Submissions from 2026

PDF

Re: Conditional approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Unreclaimed Sites: UR-46 Site Evaluation Summary Report (SESR), Molly Roby

PDF

Re: Conditional Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Revised Butte Hill Revegetation Specifications (dated August 15, 2025), Molly Roby

PDF

Re: Conditional Approval letter for the Butte Priority Soils Operable Unit Draft Final 2022 Insufficiently Reclaimed Sites Sampling: BRES No. 50 – Zelia Site Evaluation Summary Report, Molly Roby

PDF

Re: Conditional approval letter for the Butte Priority Soils Operable Unit Insufficiently Reclaimed Sites Quality Assurance Project Plan, Molly Roby

PDF

Re: Conditional Approval letter for the Draft Final 2024 Unreclaimed Sites Sampling: UR-21 Site Evaluation Summary Report, Molly Roby

PDF

Re: Conditional Approval letter for the Draft Final Butte Priority Soils Operable Unit (BPSOU) Insufficiently Reclaimed Sites Sister Dump (BRES No. 38) Remedial Action Work Plan (RAWP), Molly Roby

PDF

Re: Conditional approval letter with comments for the Draft Final 2026 Residential Metals Abatement Program (RMAP) Anselmo Mine Yard Development Plan (dated February 25, 2026), Molly Roby

PDF

RFC - REQUEST FOR INFORMATION - Waste Rock Dump Stormwater Runoff Collection System Substitution, Molly Roby

PDF

Re: Approval Letter for Draft Final Silver Bow Creek Conservation Area (SBCCA) Butte Reduction Works (BRW) Air Monitoring for Interim Demolition Activities – Phase II Data Summary Report (DSR) (dated June 26, 2026), Emma Rott

PDF

Re: Approval letter for the 2022 Butte Priority Soils Operable Unit (BPSOU) Stormwater Evaluation and Maintenance Report (dated April 8, 2026), Emma Rott

PDF

Re: Approval letter for the 2023 Butte Priority Soils Operable Unit (BPSOU) Stormwater Evaluation and Maintenance Report (dated April 8, 2026), Emma Rott

PDF

Re: Approval letter for the 2024 Butte Priority Soils Operable Unit (BPSOU) Stormwater Evaluation and Maintenance Report (dated April 8, 2026), Emma Rott

PDF

Re: Approval Letter for the Butte Priority Soils Operable Unit (BPSOU) Clark Tailings Consolidated Waste Management Area (CTCWMA) Site Investigation Quality Assurance Project Plan (QAPP) (dated August 14, 2026), Emma Rott

PDF

Re: Approval Letter for the Butte Priority Soils Operable Unit (BPSOU) Clark Tailings Consolidated Waste Management Area (CTCWMA) Site Investigation Quality Assurance Project Plan (QAPP) Revision 0 (2026) Request for Change (RFC)-2026-001 (dated September 8, 2026), Emma Rott

PDF

Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Quarterly Operation and Maintenance Report: Butte Treatment Lagoons (BTL) System– Fourth Quarter 2025 (dated March 30, 2026), Emma Rott

PDF

Re: Approval Letter for the Butte Priority Soils Operable Unit (BPSOU) Final 2026 Interim Site- Wide Surface Water Monitoring Quality Assurance Project Plan (QAPP) (dated August 28, 2026), Emma Rott

PDF

Re: Approval letter for the Butte Priority Soils Operably Unit (BPSOU) Revised Draft Final Quarterly Operations and Maintenance Report: Butte Treatment Lagoon System (BTL) Second Quarter 2025 (dated April 10, 2026), Emma Rott

PDF

Re: Approval letter for the Diggings East 100% Remedial Design Package Submittal (dated July 23, 2026), the 100% SBCCA Programmatic Technical Specifications Submittal (Technical Specifications) (dated May 29, 2026), the Final Revised Silver Bow Creek Conservation Area (SBCCA) Construction Quality Assurance Plan (CQAP) (dated July 29, 2026), the Final SBCCA Construction Monitoring Quality Assurance Project Plan (QAPP) (dated July 29, 2026), and the Final SBCCA Materials Management Plan (MMP) (dated July 29, 2026), Emma Rott

PDF

Re: Approval Letter for the Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (dated August 28, 2026), Emma Rott

PDF

Re: Approval letter for the Final Repository Siting Study (RSS) Detailed Evaluation and Recommendations Report (dated February 11, 2026), Emma Rott

PDF

Re: Approval Letter for the Quarterly Operations and Maintenance Report Grove Gulch Sedimentation Bay for First Quarter 2026 Silver Bow Creek/Bute Area NPL Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE (Dated May 15, 2026)., Emma Rott

PDF

Re: Approval Letter for the Quarterly Operations and Maintenance Report Grove Gulch Sedimentation Bay for Fourth Quarter 2025 Silver Bow Creek/Bute Area NPL Site – Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE (Dated May 15, 2026)., Emma Rott

PDF

Re: Comment Letter for BPSOU Blacktail Creek Riparian Actions Uniform Federal Policy Quality Assurance Project Plan Addendum (dated April 24, 2026), Emma Rott

PDF

Re: Comment Letter for Butte Priority Soils Operable Unit (BPSOU) 2025 Surface Water Compliance Evaluation Technical Memorandum (dated June 29, 2026), Emma Rott

PDF

Re: Comment Letter for Butte Priority Soils Operable Unit (BPSOU) Butte Reduction Works Smelter Area Intermediate 60% Remedial Design Submittal (dated May 19, 2026), Emma Rott

PDF

Re: Comment Letter for Butte Priority Soils Operable Unit (BPSOU) Draft 2025 Groundwater Monitoring Data Summary Report January – December 2025 (dated May 29, 2026), Emma Rott

PDF

Re: Comment Letter for Butte Priority Soils Operable Unit (BPSOU) Draft 2025 Site-Wide Surface Water Monitoring Data Summary Report (dated May 29, 2026), Emma Rott

PDF

Re: Comment Letter for Butte Priority Soils Operable Unit (BPSOU) Draft Diggings East Dewatering Treatability Study Pre-Design Investigation Work Plan (PDIWP) (dated August 24, 2026) and the 2026 Draft Diggings East Dewatering Treatability Study Quality Assurance Project Plan (QAPP) (dated August 24, 2026), Emma Rott

PDF

Re: Comment Letter for Butte Priority Soils Operable Unit (BPSOU), Draft Intermediate (60%) Remedial Design Report, Blacktail Creek Riparian Actions (dated March 13, 2026), Emma Rott

PDF

Re: Comment Letter for Butte Priority Soils Operable Unit Draft Leak Detection Monitoring Plan (dated February 2026), Emma Rott

PDF

Re: Comment Letter for Draft Clark Tailings Consolidated Waste Management Area (CTCWMA) 2024 Data Summary Report (dated October 15, 2025), Emma Rott

PDF

Re: Comment Letter for Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (dated April 17, 2026), Emma Rott

PDF

Re: Comment Letter for Old Butte Silver Bow Landfill/Clark Tailings Consolidated Waste Management Area (CTCWMA) Remedy Effectiveness Evaluation Phase I (Conceptual Site Model) (dated February 27, 2026), Emma Rott

PDF

Re: Comment letter for the 2020 through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Area NPL Site, Butte Priority Soils Operable Unit (BPSOU) Consent Decree-Civil Action No. CV89-039-BU-SHE (dated February 3, 2026), Emma Rott

PDF

Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Draft 2022 Stormwater Evaluation and Maintenance Report (dated February 27, 2026), Emma Rott

PDF

Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Draft 2023 Stormwater Evaluation and Maintenance Report (dated February 27, 2026), Emma Rott

PDF

Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Draft 2024 Stormwater Evaluation and Maintenance Report (dated February 27, 2026), Emma Rott

PDF

Re: Comment letter for the Draft Final Butte Mine Waste Repository Operations and Maintenance (O&M) Plan (dated May 8, 2026), Emma Rott

PDF

Re: Comment letter for the Draft Final Butte Priority Soils Operable Unit (BPSOU) Butte Treatment Lagoons (BTL) Groundwater Treatment System Quarterly Operation and Maintenance Report – Quarter 1 2026 (dated June 26, 2026), Emma Rott

PDF

Re: Comment letter for the Revised Draft Final Butte Priority Soils Operable Unit (BPSOU) Butte Treatment Lagoon (BTL) System Annual Report – 2025 (dated May 11, 2026), Emma Rott

PDF

Re: Comment Letter for the Silver Bow Creek/Butte Area NPL Site Butte Priority Soils Operable Unit, 60% Remedial Design Documents for the Blacktail Creek Area Groundwater Hydraulic Control System (dated March 2, 2026), Emma Rott

PDF

Re: Conditional Approval Letter for Butte Priority Soils Operable Unit (BPSOU) Final Diggings East Dewatering Treatability Study Pre-Design Investigation Work Plan (PDIWP) (dated September 8, 2026) and the 2026 Final Diggings East Dewatering Treatability Study Quality Assurance Project Plan (QAPP) (dated September 8, 2026), Emma Rott

PDF

Re: Conditional Approval Letter for Butte Priority Soils Operable Unit Draft Final Leak Detection Monitoring Plan (dated May 13, 2026), Emma Rott

PDF

Re: Conditional Approval Letter for Diggings East 100% Remedial Design Package Submittal (dated May 29, 2006), Emma Rott

PDF

Re: Conditional Approval Letter for Diggings East 95 % Remedial Design Package Submittal (dated March 25, 2006), the Silver Bow Creek Conservation Area (SBCCA) – 95 Percent Programmatic Technical Specifications Submittal (dated March 25, 2026), the Butte Priority Soils Operable Unit (BPSOU) SBCCA Operations and Maintenance (O&M) Plan (dated March 24, 2026), and the SBCCA Final Principles for a Greener Cleanup Report (dated February 4, 2026), Emma Rott

PDF

Re: Conditional Approval Letter for Draft Final 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (dated May 6, 2026), Emma Rott

PDF

Re: Conditional Approval Letter for Draft Final Silver Bow Creek Conservation Area Materials Management Plan Revision 1 (dated March 24, 2026), Emma Rott

PDF

Re: Conditional Approval Letter for Final Silver Bow Creek Conservation Area (SBCCA) Construction Quality Assurance Plan and Draft Final Silver Bow Creek Conservation Area (SBCCA) Construction Monitoring Quality Assurance Project Plan (dated April 7, 2026), Emma Rott

PDF

Re: Conditional Approval Letter for Revised Clark Tailings Consolidated Waste Management Area (CTCWMA) Site Investigation Data Summary Report 2024 and Response to EPA Comment Letter (dated February 24, 2026), Emma Rott

PDF

Re: Conditional Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Butte Treatment Lagoons (BTL) Groundwater Treatment System Quarterly Operation and Maintenance Report – Quarter 3 2025 (dated December 23, 2025), Emma Rott

PDF

Re: Conditional approval Letter for the Butte Priority Soils Operable Unit (BPSOU) Clark Tailings Consolidated Waste Management Area (CTCWMA) Site Investigation Quality Assurance Project Plan (QAPP) (dated April 16, 2026), Emma Rott

PDF

Re: Conditional approval Letter for the Butte Priority Soils Operable Unit (BPSOU) Clark Tailings Consolidated Waste Management Area (CTCWMA) Site Investigation Quality Assurance Project Plan (QAPP) (dated June 1, 2026), Emma Rott

PDF

Re: Conditional approval letter for the Butte Priority Soils Operable Unit (BPSOU) Silver Bow Creek Conservation Area (SBCCA) Operations and Maintenance (O&M) Plan (dated May 29, 2006), Emma Rott

PDF

Re: Conditional approval letter for the Butte Priority Soils Operable Unit Unreclaimed Sites Quality Assurance Project Plan, Emma Rott

PDF

Re: Conditional approval letter for the Butte Priority Soils Operable Unit Unreclaimed Sites Quality Assurance Project Plan, Emma Rott

PDF

Re: Conditional approval letter for the Draft Final Butte Mine Waste Repository Operations and Maintenance (O&M) Plan (dated August 3, 2026), Emma Rott

PDF

Re: Conditional Approval Letter for the Draft Final Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Pre-Design Investigation (PDI) Evaluation Report (dated September 12, 2025), Emma Rott

PDF

Re: Conditional approval Letter for the Final Revised Silver Bow Creek Conservation Area (SBCCA) Construction Quality Assurance Plan (CQAP) (dated May 28, 2026) and the Final Silver Bow Creek Conservation Area (SBCCA) Construction Monitoring Quality Assurance Project Plan (QAPP) (dated May 28, 2026), Emma Rott

PDF

Re: Conditional approval letter for the Final Silver Bow Creek Conservation Area Materials Management Plan (dated May 28, 2026), Emma Rott

PDF

Re: Conditional Approval Letter with comments for Butte Priority Soils Operable Unit (BPSOU) Draft Final 2026 Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (QAPP) (dated February 4, 2026), Emma Rott

PDF

RE: Response to Comment Letter (dated June 11, 2026) for the Butte Priority Soils Operable Unit (BPSOU) Draft 2025 Butte Reclamation Evaluation System (BRES) Corrective Action Plans for Reclaimed Sites (dated January 30, 2026), Brandon Warner

PDF

BPSOU Grove Gulch Sedimentation Bay Draft Remedial Action Construction Completion Report (CCR), Woodard & Curran

PDF

Clark Tailings Consolidated Waste Management Area (CTCWMA) Site Investigation Draft Data Summary Report 2024 Surface Water, Groundwater, and Soil Characterization, Woodard & Curran

PDF

Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (QAPP), Woodard & Curran

PDF

Clark Tailings Consolidated Waste Management Area Site Investigation Quality Assurance Project Plan (QAPP), Woodard & Curran

PDF

DRAFT FINAL 2026 Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Woodard & Curran

PDF

Silver Bow Creek Conservation Area Approved Final Principles for a Greener Cleanup Report, Woodard & Curran

PDF

Silver Bow Creek Conservation Area Final Principles for a Greener Cleanup Report, Woodard & Curran

Submissions from 2025

PDF

REVISED FINAL MULTI-PATHWAY RESIDENTIAL METALS ABATEMENT PROGRAM PLAN, Atlantic Richfield Company and Butte Silver Bow

PDF

REVISED FINAL MULTI-PATHWAY RESIDENTIAL METALS ABATEMENT PROGRAM PLAN, Atlantic Richfield Company and Butte Silver Bow

PDF

Berkeley Pit and Discharge Pilot Project Quarterly Pilot Project Report Second Quarter 2025, Atlantic Richfield Company and Montana Resources, LLC

PDF

Berkeley Pit and Discharge Pilot Project Quarterly Pilot Project Report Third Quarter 2024, Atlantic Richfield Company and Mark Thompson

PDF

Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - CCCS Gym Annex, Christopher Berg and Thomas J. Beckman

PDF

Butte Priority Soils Operable Unit (BPSOU) 2024 Monthly Progress Report. Consent Decree for the Butte Priority Soils Operable Unit. Civil Action No. CV 89-039-BU-SEH, Josh Bryson

PDF

Butte Priority Soils Operable Unit (BPSOU) 2025 Monthly Progress Report. Consent Decree for the Butte Priority Soils Operable Unit. Civil Action No. CV 89-039-BU-SEH, Josh Bryson

PDF

Butte Priority Soils Operable Unit (BPSOU) 2025 Monthly Progress Report. Consent Decree for the Butte Priority Soils Operable Unit. Civil Action No. CV 89-039-BU-SEH, Josh Bryson

PDF

Butte Priority Soils Operable Unit (BPSOU) 2025 Monthly Progress Report. Consent Decree for the Butte Priority Soils Operable Unit. Civil Action No. CV 89-039-BU-SEH, Josh Bryson

PDF

Butte Priority Soils Operable Unit (BPSOU) 2025 Monthly Progress Report. Consent Decree for the Butte Priority Soils Operable Unit. Civil Action No. CV 89-039-BU-SEH, Josh Bryson

PDF

Butte Priority Soils Operable Unit (BPSOU) Groundwater Remedy Optimization Subdrain Pump Station Preliminary (30%) Remedial Design Package Submittal, Josh Bryson

PDF

Butte Priority Soils Operable Unit (BPSOU) Superfund Operation and Maintenance (O&M) Request for Maintenance – Kelley Stormwater Channels (Dated April 22, 2025), Josh Bryson

PDF

MONTHLY PROGRESS REPORT BUTTE PRIORITY SOILS OPERABLE UNIT CONSENT DECREE PARTIAL REMEDIAL DESIGN/REMEDIAL ACTION AND OPERATION AND MAINTENANCE, Josh Bryson

PDF

RE: 1st Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson

PDF

RE: 2025 Spring Semi-Annual – Interim Site-Wide Groundwater Monitoring Data Report Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson

PDF

RE: 2nd Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson

PDF

RE: 3rd Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson

PDF

RE: BPSOU Superfund Stormwater Operation and Maintenance (O&M) Request for Maintenance – Kelley Stormwater Channels, Josh Bryson

PDF

RE: Butte Priority Soils Operable Unit (BPSOU) 2025 Monthly Progress Report. Consent Decree for the Butte Priority Soils Operable Unit. Civil Action No. CV 89-039-BU-SEH, Josh Bryson

PDF

RE: Butte Priority Soils Operable Unit (BPSOU) Superfund Operation and Maintenance (O&M) Request for Maintenance – Kelley Stormwater Channels (Dated April 22, 2025), Josh Bryson

PDF

RE: Butte Priority Soils Operable Unit Final Leak Infiltration Evaluation, Josh Bryson

PDF

RE: Continued Use of the Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson

PDF

RE: Continued Use of the Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson

PDF

RE: Continued Use of the Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson

PDF

RE: Continued Use of the Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson

PDF

RE: Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report, Josh Bryson

PDF

RE: Silver Bow Creek Butte Area NPL Site 4th Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. CV 89- 039-BU-SHE, Josh Bryson

PDF

RE: Silver Bow Creek Butte Area NPL Site Fall Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. CV 89-039-BU-SHE, Josh Bryson

PDF

Silver Bow Creek Butte Area NPL Site 4th Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. CV 89- 039-BU-SHE, Josh Bryson

PDF

Silver Bow Creek Butte Area NPL Site Fall Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. CV 89-039-BU-SHE, Josh Bryson

PDF

2022 Annual Operations and Maintenance Report, Butte Silver Bow

PDF

2022 Annual Operations and Maintenance Report 2022 BRES Annual Summary Report for Work Completed in Quadrant 2, Butte-Silver Bow Department of Reclamation and Environmental Services