Follow

Submissions from 2026

PDF

Butte Priority Soils Operable Unit (BPSOU) 2025 Monthly Progress Report. Consent Decree for the Butte Priority Soils Operable Unit. Civil Action No. CV 89-039-BU-SEH, Atlantic Richfield Company

PDF

Final Repository Siting Study (RSS) Detailed Evaluation and Recommendations Report, Atlantic Richfield Company and Butte Silver Bow

PDF

2020 through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson

PDF

2020 through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson

PDF

2020 through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson

PDF

2020 through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson

PDF

2020 through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson

PDF

2020 through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson

PDF

2020 through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson

PDF

2020 through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson

PDF

2020 through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson

PDF

2020 through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson

PDF

Butte Priority Soils Operable Unit (BPSOU) 2026 Monthly Progress Report. Consent Decree for the Butte Priority Soils Operable Unit. Civil Action No. CV 89-039-BU-SEH, Josh Bryson

PDF

Butte Priority Soils Operable Unit Diggings East Final 95% Remedial Design Package Submittal, Josh Bryson

PDF

MONTHLY PROGRESS REPORT BUTTE PRIORITY SOILS OPERABLE UNIT CONSENT DECREE PARTIAL REMEDIAL DESIGN/REMEDIAL ACTION AND OPERATION AND MAINTENANCE, Josh Bryson

PDF

MONTHLY PROGRESS REPORT BUTTE PRIORITY SOILS OPERABLE UNIT CONSENT DECREE PARTIAL REMEDIAL DESIGN/REMEDIAL ACTION AND OPERATION AND MAINTENANCE January 2026, Josh Bryson

PDF

Response to Agency Comments Re: Comment Letter for the 2022 Butte Priority Soils Operable Unit (BPSOU) Groundwater Compliance Evaluation (dated March 10, 2025), Josh Bryson

PDF

Response to Agency Comments Re: Comment Letter for the 2023 Butte Priority Soils Operable Unit (BPSOU) Groundwater Compliance Evaluation (dated March 10, 2025) Received May 7, 2025, Josh Bryson

PDF

Response to Agency Comments Re: Comments on the Draft Butte Priority Soils Operable Unit (BPSOU) 2020 Groundwater Compliance and Interpretation Technical Memorandum (dated May 12, 2022, Josh Bryson

PDF

Response to Agency Comments Re: Comments on the Draft Butte Priority Soils Operable Unit (BPSOU) Draft Surface Water Compliance and Interpretation Technical Memorandum (dated May 12, 2022), Josh Bryson

PDF

Silver Bow Creek Conservation Area (SBCCA) – Revised 95% Programmatic Technical Specifications Submittal, Josh Bryson

PDF

2022 BPSOU Stormwater Evaluation and Maintenance Report Annual Stormwater Report for BPSOU Stormwater Structures, Butte-Silver Bow Department of Reclamation and Environmental Services

PDF

2023 BPSOU Stormwater Evaluation and Maintenance Report Annual Stormwater Report for BPSOU Stormwater Structures, Butte-Silver Bow Department of Reclamation and Environmental Services

PDF

2024 Annual Operations and Maintenance Report - 2024 BRES Annual Summary Report for Work Completed in Quadrant 4, Butte-Silver Bow Department of Reclamation and Environmental Services

PDF

2024 BPSOU Stormwater Evaluation and Maintenance Report Annual Stormwater Report for BPSOU Stormwater Structures, Butte-Silver Bow Department of Reclamation and Environmental Services

PDF

Butte Priority Soils Operable Unit (BPSOU) Data Summary Report (DSR) Statement of Authenticity Updates, Mike McAnulty

PDF

Butte Priority Soils Operable Unit (BPSOU) Final Unreclaimed Sites Field Sampling Plan (FSP) Package #7: UR-01, UR-12, UR-03, UR-04, UR-15, and UR-17 Amendment, Mike McAnulty

PDF

Butte Priority Soils Operable Unit Final Butte Hill Revegetation Specifications, Mike McAnulty

PDF

Butte Medical Monitoring Working Group Meeting, Mike McAnulty and Eric Hassler

PDF

Butte Medical Monitoring Working Group Meeting, Mike McAnulty and Eric Hassler

PDF

Draft 2025 Butte Priority Soils Operable Unit Residential Metals Abatement Program Construction Completion Report, Abby Peltomaa

PDF

2026 Revised Draft Final BPSOU Backfill and Cover Material Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.

PDF

Draft Final Butte Priority Soils Operable Unit (BPSOU) Insufficiently Reclaimed Sites BRES No. 30 – Atlantic 1 Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

PDF

Draft Final Butte Priority Soils Operable Unit (BPSOU) Insufficiently Reclaimed Sites Sister Dump (BRES No. 38) Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

PDF

Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: UR-03 Construction Completion Report, Pioneer Technical Services, Inc.

PDF

Draft Final Butte Priority Soils Operable Unit Unreclaimed Sites: UR-03 Construction Completion Report, Pioneer Technical Services, Inc.

PDF

Draft Final Quarterly Operations and Maintenance Report: Butte Treatment Lagoon System – Fourth Quarter 2025, Pioneer Technical Services, Inc.

PDF

Draft Final Silver Bow Creek Conservation Area Materials Management Plan Revision 1, Pioneer Technical Services, Inc.

PDF

Final 2022 Insufficiently Reclaimed Sites Sampling: BRES No. 30 – Atlantic-1 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

PDF

Final 2022 Insufficiently Reclaimed Sites Sampling: BRES No. 32 – Corra 2 Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.

PDF

Final 2022 Insufficiently Reclaimed Sites Sampling: BRES No. 37 – Josephine Shaft Site Evaluation Summary Report, Pioneer Technical Services, Inc.

PDF

Final 2022 Insufficiently Reclaimed Sites Sampling: BRES No. 38 – Sister Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.

PDF

Final 2022 Insufficiently Reclaimed Sites Sampling: BRES No. 96 – Washoe Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.

PDF

Final 2022 Unreclaimed Sites Sampling: UR-06 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

PDF

Final 2022 Unreclaimed Sites Sampling: UR-12 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

PDF

Final 2022 Unreclaimed Sites Sampling: UR-13 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

PDF

Final 2022 Unreclaimed Sites Sampling: UR-20 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

PDF

Final 2022 Unreclaimed Sites Sampling: UR-22 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

PDF

Final 2022 Unreclaimed Sites Sampling: UR-28 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

PDF

Final 2022 Unreclaimed Sites Sampling: UR-28 Site Evaluation Summary ReportFinal 2022 Unreclaimed Sites Sampling: UR-28 Site Evaluation Summary Report, Pioneer Technical Services, Inc.

PDF

Final Annual Operations and Maintenance (O&M) Report: Butte Treatment Lagoon (BTL) System – 2023, Pioneer Technical Services, Inc.

PDF

Final Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites: UR-08 (Anderson Shaft) Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

PDF

Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.

PDF

Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – First Quarter 2025, Pioneer Technical Services, Inc.

PDF

Final Quarterly Operations and Maintenance Report: Butte Treatment Lagoon System – Third Quarter 2025, Pioneer Technical Services, Inc.

PDF

Final Silver Bow Creek Conservation Area (SBCCA) Construction Quality Assurance Plan (CQAP), Pioneer Technical Services, Inc.

PDF

Final Unreclaimed Sites Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.

PDF

Revised Draft Final Butte Priority Soils Operable Unit (BPSOU) Insufficiently Reclaimed Sites Josephine Shaft (BRES No. 37) Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.

PDF

Revised Draft Final Butte Priority Soils Operable Unit (BPSOU) Unreclaimed (UR) Sites New and Mahoney (UR-23) Construction Completion Report (CCR), Pioneer Technical Services, Inc.

PDF

Revised Draft Final Butte Priority Soils Operable Unit (BPSOU) Unreclaimed (UR) Sites New and Mahoney (UR-23) Construction Completion Report (CCR), Pioneer Technical Services, Inc.

PDF

Revised Draft Final Quarterly Operations and Maintenance Report: Butte Treatment Lagoon System – Second Quarter 2025, Pioneer Technical Services, Inc.

PDF

Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) 2022 Draft Final Insufficiently Reclaimed Sites Sampling: BRES No. 16 Site Evaluation Summary Report, Molly Roby

PDF

Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Rock Creek Cattle Company Borrow Submittal #2 (dated February 4, 2026), Molly Roby

PDF

Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Final Unreclaimed Sites Field Sampling Plan (FSP) Package #7: UR-01, UR-12, UR-03, UR-04, UR-15, and UR-17 Amendment (dated April 28, 2026), Molly Roby

PDF

Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Revised Draft Final 2022 Unreclaimed Sites Sampling: UR-06 Site Evaluation Summary Report (dated December 10, 2025), Molly Roby

PDF

Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Revised Draft Final 2022 Unreclaimed Sites Sampling: UR-12 Site Evaluation Summary Report (dated December 9, 2025), Molly Roby

PDF

Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Revised Draft Final 2022 Unreclaimed Sites Sampling: UR-22 Site Evaluation Summary Report (dated December 10, 2025), Molly Roby

PDF

Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Revised Draft Final Insufficiently Reclaimed Sites Joesphine Shaft (BRES No. 37) – Remedial Action Work Plan (RAWP) (dated March 24, 2026), Molly Roby

PDF

Re: Approval letter for the Butte Priority Soils Operable Unit - Draft Final 2022 Insufficiently Reclaimed Sites Sampling: BRES No. 96 – Washoe Dump Site Evaluation Summary Report, Molly Roby

PDF

Re: Approval letter for the Draft Final 2026 Butte Priority Soils Operable Unit (BPSOU) McDermott Basin Creek Water Treatment Plant Subsurface Fill Borrow Submittal #1, Molly Roby

PDF

Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) 2026 Revised Draft Final Backfill and Cover Soil Quality Assurance Project Plan (QAPP) (dated January 5, 2026), Molly Roby

PDF

Re: Comment letter for the Draft Final Butte Priority Soils Operable Unit (BPSOU) Insufficiently Reclaimed Sites BRES No. 30 – Atlantic 1 Remedial Action Work Plan (RAWP) (dated March 24, 2026), Molly Roby

PDF

Re: Conditional Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Potential Logan, Montana, Borrow Source Site Environmental Assessment Checklist, Molly Roby

PDF

Re: Conditional Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Revised Butte Hill Revegetation Specifications (dated August 15, 2025), Molly Roby

PDF

Re: Conditional Approval letter for the Butte Priority Soils Operable Unit Draft Final 2022 Insufficiently Reclaimed Sites Sampling: BRES No. 50 – Zelia Site Evaluation Summary Report, Molly Roby

PDF

Re: Conditional approval letter with comments for the Draft Final 2026 Residential Metals Abatement Program (RMAP) Anselmo Mine Yard Development Plan (dated February 25, 2026), Molly Roby

PDF

Re: Approval letter for the Final Repository Siting Study (RSS) Detailed Evaluation and Recommendations Report (dated February 11, 2026), Emma Rott

PDF

Re: Comment Letter for Draft Clark Tailings Consolidated Waste Management Area (CTCWMA) 2024 Data Summary Report (dated October 15, 2025), Emma Rott

PDF

Re: Comment letter for the 2020 through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Area NPL Site, Butte Priority Soils Operable Unit (BPSOU) Consent Decree-Civil Action No. CV89-039-BU-SHE (dated February 3, 2026), Emma Rott

PDF

Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Draft 2022 Stormwater Evaluation and Maintenance Report (dated February 27, 2026), Emma Rott

PDF

Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Draft 2023 Stormwater Evaluation and Maintenance Report (dated February 27, 2026), Emma Rott

PDF

Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Draft 2024 Stormwater Evaluation and Maintenance Report (dated February 27, 2026), Emma Rott

PDF

Re: Conditional Approval Letter for Revised Clark Tailings Consolidated Waste Management Area (CTCWMA) Site Investigation Data Summary Report 2024 and Response to EPA Comment Letter (dated February 24, 2026), Emma Rott

PDF

Re: Conditional Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Butte Treatment Lagoons (BTL) Groundwater Treatment System Quarterly Operation and Maintenance Report – Quarter 3 2025 (dated December 23, 2025), Emma Rott

PDF

Re: Conditional Approval Letter for the Draft Final Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Pre-Design Investigation (PDI) Evaluation Report (dated September 12, 2025), Emma Rott

PDF

Re: Conditional Approval Letter with comments for Butte Priority Soils Operable Unit (BPSOU) Draft Final 2026 Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (QAPP) (dated February 4, 2026), Emma Rott

Submissions from 2025

PDF

REVISED FINAL MULTI-PATHWAY RESIDENTIAL METALS ABATEMENT PROGRAM PLAN, Atlantic Richfield Company and Butte Silver Bow

PDF

REVISED FINAL MULTI-PATHWAY RESIDENTIAL METALS ABATEMENT PROGRAM PLAN, Atlantic Richfield Company and Butte Silver Bow

PDF

Berkeley Pit and Discharge Pilot Project Quarterly Pilot Project Report Second Quarter 2025, Atlantic Richfield Company and Montana Resources, LLC

PDF

Berkeley Pit and Discharge Pilot Project Quarterly Pilot Project Report Third Quarter 2024, Atlantic Richfield Company and Mark Thompson

PDF

Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - CCCS Gym Annex, Christopher Berg and Thomas J. Beckman

PDF

Butte Priority Soils Operable Unit (BPSOU) 2024 Monthly Progress Report. Consent Decree for the Butte Priority Soils Operable Unit. Civil Action No. CV 89-039-BU-SEH, Josh Bryson

PDF

Butte Priority Soils Operable Unit (BPSOU) 2025 Monthly Progress Report. Consent Decree for the Butte Priority Soils Operable Unit. Civil Action No. CV 89-039-BU-SEH, Josh Bryson

PDF

Butte Priority Soils Operable Unit (BPSOU) 2025 Monthly Progress Report. Consent Decree for the Butte Priority Soils Operable Unit. Civil Action No. CV 89-039-BU-SEH, Josh Bryson

PDF

Butte Priority Soils Operable Unit (BPSOU) 2025 Monthly Progress Report. Consent Decree for the Butte Priority Soils Operable Unit. Civil Action No. CV 89-039-BU-SEH, Josh Bryson

PDF

Butte Priority Soils Operable Unit (BPSOU) 2025 Monthly Progress Report. Consent Decree for the Butte Priority Soils Operable Unit. Civil Action No. CV 89-039-BU-SEH, Josh Bryson

PDF

Butte Priority Soils Operable Unit (BPSOU) Groundwater Remedy Optimization Subdrain Pump Station Preliminary (30%) Remedial Design Package Submittal, Josh Bryson

PDF

Butte Priority Soils Operable Unit (BPSOU) Superfund Operation and Maintenance (O&M) Request for Maintenance – Kelley Stormwater Channels (Dated April 22, 2025), Josh Bryson

PDF

MONTHLY PROGRESS REPORT BUTTE PRIORITY SOILS OPERABLE UNIT CONSENT DECREE PARTIAL REMEDIAL DESIGN/REMEDIAL ACTION AND OPERATION AND MAINTENANCE, Josh Bryson

PDF

RE: 1st Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson