Follow
Submissions from 2021
PDF
EPA REGION 8 QA DOCUMENT REVIEW CROSSWALK, Nikia Greene
PDF
EPA REGION 8 QA DOCUMENT REVIEW CROSSWALK - of 26, Nikia Greene
File
SBC/Butte Area NPL Site Final BPSOU Interim Site-Wide Surface Water Monitoring QAPP 2020 and 2021 Monitoring Period, 10/14/20, Nikia Greene
File
SBC/Butte Area NPL Site Final BPSOU Interim Site-Wide Surface Water Monitoring QAPP 2020 and 2021 Monitoring Period, 10/14/20, Nikia Greene
File
Silver Bow Creek/Butte Area NPL Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (QAPP), 11/16/21, Nikia Greene
File
Silver Bow Creek/Butte Area NPL Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (QAPP), 11/16/21, Nikia Greene
PDF
BPSOU Draft Final Residential Metals Abatement Program (RMAP) QAPP (Non-Residential Parcels) (7/7/2021), Nikia Greene, Atlantic Richfield Company, and Butte Silver Bow
PDF
EPA REGION 8 QA DOCUMENT REVIEW CROSSWALK, Nikia Greene and Pioneer Technical Services, Inc.
PDF
2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Nikia Greene and TREC Inc., A Woodard and Curran Company
PDF
Butte Priority Soils Operable Unit (BPSOU) Approved Quarterly Operations and Maintenance Report Butte Treatment Lagoons System – Third Quarter 2020, Dave Griffis
PDF
Butte Priority Soils Operable Unit (BPSOU) Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – First Quarter 2021., Dave Griffis
PDF
Butte Priority Soils Operable Unit (BPSOU) Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Third Quarter 2021, Dave Griffis
PDF
Draft Residential Metals Abatement Program Quality Assurance Project Plan (Non-Residential Parcels - Indoor Dust), Elsie King, Christopher Berg, and Thomas J. Beckman
PDF
Approved Final Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites Field Sampling Plan (FSP) Package #6: UR‐05, UR‐27, UR‐28, UR‐29, UR‐30, and UR‐34, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) 2021- Unreclaimed Areas Quality Assurance Project Plan (QAPP), Request for Change (RFC)-01, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites - Field Sampling and Investigation Plan (FSP) BRES No. 8 – Belle of Butte, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (FSP) BRES No. 16 - Curry, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Final Insufficiently Reclaimed Sites – Field Sampling and Investigation Plan (FSP) BRES No. 154 – Clark Mill Tailings NE, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Insufficiently Reclaimed Sites - Field Sampling and Investigation Plan (FSP) BRES No. 104 - Colorado Dump, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Insufficiently Reclaimed Sites - Field Sampling and Investigation Plan (FSP) BRES No. 104 - Colorado Dump – Final, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Insufficiently Reclaimed Sites - Field Sampling and Investigation Plan (FSP) BRES No. 104 - Colorado Dump – Final, Revision 1, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Insufficiently Reclaimed Sites - Field Sampling Plan (FSP) BRES No. 154 – Clark Mill Tailings NE., Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Revised Insufficiently Reclaimed Sites - Field Sampling and Investigation Plan (FSP) BRES No. 104 - Colorado Dump and Response to Comments, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Solid Media Management Program Plan, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites - Draft Final Field Sampling Plan (FSP) #2; Unreclaimed Sites UR-24, UR-26, and UR-40. Butte Priority Soils Operable Unit (BPSOU), Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites - Draft Final Field Sampling Plan (FSP) #3 ; UR-06, UR-07, UR-20, UR-22, UR-35, and UR-36., Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites -Draft Final Field Sampling Plan (FSP) #4: UR-16 and UR-21, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites -Draft Final Field Sampling Plan (FSP) #4: UR-16 and UR-21, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites -Draft Final Field Sampling Plan (FSP) #4: UR-16 and UR-21, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites - Draft Final Field Sampling Plan (FSP) #5: UR-12, UR-13, UR-33, and UR-38., Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites - Draft Final Field Sampling Plan (FSP) #5: UR-12, UR-13, UR-33, and UR-38., Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites - Draft Final Field Sampling Plan (FSP) #5: UR-12, UR-13, UR-33, and UR-38., Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites - Draft Final Field Sampling Plan (FSP) #5: UR-12, UR-13, UR-33, and UR-38., Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites - Draft Final Field Sampling Plan (FSP) Package #1; UR-23, UR-31, UR-32, and UR-39, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites Draft Final Field Sampling Plan (FSP) Package #6: UR-05, UR-27, UR-28, UR-29, UR-30, and UR-34, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites Draft Final Field Sampling Plan (FSP) Package #6: UR-05, UR-27, UR-28, UR-29, UR-30, and UR-34, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites Draft Final Field Sampling Plan (FSP) Package #6: UR-05, UR-27, UR-28, UR-29, UR-30, and UR-34., Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites Draft Final Field Sampling Plan (FSP) Package #7: UR-01, UR-02, UR-03, UR-04, UR-15, and UR-17, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites Draft Final Field Sampling Plan (FSP) Package #7: UR-01, UR-02, UR-03, UR-04, UR-15, and UR-17, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites Draft Final Field Sampling Plan (FSP) Package #7: UR-01, UR-02, UR-03, UR-04, UR-15, and UR-17, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites Draft Final Field Sampling Plan (FSP) Package #7: UR-01, UR-02, UR-03, UR-04, UR-15, and UR-17, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites – Final Field Sampling Plan (FSP) #2; Unreclaimed Sites UR-24, UR-26, and UR-40., Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites – Final Field Sampling Plan (FSP) #2; Unreclaimed Sites UR-24, UR-26, and UR-40., Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites Final Field Sampling Plan (FSP) #2: Unreclaimed Sites UR-24, UR-26, and UR-40, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites - Final Field Sampling Plan (FSP) #3: UR-06, UR-07, UR-20, UR-22, UR-35, and UR-36, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites - Final Field Sampling Plan (FSP) #3: UR-06, UR-07, UR-20, UR-22, UR-35, and UR-36., Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites – Final Field Sampling Plan (FSP) #3: UR-06, UR-07, UR-20, UR-22, UR-35, and UR-36, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites - Final Field Sampling Plan (FSP) Package #1; UR-23, UR-31, UR-32, and UR-39, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites Final Field Sampling Plan (FSP) Package #6: UR-05, UR-27, UR-28, UR-29, UR-30, and UR-34, Mike McAnulty
PDF
Draft Final RMAP Aware Early Head Start Soil Remedial Action Work Plan (RAWP), Mike McAnulty
PDF
Draft Final RMAP QAPP (Non-Residential RMAP Parcels) Addendum #1, Mike McAnulty
PDF
Draft Final RMAP School Sampling Field Sampling Plan (FSP) Submittal #1, Mike McAnulty
PDF
Final BPSOU Unreclaimed Sites – Draft Final Field Sampling Plan (FSP) Package #1; UR-23, UR-31, UR-32, and UR-39., Mike McAnulty
PDF
Final RMAP QAPP (Non-Residential RMAP Parcels), Mike McAnulty
PDF
Residential Metals Abatement Program Quality Assurance Project Plan (Non-Residential Parcels – Indoor Dust), Mike McAnulty
PDF
Response to Comments for 2020 BPSOU UAO submittal: Revised Final Multi-Pathway Residential Metals Abatement Program Plan (received January 21, 2021), Mike McAnulty
PDF
Response to comments to the Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites Draft Final Field Sampling Plan (FSP) Package #6: UR-05, UR-27, UR-28, UR-29, UR-30, and UR-34, Mike McAnulty
PDF
Response to Comments to the Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites Draft Final Field Sampling Plan (FSP) Package #7: UR-01, UR-12, UR-03, UR-04, UR-15, and UR-17, Mike McAnulty
PDF
Response to Comments to the Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites Draft Final Field Sampling Plan (FSP) Package #7: UR-01, UR-12, UR-03, UR-04, UR-15, and UR-17, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) 2021 Final Reclaimed Areas Maintenance and Monitoring Quality Assurance Project Plan (QAPP) – 2021, Mike McAnulty and Eric Hassler
PDF
Butte Priority Soils Operable Unit (BPSOU) Approved 2021-2-22 Final Reclaimed Areas Maintenance and Monitoring Quality Assurance Project Plan (QAPP), Mike McAnulty and Eric Hassler
PDF
Butte Priority Soils Operable Unit (BPSOU) Final Reclaimed Areas Maintenance and Monitoring (M&M) Plan and Butte Reclamation Evaluation System (BRES) Field Manual, Mike McAnulty and Eric Hassler
PDF
Butte Priority Soils Operable Unit (BPSOU) Final Reclaimed Areas Maintenance and Monitoring (M&M) Plan and Butte Reclamation Evaluation System (BRES) Field Manual, Mike McAnulty and Eric Hassler
PDF
Butte-Silver Bow Medical Monitoring Program Plan, Mike McAnulty and Eric Hassler
PDF
Butte Silver Bow Snow Management Plan, Mike McAnulty and Eric Hassler
PDF
Analytical Data Package, Pace Analytical Services
PDF
Analytical Data Package, Pace Analytical Services
File
10568969 EDD, Pioneer Technical Services, Inc.
File
10568969_EDD, Pioneer Technical Services, Inc.
File
10577063 EDD, Pioneer Technical Services, Inc.
File
10577069 EDD, Pioneer Technical Services, Inc.
File
10578172 EDD, Pioneer Technical Services, Inc.
File
10578889 EDD, Pioneer Technical Services, Inc.
File
10578891 EDD, Pioneer Technical Services, Inc.
File
10586986 EDD, Pioneer Technical Services, Inc.
File
10586986 EDD, Pioneer Technical Services, Inc.
File
10587273 EDD, Pioneer Technical Services, Inc.
PDF
2021 BTL O&M Events Log, Pioneer Technical Services, Inc.
File
2021 BTL O&M Events Log, Pioneer Technical Services, Inc.
PDF
2021 BTL O&M Events Log, Pioneer Technical Services, Inc.
PDF
2021 Final Butte Reduction Works (BRW) Phase I Quality Assurance Project Plan (QAPP) Revision 3. February 2021, Pioneer Technical Services, Inc.
PDF
2021 Final Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Phase III Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
File
2021 Second Quarter Laboratory EDD's, Pioneer Technical Services, Inc.
PDF
Anticipated Remedial Design Schedule for Butte Reduction Works, Pioneer Technical Services, Inc.
File
Attachment D to the DSR; Work Order 10577874, 10584152 EDD, Pioneer Technical Services, Inc.
PDF
Butte Priority Soils Operable Unit Preliminary (30%) Design Butte Reduction Works Smelter Area Remedial Action Construction Drawings, Pioneer Technical Services, Inc.
PDF
Butte Reclamation Evaluation System Field Manual, Pioneer Technical Services, Inc.
PDF
Butte Treatment Lagoons Daily PTS Field Dump, Pioneer Technical Services, Inc.
PDF
Butte Treatment Lagoon System, Pioneer Technical Services, Inc.
PDF
Butte Treatment Lagoon System, Pioneer Technical Services, Inc.
PDF
Draft Final Solid Media Management Program Plan, Pioneer Technical Services, Inc.
PDF
Final 2021 Residential Metals Abatement Program (RMAP) School Soil Sampling Field Sampling Plan (FSP) Submittal #1 (Covering Ramsay Elementary School), Pioneer Technical Services, Inc.
PDF
Final 2021 Residential Metals Abatement Program (RMAP) School Soil Sampling Field Sampling Plan (FSP) Submittal #2 (Covering Highland View Christian School, Hillcrest Elementary, Kennedy Elementary, Silver Bow Montessori, & West Elementary), Pioneer Technical Services, Inc.
PDF
Final 2021 Residential Metals Abatement Program (RMAP) School Soil Sampling Field Sampling Plan (FSP) Submittal #3 [Covering Emerson Elementary, Headstart (former Lincoln School), Headstart (former Monroe School), & Margaret Leary Elementary], Pioneer Technical Services, Inc.
PDF
Final 2021 Residential Metals Abatement Program (RMAP) School Soil Sampling Field Sampling Plan (FSP) Submittal #4 [Covering Butte Central Elementary & Middle School, Butte Central High School, Butte High School/Annex, East Middle School, Jeremy Bullock Soccer Fields, Webster Garfield School, & Whittier Elementary], Pioneer Technical Services, Inc.
PDF
Final 2021 Residential Metals Abatement Program (RMAP) School Soil Sampling Field Sampling Plan (FSP) Submittal #5 [Covering McGlone Heights and Skating Rink], Pioneer Technical Services, Inc.
PDF
Final 2021 Residential Metals Abatement Program (RMAP) School Soil Sampling Field Sampling Plan (FSP) Submittal #6 [Covering Small World Daycare], Pioneer Technical Services, Inc.
PDF
Final 2021 Residential Metals Abatement Program (RMAP) School Soil Sampling Field Sampling Plan (FSP) Submittal #7 [Covering Former Hawthorne School and Aware Early Headstart], Pioneer Technical Services, Inc.
PDF
Final 2021 Residential Metals Abatement Program (RMAP) West Elementary School Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
PDF
Revised Draft Final Butte Reclaimed Areas Maintenance and Monitoring (M&M) Plan in Accordance with Butte Reclamation Evaluation System (BRES), Pioneer Technical Services, Inc.