Follow
Submissions from 2025
PDF
Re: Comment Letter for Butte Priority Soils Operable Unit (BPSOU) Draft 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (QAPP) (dated November 18, 2025), Emma Rott
PDF
Re: Comment Letter for Butte Priority Soils Operable Unit (BPSOU) Draft Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (QAPP) (dated November 24, 2025), Emma Rott
PDF
Re: Comment Letter for Butte Priority Soils Operable Unit (BPSOU), Draft Preliminary (30%) Remedial Design Report, Blacktail Creek Riparian Actions (dated July 28, 2025), Emma Rott
PDF
Re: Comment Letter for Butte Priority Soils Operable Unit (BPSOU) Notice of Intent to Abandon BPS07-05A and BPS07-05B (dated July 14, 2025), Emma Rott
PDF
Re: Comment Letter for Butte Priority Soils Operable Unit (BPSOU) Principles for a Greener Cleanup Report (dated December 23, 2024), Emma Rott
PDF
Re: Comment Letter for Butte Priority Soils Operable Unit (BPSOU) Superfund Operation and Maintenance (O&M) Request for Maintenance – Kelley Stormwater Channels (dated April 22, 2025), Emma Rott
PDF
Re: Comment Letter for Butte Priority Soils Operable Unit Draft Final Leak Infiltration Evaluation (dated July 24, 2025), Emma Rott
PDF
Re: Comment Letter for Butte Priority Soils Operable Unit Subdrain Pump Station 30% Remedial Design Package Submittal (dated January 31, 2025), Emma Rott
PDF
Re: Comment Letter for Clark Tailings Consolidated Waste Management Area (CTCWMA) Site Investigation Quality Assurance Project Plan Revision 01 (dated June 6, 2025), Emma Rott
PDF
Re: Comment Letter for Diggings East 95 % Remedial Design Package Submittal (dated August 29, 2025), the Silver Bow Creek Conservation Area (SBCCA) – 95 Percent Programmatic Technical Specifications Submittal (dated August 19, 2025), the Draft Final SBCCA Construction Quality Assurance Plan (dated August 20, 2025) and the Butte Priority Soils SBCCA Operations and Maintenance (O&M) Plan (dated August 14, 2025), Emma Rott
PDF
Re: Comment Letter for Draft Blacktail Creek Groundwater Hydraulic Control System Preliminary 30% Remedial Design Report (dated October 28, 2024), Emma Rott
PDF
Re: Comment Letter for the 2022 Butte Priority Soils Operable Unit (BPSOU) Groundwater Compliance Evaluation (dated March 10, 2025), Emma Rott
PDF
Re: Comment Letter for the 2023 Butte Priority Soils Operable Unit (BPSOU) Groundwater Compliance Evaluation (dated March 10, 2025), Emma Rott
PDF
Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Butte Treatment Lagoons (BTL) Groundwater Treatment System Quarterly Operation and Maintenance Report – Quarter 2 2025 (dated September 30, 2025), Emma Rott
PDF
Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Butte Treatment Lagoons (BTL) Groundwater Treatment System Routine Operations, Maintenance, and Monitoring (OM&M) Plan (dated December 10, 2024), Emma Rott
PDF
Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Materials Management Plan (dated November 21, 2024), Emma Rott
PDF
Re: Comment letter for the Draft Final Silver Bow Creek Conservation Area Repository Data Gap Data Summary Report (dated January 3, 2025), Emma Rott
PDF
Re: Comment letter for the Final Butte Reduction Works (BRW) Smelter Area Waste Remediation and Contaminated Groundwater Hydraulic Control Site Air Monitoring Quality Assurance Project Plan (QAPP) for Interim Demolition Activities (dated May 19, 2025), Emma Rott
PDF
Re: Comments on the Draft Final Butte Mine Waste Repository Geotechnical Investigation Work Plan (dated September 23, 2025), Emma Rott
PDF
Re: Comments on the Repository, Haul Route, and Pipeline Geotechnical Pre-Design Investigation Summary Report (dated December 30, 2024), Emma Rott
PDF
Re: Comments on the Repository, Haul Route, and Pipeline Geotechnical Pre-Design Investigation Summary Report (dated May 13, 2025), Emma Rott
PDF
Re: Conditional Approval Letter for Butte Priority Soils (BPSOU) Draft Blacktail Creek Riparian Actions Remedial Design Work Plan (dated May 1, 2025, received July 28, 2025), Emma Rott
PDF
Re: Conditional approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoons (BTL) System – Third Quarter 2024 (dated December 23, 2024), Emma Rott
PDF
Re: Conditional Approval Letter for the Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan Revision 0 (2025 Update) and Response to EPA Comments. (dated September 16, 2025), Emma Rott
PDF
Re: Conditional Approval Letter for the Final Butte Mine Waste Repository Geotechnical Investigation Work Plan (dated November 14, 2025), Emma Rott
PDF
Re: Condition Approval Letter for BPSOU Draft Final Phase I Design Investigation Evaluation Report, Blacktail Creek Riparian Actions (dated May 2, 2025, received July 28, 2025), Emma Rott
PDF
Re: Letter response to Butte Priority Soils Operable Unit (BPSOU) Continued Use of the Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area NPL Site (dated September 15, 2025), Emma Rott
PDF
Re: Letter response to Butte Priority Soils Operable Unit (BPSOU) Continued Use of the Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area NPL Site (dated September 15, 2025), Emma Rott
PDF
Technical Memorandum - RE: 2022 Butte Priority Soils Operable Unit (BPSOU) Groundwater Compliance Evaluation, Paddy Stoy
PDF
Technical Memorandum - RE: 2022 Butte Priority Soils Operable Unit (BPSOU) Groundwater Compliance Evaluation, Paddy Stoy
PDF
TECHNICAL MEMORANDUM - RE: 2022 Butte Priority Soils Operable Unit (BPSOU) Groundwater Compliance Evaluation, Paddy Stoy
PDF
Technical Memorandum - RE: 2023 Butte Priority Soils Operable Unit (BPSOU) Groundwater Compliance Evaluation, Paddy Stoy
PDF
February 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson and Loren Burmeister
PDF
February 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson and Loren Burmeister
PDF
Re: 2025 Spring Migration Seasonal Report for Berkeley Pit Waterfowl Protection Plan, Mark Thompson and Loren Burmeister
PDF
Re: August 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson and Loren Burmeister
PDF
Re: December 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson and Loren Burmeister
PDF
Re: January 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson and Loren Burmeister
PDF
Re: July 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson and Loren Burmeister
PDF
Re: June 2025 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson and Loren Burmeister
PDF
Re: Pilot Project 2025 Annual Update, Mark Thompson and Loren Burmeister
PDF
Butte Mine Flooding Operable Unit Berkeley Pit and Discharge Pilot Project – January 2025 Monthly Discharge Monitoring Report, Mark Thompson and Dave Griffis
PDF
DISCHARGE SYSTEM FIELD SAMPLING PLAN, 2025 UPDATE SILVER BOW CREEK/BUTTE AREA NPL SITE BUTTE MINE FLOODING OPERABLE UNIT | BUTTE, MONTANA, Mark Thompson and Dave Griffis
PDF
Re: Butte Mine Flooding Operable Unit Berkeley Pit and Discharge Pilot Project – August 2025 Monthly Discharge Monitoring Report, Mark Thompson and Dave Griffis
PDF
Re: Butte Mine Flooding Operable Unit Berkeley Pit and Discharge Pilot Project – December 2024 Monthly Discharge Monitoring Report, Mark Thompson and Dave Griffis
PDF
Re: Butte Mine Flooding Operable Unit Berkeley Pit and Discharge Pilot Project – July 2025 Monthly Discharge Monitoring Report, Mark Thompson and Dave Griffis
PDF
Re: Butte Mine Flooding Operable Unit Berkeley Pit and Discharge Pilot Project – June 2025 Monthly Discharge Monitoring Report, Mark Thompson and Dave Griffis
PDF
Re: Butte Mine Flooding Operable Unit Berkeley Pit and Discharge Pilot Project – May 2025 Monthly Discharge Monitoring Report, Mark Thompson and Dave Griffis
PDF
Re: BUTTE MINE FLOODING SITE CD, CV 02-35 Bu-RFC, 2024 Fourth Quarter Report, Mark Thompson and Dave Griffis
PDF
Re: BUTTE MINE FLOODING SITE CD, CV 02-35 Bu-RFC, 2025 Second Quarter Report, Mark Thompson and Dave Griffis
PDF
Settling Defendants BMFOU Annual Report Consent Decree for the Butte Mine Flooding Site CD, CV 02-35 Bu-RFC Remedial Action – Implementation of the Remedy Horseshoe Bend Water Treatment Plant 2024 Annual Report, Mark Thompson and Dave Griffis
PDF
On-Site Water Management Field Sampling Plan (FSP), 2025 Update, Mark Thompson and Rampart Solutions
PDF
Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (QAPP) Revision 0, Woodard & Curran
PDF
Butte Priority Soils Operable Unit Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (QAPP) Revision 0, Woodard & Curran
PDF
Clark Tailings Consolidated Waste Management Area (CTCWMA) Site Investigation Draft Data Summary Report 2019 Surface Water, Groundwater Seep, and Soil Characterization 2021-2023 Surface Water and Groundwater Seep Evaluation 2023 Waterloo APS Soil and Groundwater Evaluation, Woodard & Curran
PDF
Clark Tailings Consolidated Waste Management Area (CTCWMA) Site Investigation Draft Data Summary Report 2024 Surface Water, Groundwater, and Soil Characterization, Woodard & Curran
PDF
Clark Tailings Consolidated Waste Management Area (CTCWMA) Site Investigation Final Data Summary Report 2019 Surface Water, Groundwater Seep, and Soil Characterization 2021-2023 Surface Water and Groundwater Seep Evaluation 2023 Waterloo APS Soil and Groundwater Evaluation, Woodard & Curran
PDF
DRAFT 2025 Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Woodard & Curran
PDF
DRAFT 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran
PDF
DRAFT 2026 Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Woodard & Curran
Submissions from 2024
PDF
PILOT PROJECT QUALITY ASSURANCE PROJECT PLAN 2024 UPDATE, Alloy Group
PDF
Butte Priority Soils Operable Unit (BPSOU) Draft Final Unreclaimed Sites Field Sampling Plan (FSP) Package #11: UR-49 and UR-50, Atlantic Richfield Company
PDF
TECHNICAL SPECIFICATIONS - Silver Bow Creek Conservation Area - 60% SUBMITTAL April 2024, Atlantic Richfield Company
PDF
REVISED FINAL MULTI-PATHWAY RESIDENTIAL METALS ABATEMENT PROGRAM PLAN, Atlantic Richfield Company and Butte Silver Bow
PDF
Residential Metals Abatement Program – Interior School Dust – Investigation Summary Report – After the Bell Child Care Center, Thomas J. Beckman, Christopher Berg, and Environmental Resource Management (ERM)
PDF
Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Butte Career Center / Webster Garfield, Christopher Berg and Thomas J. Beckman
PDF
Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) East Middle School, Christopher Berg and Thomas J. Beckman
PDF
Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Kennedy Elementary, Christopher Berg and Thomas J. Beckman
PDF
Residential Metals Abatement Program Construction Completion Report Butte Career Center / Webster Garield, Christopher Berg, Thomas J. Beckman, and Environmental Resource Management (ERM)
PDF
Residential Metals Abatement Program Construction Completion Report Kennedy Elementary, Christopher Berg, Thomas J. Beckman, and Environmental Resource Management (ERM)
PDF
Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Silver Bow Montessori, Christopher Berg, Thomas J. Beckman, and Environmental Resource Management (ERM)
PDF
Residential Metals Abatement Program Investigation Summary Report Kennedy Elementary School Post- Remedial Action Surface Dust Sampling, Christopher Berg and Elsie King
PDF
Approved Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan Request for Change to Install Additional Test Pits and Perform Material Characterization, Josh Bryson
PDF
Attachment A Demonstration of Need for Butte Priority Soils Operable Unit (BPSOU) Temporary Construction Surface Water Performance Standards Variance Request for Grove Gulch Sedimentation Bay Remedial Action Site, Josh Bryson
PDF
Berkeley Pit Geochemical and Limnological Evaluation Pre-Design Investigation (PDI) Work Plan, Josh Bryson
PDF
Berkely Pit Repository Cost Comparison, Josh Bryson
PDF
Butte Priority Soils Operable Unit Diggings East 60% Remedial Design Package Submittal, Josh Bryson
PDF
Butte Priority Soils Operable Unit Grove Gulch Sedimentation Bay 100% Remedial Design, Josh Bryson
PDF
Butte Priority Soils Operable Unit SBCCA Principles for a Greener Cleanup Report, Josh Bryson
PDF
Butte Reduction Works (BRW) Phase II Interim Demolition Plan Construction Drawings and Floodplain Encroachment Analysis, Josh Bryson
PDF
Butte Reduction Works (BRW) Phase III Quality Assurance Project Plan (QAPP) Request for Change BRW-2024-01, Josh Bryson
PDF
RE: Approved Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan Request for Change to Install Additional Test Pits and Perform Material Characterization, Josh Bryson
PDF
RE: Butte Reduction Works (BRW) Phase III Quality Assurance Project Plan (QAPP) Request for Change BRW-2024-01, Josh Bryson
PDF
RE: Silver Bow Creek Butte Area NPL Site 2nd Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. CV 89-039-BU-SHE, Josh Bryson
PDF
RE: Silver Bow Creek Butte Area NPL Site 3rd Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. CV 89- 039-BU-SHE, Josh Bryson
PDF
RE: Silver Bow Creek Butte Area NPL Site 4th Quarter 2023 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. CV 89- 039-BU-SHE, Josh Bryson
PDF
RE: Silver Bow Creek Butte Area NPL Site Fall Semi-Annual 2023 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent DecreeCivil Action No. CV 89-039-BU-SHE, Josh Bryson
PDF
RE: Silver Bow Creek Butte Area NPL Site Spring Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. CV 89-039-BU-SHE, Josh Bryson
PDF
RE: Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (QAPP), Josh Bryson
PDF
RE: Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (QAPP), Josh Bryson
PDF
Silver Bow Creek Butte Area NPL Site 3rd Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. CV 89- 039-BU-SHE, Josh Bryson
PDF
Silver Bow Creek Butte Area NPL Site 4th Quarter 2023 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. CV 89-039-BU-SHE, Josh Bryson
PDF
Silver Bow Creek/Butte Area NPL Site Butte Priority Soils Operable Unit, Remedial Design Documents for the Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson
PDF
Silver Bow Creek/Butte Area NPL Site Butte Priority Soils Operable Unit, Remedial Design Documents for the Blacktail Creek Area Groundwater Hydraulic Control System, Josh Bryson
PDF
Silver Bow Creek Butte Area NPL Site Fall Semi-Annual 2023 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. CV 89-039-BU-SHE, Josh Bryson
PDF
Silver Bow Creek Butte Area NPL Site Spring Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. CV 89-039-BU-SHE, Josh Bryson
PDF
Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan Request for Change to Install Additional Test Pits and Perform Material Characterization, Josh Bryson
PDF
Silver Bow Creek Conservation Area (SBCCA) 60% Technical Specifications Submittal, Josh Bryson
PDF
TECHNICAL MEMORANDUM Grove Gulch Earth Volumetric Studio Model Inputs, Josh Bryson
PDF
Pilot Project 2024 Annual Update, Loren Burmeister and Mark Thompson