Prepared By:

Pioneer Technical Services, Inc.

Document Type

Government Report

Publication Date

Summer 8-31-2026

Subject Area

Butte

Abstract

The purpose of this Butte Priority Soils Operable Unit (BPSOU) Unreclaimed (UR) Sites Construction Completion Report (CCR) is to describe the tasks completed as described in the Final BPSOU UR Sites: UR-35 Remedial Action Work Plan (RAWP) (referred to herein as RAWP; Atlantic Richfield Company, 2025) (Appendix A). This CCR was prepared to outline Remedial Action (RA) tasks performed at the UR source area, UR-35, within the BPSOU (referred to herein as UR-35 Site or Site) as part of the Further Remedial Elements Scope of Work described in the BPSOU Consent Decree (EPA, 2020). All work was completed according to Occupational Safety and Health Administration and Atlantic Richfield Company (Atlantic Richfield) safety requirements. This work was completed in a single phase with individual tasks scheduled to prevent workflow conflicts.

Creative Commons License

Creative Commons Attribution 4.0 International License
This work is licensed under a Creative Commons Attribution 4.0 International License.

Share

COinS