan (FSP) for BRES No. 181 – Mountain Con-3 Dump, Molly Roby

PDF

Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Reclaimed Areas Weed Management Plan (dated April 11, 2024), Molly Roby

PDF

Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Residential Metals Abatement Program (RMAP) Yard Submittals Round 2 (dated July 25, 2024), Molly Roby

PDF

Comments for the 2024 Butte Priority Soils (BPSOU) Residential Metals Abatement Program (RMAP) – Quality Assurance Project Plan (QAPP) for Non-Residential Parcels and Residential Daycares (dated May 23, 2024), Molly Roby

PDF

Comments for the Butte Priority Soils (BPSOU) Residential Metals Abatement Program (RMAP) – Interior School Dust – Investigation Summary Report – Gold Hill Lutheran (dated February 5, 2024), Molly Roby

PDF

Conditional approval letter for the 2024 Butte Priority Soils (BPSOU) Residential Metals Abatement Program (RMAP) – Quality Assurance Project Plan (QAPP) Annual Update (Non-Residential Parcels and Residential Daycares) (dated July 1, 2024), Molly Roby

PDF

Re: Approval for the Response to Comments Letter (dated May 21, 2024) for the Butte Priority Soils Operable Unit (BPSOU) Butte Reclamation Evaluation System (BRES) Draft 2023 BRES Field Evaluation Summary Report and Technical Recommendations Proposal (dated November 15, 2023) and 2023 Corrective Action Plans (CAPs) for Reclaimed Sites (dated January 31, 2024), Molly Roby