Draft Final 2023 Residential Metals Abatement Program (RMAP) Walkerville Park (Alley of North Main and Alley of West Daly) Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Draft Final 2023 Residential Metals Abatement Program (RMAP) Walkerville Park (Walkerville Drive and Ryan Road) Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Draft Final 2023 Residential Metals Abatement Program (RMAP) Whitehall Borrow Submittal, Pioneer Technical Services, Inc.
Draft Final 2023 Residential Metals Abatement Program (RMAP) Whitehall Borrow Submittal, Pioneer Technical Services, Inc.
Draft Final 2023 Residential Metals Abatement Program (RMAP) Whitehall Borrow Submittal, Pioneer Technical Services, Inc.
Draft Final 2023 RMAP Baptist Student Union (former McKinley School) Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Draft Final Annual Operations and Maintenance (O&M) Report Butte Treatment Lagoon (BTL) System – 2022, Pioneer Technical Services, Inc.
Draft Final BPSOU Unreclaimed Sites UR-06 Temporary Best Management Practice Work Plan, Pioneer Technical Services, Inc.
Draft Final Butte Priority Soils Operable Unit (BPSOU) Insufficiently Reclaimed (IR) Sites Colorado Dump – West Lot Construction Completion Report (CCR), Pioneer Technical Services, Inc.
Draft Final Butte Priority Soils Operable Unit (BPSOU) Unreclaimed (UR) Sites UR-35 Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Draft Final Butte Treatment Lagoons (BTL) Groundwater Treatment System Routine Operations, Maintenance, and Monitoring (OM&M) Plan, Pioneer Technical Services, Inc.
Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – First Quarter 2023, Pioneer Technical Services, Inc.
Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022, Pioneer Technical Services, Inc.
Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023, Pioneer Technical Services, Inc.
Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023, Pioneer Technical Services, Inc.
Draft Final Revised Residential Metals Abatement Program (RMAP) Quality Assurance Project Plan (QAPP) (Residential Parcels), Pioneer Technical Services, Inc.
Final 2021 Insufficiently Reclaimed Sites Sampling BRES No. 104 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2021 Insufficiently Reclaimed Sites Sampling BRES No. 154 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2021 Unreclaimed Sites Sampling UR-01 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2021 Unreclaimed Sites Sampling UR-03 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2021 Unreclaimed Sites Sampling UR-05 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2021 Unreclaimed Sites Sampling UR-24 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2021 Unreclaimed Sites Sampling UR-30 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2021 Unreclaimed Sites Sampling UR-32 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2021 Unreclaimed Sites Sampling UR-33 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2021 Unreclaimed Sites Sampling UR-34 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2021 Unreclaimed Sites Sampling UR-35 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2021 Unreclaimed Sites Sampling UR-36 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2021 Unreclaimed Sites Sampling UR-38 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2021 Unreclaimed Sites Sampling UR-40 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2023 Butte Priority Soils Operable Unit (BPSOU) Borrow Amendment Work Plan, Pioneer Technical Services, Inc.
Final 2023 Butte Priority Soils Operable Unit Helehan Borrow Submittal #1, Pioneer Technical Services, Inc.
Final 2023 Residential Metals Abatement Program (RMAP) BRW/Belgrade Borrow Submittal, Pioneer Technical Services, Inc.
Final 2023 Residential Metals Abatement Program (RMAP) Clark Park Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Final 2023 Residential Metals Abatement Program (RMAP) Copper/Emmett Park Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Final 2023 Residential Metals Abatement Program (RMAP) Gold Hill Lutheran Church (containing the Creativity Factory Preschool) Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Final 2023 Residential Metals Abatement Program (RMAP) Park Soil Sampling Field Sampling Plan (FSP) Submittal #11 [Montana Technological University (North Campus)], Pioneer Technical Services, Inc.
Final 2023 Residential Metals Abatement Program (RMAP) Park Soil Sampling Field Sampling Plan (FSP) Submittal #11 (Version 2) [Montana Technological University (North Campus)], Pioneer Technical Services, Inc.
Final 2023 Residential Metals Abatement Program (RMAP) Park Soil Sampling Field Sampling Plan (FSP) Submittal #12 [Aldersgate United Methodist Church], Pioneer Technical Services, Inc.
Final 2023 Residential Metals Abatement Program (RMAP) Park Soil Sampling Field Sampling Plan (FSP) Submittal #8 [Ramsay Skating Rink, Skyline Park, Butte Vigilante Saddle Club, Butte Country Club, Fairmont Hot Springs, Silver Bow Homes Park, Gloria Dei Lutheran Church, and United Congregational Church], Pioneer Technical Services, Inc.
Final 2023 Residential Metals Abatement Program (RMAP) Peoples Park Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Final 2023 Residential Metals Abatement Program (RMAP) Quality Assurance Project Plan (QAPP) Annual Update (Non-Residential Parcels), Pioneer Technical Services, Inc.
Final 2023 Residential Metals Abatement Program (RMAP) Racetrack Borrow Submittal, Pioneer Technical Services, Inc.
Final 2023 Residential Metals Abatement Program (RMAP) Rocker Park Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Final 2023 Residential Metals Abatement Program (RMAP) Stodden Park Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Final 2023 Residential Metals Abatement Program (RMAP) Stodden Park Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Final 2023 Residential Metals Abatement Program (RMAP) Walkerville Park (Walkerville Drive and Ryan Road) Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Final 2023 Residential Metals Abatement Program (RMAP) Whitehall Borrow Submittal, Pioneer Technical Services, Inc.
Final 2023 Residential Metals Abatement Program (RMAP) Whitehall Borrow Submittal, Pioneer Technical Services, Inc.
Final 2023 RMAP Stodden Park Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (BPSOU) 2021 Unreclaimed Sites Sampling – UR-03 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (BPSOU) 2021 Unreclaimed Sites Sampling – UR-05 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (BPSOU) 2021 Unreclaimed Sites Sampling – UR-09 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (BPSOU) 2021 Unreclaimed Sites Sampling – UR-24 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (BPSOU) 2021 Unreclaimed Sites Sampling – UR-30 Site Evaluation Summary Report., Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (BPSOU) 2021 Unreclaimed Sites Sampling – UR-32 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (BPSOU) 2021 Unreclaimed Sites Sampling – UR-33 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (BPSOU) 2021 Unreclaimed Sites Sampling – UR-34 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (BPSOU) 2021 Unreclaimed Sites Sampling – UR-35 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (BPSOU) 2021 Unreclaimed Sites Sampling – UR-38 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (BPSOU) 2021 Unreclaimed Sites Sampling – UR-39 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (BPSOU) 2021 Unreclaimed Sites Sampling – UR-39 Site Evaluation Summary Report., Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (BPSOU) 2021 Unreclaimed Sites Sampling – UR-40 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (BPSOU) Insufficiently Reclaimed (IR) Sites Colorado Dump – West Lot Construction Completion Report (CCR), Pioneer Technical Services, Inc.
Final RMAP Park Soil Sampling Field Sampling Plan (FSP) Submittal #7 [Covering Gold Hill Lutheran Church, Peoples Park, Sioux Park, Charlie Judd Park, Emma Park, Mandan Park, and Walkerville Park (Daly and Dunn)], Pioneer Technical Services, Inc.
Final RMAP Park Soil Sampling Field Sampling Plan (FSP) Submittal #9 [Covering Centerville Skating Rink, Belmont Senior Citizens Center, High Altitude Skating Rink, Missoula Gulch Ballfield Play Area, MAC Facilities, Butte Family YMCA, Church of Christ, and Montana Tech South Campus], Pioneer Technical Services, Inc.
Final Third Cycle Best Management Practices (BMPs) New and Mahoney Work Plan, Pioneer Technical Services, Inc.
Residential Metals Abatement Program – Interior School Dust – Investigation Summary Report – Emerson Elementary, Pioneer Technical Services, Inc.
Revised Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – First Quarter 2022, Pioneer Technical Services, Inc.
Revised Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2021, Pioneer Technical Services, Inc.
Revised Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Second Quarter 2022, Pioneer Technical Services, Inc.
Revised Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Third Quarter 2022, Pioneer Technical Services, Inc.
Revised Draft Final West Side Soils Operable Unit Remedial Investigation Sampling Data Summary Report, Pioneer Technical Services, Inc.
2022 Q4 BPSOU SW, Pioneer Technical Services, Inc.; Atlantic Richfield Company; and Environmental Protection Agency
2023 Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (QAPP), Woodard & Curran
2023 Final Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (QAPP), Woodard & Curran
Butte Priority Soils Operable Unit Uncontrolled Surface Flow Areas Draft Remedial Design Work Plan (RDWP), Woodard & Curran
Draft Final BPSOU 2023 Uncontrolled Surface Flow Area Soil Characterization Quality Assurance Project Plan (QAPP), Woodard & Curran
Draft Uncontrolled Surface Flow Areas Pre-Design Investigation Work Plan, Woodard & Curran
Submissions from 2022
Atlantic Richfield Response to Agency Comments on the Draft Butte Priority Soils Operable Unit (BPSOU) 2021 Groundwater Monitoring Data Summary Report, January 2021 – December 2021; dated April 8, 2022, Atlantic Richfield Company
Atlantic Richfield Response to Comments BPSOU Draft Final Data Management Plan, Atlantic Richfield Company
Butte Priority Soils Operable Unit (BPSOU) 2022 Data Management Plan (Dated April 2022), Atlantic Richfield Company
Butte Priority Soils Operable Unit (BPSOU) Silver Bow Creek/Butte Area NPL Site, Atlantic Richfield Company
Butte Priority Soils Operable Unit (BPSOU) Silver Bow Creek/Butte Area NPL Site, Atlantic Richfield Company
Copy of Revision Summary, Atlantic Richfield Company
Draft Final Revised Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Pre-Design Investigation (PDI) Evaluation Report, Atlantic Richfield Company and Josh Bryson
Attachments to Reports Generated April 2022, Atlantic Richfield Company; Environmental Protection Agency; and TREC Inc., A Woodard and Curran Company
SILVER BOW CREEK/BUTTE AREA NPL SITE BUTTE PRIORITY SOILS OPERABLE UNIT, Atlantic Richfield Company and Pioneer Technical Services, Inc.
Copy of Revision Summary - SBC/Butte Area NPL Site Final BPSOU Interim Site-Wide Surface Water Monitoring QAPP 2020 and 2021 Monitoring Period, 10/14/20, Atlantic Richfield Company and TREC Inc., A Woodard and Curran Company
Butte Priority Soils Operable Unit (BPSOU) 2022 Final Data Management Plan (Dated February 2022), Josh Bryson
Butte Priority Soils Operable Unit (BPSOU) 2022 Final Data Management Plan (Dated February 2022), Josh Bryson
SILVER BOW CREEK/BUTTE AREA NPL SITE BUTTE PRIORITY SOILS OPERABLE UNIT, Josh Bryson