Follow
Submissions from 2026
PDF
Butte Priority Soils Operable Unit (BPSOU) 2025 Monthly Progress Report. Consent Decree for the Butte Priority Soils Operable Unit. Civil Action No. CV 89-039-BU-SEH, Atlantic Richfield Company
PDF
Final Repository Siting Study (RSS) Detailed Evaluation and Recommendations Report, Atlantic Richfield Company and Butte Silver Bow
PDF
2020 through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson
PDF
2020 through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson
PDF
2020 through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson
PDF
2020 through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson
PDF
2020 through 2024 Groundwater Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson
PDF
2020 through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson
PDF
2020 through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson
PDF
2020 through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson
PDF
2020 through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson
PDF
2020 through 2024 Surface Water Compliance Evaluation Technical Memorandums Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson
PDF
MONTHLY PROGRESS REPORT BUTTE PRIORITY SOILS OPERABLE UNIT CONSENT DECREE PARTIAL REMEDIAL DESIGN/REMEDIAL ACTION AND OPERATION AND MAINTENANCE January 2026, Josh Bryson
PDF
Response to Agency Comments Re: Comment Letter for the 2022 Butte Priority Soils Operable Unit (BPSOU) Groundwater Compliance Evaluation (dated March 10, 2025), Josh Bryson
PDF
Response to Agency Comments Re: Comment Letter for the 2023 Butte Priority Soils Operable Unit (BPSOU) Groundwater Compliance Evaluation (dated March 10, 2025) Received May 7, 2025, Josh Bryson
PDF
Response to Agency Comments Re: Comments on the Draft Butte Priority Soils Operable Unit (BPSOU) 2020 Groundwater Compliance and Interpretation Technical Memorandum (dated May 12, 2022, Josh Bryson
PDF
Response to Agency Comments Re: Comments on the Draft Butte Priority Soils Operable Unit (BPSOU) Draft Surface Water Compliance and Interpretation Technical Memorandum (dated May 12, 2022), Josh Bryson
PDF
2024 Annual Operations and Maintenance Report - 2024 BRES Annual Summary Report for Work Completed in Quadrant 4, Butte-Silver Bow Department of Reclamation and Environmental Services
PDF
Butte Priority Soils Operable Unit (BPSOU) Data Summary Report (DSR) Statement of Authenticity Updates, Mike McAnulty
PDF
Butte Medical Monitoring Working Group Meeting, Mike McAnulty and Eric Hassler
PDF
2026 Revised Draft Final BPSOU Backfill and Cover Material Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
PDF
Final 2022 Insufficiently Reclaimed Sites Sampling: BRES No. 30 – Atlantic-1 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
PDF
Final 2022 Insufficiently Reclaimed Sites Sampling: BRES No. 32 – Corra 2 Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.
PDF
Final 2022 Insufficiently Reclaimed Sites Sampling: BRES No. 38 – Sister Dump Site Evaluation Summary Report, Pioneer Technical Services, Inc.
PDF
Final 2022 Unreclaimed Sites Sampling: UR-06 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
PDF
Final 2022 Unreclaimed Sites Sampling: UR-12 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
PDF
Final 2022 Unreclaimed Sites Sampling: UR-13 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
PDF
Final 2022 Unreclaimed Sites Sampling: UR-20 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
PDF
Final 2022 Unreclaimed Sites Sampling: UR-22 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
PDF
Final 2022 Unreclaimed Sites Sampling: UR-28 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
PDF
Final 2022 Unreclaimed Sites Sampling: UR-28 Site Evaluation Summary ReportFinal 2022 Unreclaimed Sites Sampling: UR-28 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
PDF
Final Annual Operations and Maintenance (O&M) Report: Butte Treatment Lagoon (BTL) System – 2023, Pioneer Technical Services, Inc.
PDF
Final Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites: UR-08 (Anderson Shaft) Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
PDF
Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Revised Draft Final 2022 Unreclaimed Sites Sampling: UR-06 Site Evaluation Summary Report (dated December 10, 2025), Molly Roby
PDF
Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Revised Draft Final 2022 Unreclaimed Sites Sampling: UR-12 Site Evaluation Summary Report (dated December 9, 2025), Molly Roby
PDF
Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Revised Draft Final 2022 Unreclaimed Sites Sampling: UR-22 Site Evaluation Summary Report (dated December 10, 2025), Molly Roby
PDF
Re: Approval letter for the Draft Final 2026 Butte Priority Soils Operable Unit (BPSOU) McDermott Basin Creek Water Treatment Plant Subsurface Fill Borrow Submittal #1, Molly Roby
PDF
Re: Comment letter for the Butte Priority Soils Operable Unit (BPSOU) 2026 Revised Draft Final Backfill and Cover Soil Quality Assurance Project Plan (QAPP) (dated January 5, 2026), Molly Roby
PDF
Re: Conditional Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Potential Logan, Montana, Borrow Source Site Environmental Assessment Checklist, Molly Roby
PDF
Re: Comment Letter for Draft Clark Tailings Consolidated Waste Management Area (CTCWMA) 2024 Data Summary Report (dated October 15, 2025), Emma Rott
PDF
Re: Conditional Approval Letter for the Draft Final Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Pre-Design Investigation (PDI) Evaluation Report (dated September 12, 2025), Emma Rott
PDF
Re: Conditional Approval Letter with comments for Butte Priority Soils Operable Unit (BPSOU) Draft Final 2026 Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (QAPP) (dated February 4, 2026), Emma Rott
Submissions from 2025
PDF
REVISED FINAL MULTI-PATHWAY RESIDENTIAL METALS ABATEMENT PROGRAM PLAN, Atlantic Richfield Company and Butte Silver Bow
PDF
REVISED FINAL MULTI-PATHWAY RESIDENTIAL METALS ABATEMENT PROGRAM PLAN, Atlantic Richfield Company and Butte Silver Bow
PDF
Berkeley Pit and Discharge Pilot Project Quarterly Pilot Project Report Second Quarter 2025, Atlantic Richfield Company and Montana Resources, LLC
PDF
Berkeley Pit and Discharge Pilot Project Quarterly Pilot Project Report Third Quarter 2024, Atlantic Richfield Company and Mark Thompson
PDF
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - CCCS Gym Annex, Christopher Berg and Thomas J. Beckman
PDF
Butte Priority Soils Operable Unit (BPSOU) 2024 Monthly Progress Report. Consent Decree for the Butte Priority Soils Operable Unit. Civil Action No. CV 89-039-BU-SEH, Josh Bryson
PDF
Butte Priority Soils Operable Unit (BPSOU) 2025 Monthly Progress Report. Consent Decree for the Butte Priority Soils Operable Unit. Civil Action No. CV 89-039-BU-SEH, Josh Bryson
PDF
Butte Priority Soils Operable Unit (BPSOU) 2025 Monthly Progress Report. Consent Decree for the Butte Priority Soils Operable Unit. Civil Action No. CV 89-039-BU-SEH, Josh Bryson
PDF
Butte Priority Soils Operable Unit (BPSOU) 2025 Monthly Progress Report. Consent Decree for the Butte Priority Soils Operable Unit. Civil Action No. CV 89-039-BU-SEH, Josh Bryson
PDF
Butte Priority Soils Operable Unit (BPSOU) 2025 Monthly Progress Report. Consent Decree for the Butte Priority Soils Operable Unit. Civil Action No. CV 89-039-BU-SEH, Josh Bryson
PDF
Butte Priority Soils Operable Unit (BPSOU) Groundwater Remedy Optimization Subdrain Pump Station Preliminary (30%) Remedial Design Package Submittal, Josh Bryson
PDF
Butte Priority Soils Operable Unit (BPSOU) Superfund Operation and Maintenance (O&M) Request for Maintenance – Kelley Stormwater Channels (Dated April 22, 2025), Josh Bryson
PDF
MONTHLY PROGRESS REPORT BUTTE PRIORITY SOILS OPERABLE UNIT CONSENT DECREE PARTIAL REMEDIAL DESIGN/REMEDIAL ACTION AND OPERATION AND MAINTENANCE, Josh Bryson
PDF
RE: 1st Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson
PDF
RE: 2025 Spring Semi-Annual – Interim Site-Wide Groundwater Monitoring Data Report Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson
PDF
RE: 2nd Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson
PDF
RE: 3rd Quarter 2025 – Interim Site-Wide Surface Water Monitoring Data Report Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson
PDF
RE: BPSOU Superfund Stormwater Operation and Maintenance (O&M) Request for Maintenance – Kelley Stormwater Channels, Josh Bryson
PDF
RE: Butte Priority Soils Operable Unit (BPSOU) 2025 Monthly Progress Report. Consent Decree for the Butte Priority Soils Operable Unit. Civil Action No. CV 89-039-BU-SEH, Josh Bryson
PDF
RE: Butte Priority Soils Operable Unit (BPSOU) Superfund Operation and Maintenance (O&M) Request for Maintenance – Kelley Stormwater Channels (Dated April 22, 2025), Josh Bryson
PDF
RE: Butte Priority Soils Operable Unit Final Leak Infiltration Evaluation, Josh Bryson
PDF
RE: Continued Use of the Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson
PDF
RE: Continued Use of the Approved Groundwater Quality Assurance Project Plan Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson
PDF
RE: Continued Use of the Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson
PDF
RE: Continued Use of the Approved Surface Water Quality Assurance Project Plan Silver Bow Creek Butte Area NPL Site, Butte Priority Soils Operable Unit Consent Decree-Civil Action No. CV 89-039-BU-SHE, Josh Bryson
PDF
RE: Final Blacktail Creek Groundwater Hydraulic Control System Pre-Design Investigation Evaluation Report, Josh Bryson
PDF
RE: Silver Bow Creek Butte Area NPL Site 4th Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. CV 89- 039-BU-SHE, Josh Bryson
PDF
RE: Silver Bow Creek Butte Area NPL Site Fall Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. CV 89-039-BU-SHE, Josh Bryson
PDF
Silver Bow Creek Butte Area NPL Site 4th Quarter 2024 Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Data Report. Consent Decree- Civil Action No. CV 89- 039-BU-SHE, Josh Bryson
PDF
Silver Bow Creek Butte Area NPL Site Fall Semi-Annual 2024 Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Data Report. Consent Decree- Civil Action No. CV 89-039-BU-SHE, Josh Bryson
PDF
2022 Annual Operations and Maintenance Report, Butte Silver Bow
PDF
2023 Annual Operations and Maintenance Report, Butte-Silver Bow Department of Reclamation and Environmental Services
PDF
2024 Annual Operations and Maintenance Report, Butte-Silver Bow Department of Reclamation and Environmental Services
PDF
2025 Field Evaluation of Reclaimed Sites Summary Report, Butte-Silver Bow Department of Reclamation and Environmental Services
PDF
Butte Reclamation Evaluation System Corrective Action Plans for Reclaimed Sites - 2024 BRES Site Specific Corrective Action Plans for Quadrant 1, Butte-Silver Bow Department of Reclamation and Environmental Services
PDF
Exhibit 2 “Basement ISWP” 1029 Oregon Ave. Butte, MT 59701 January 30, 2025 Database Residential Identifier: R-03611, Butte-Silver Bow Department of Reclamation and Environmental Services
PDF
Exhibit 2 “Basement ISWP” 122 W. Daly St. Butte, MT 59701 January 16, 2025 Database Residential Identifier: R-00845, Butte-Silver Bow Department of Reclamation and Environmental Services
PDF
Exhibit 2 “Basement ISWP” 1232 E. Second St. Butte, MT 59701 January 21, 2025 Database Residential Identifier: R-04389, Butte-Silver Bow Department of Reclamation and Environmental Services
PDF
Exhibit 2 “Basement ISWP” 223 N. Alabama St. Butte, MT 59701 January 2, 2025 Database Residential Identifier: R-00455, Butte-Silver Bow Department of Reclamation and Environmental Services
PDF
Exhibit 2 “Basement ISWP” 537 S. Colorado St. Butte, MT 59701 January 22, 2025 Database Residential Identifier: R-05338, Butte-Silver Bow Department of Reclamation and Environmental Services
PDF
Exhibit 2 “Basement ISWP” 604 S. Clark St. Butte, MT 59701 January 24, 2025 Database Residential Identifier: R-01537, Butte-Silver Bow Department of Reclamation and Environmental Services
PDF
Exhibit 2 “Basement ISWP” 615 W. Galena St. Butte, MT 59701 January 23, 2025 Database Residential Identifier: R-05384, Butte-Silver Bow Department of Reclamation and Environmental Services
PDF
FINAL REMOVAL SIGN OFF Individual Site Work Plans 2025 Round 2 RMAP Basement Projects Butte, MT 59701 January 31, 2025, Butte-Silver Bow Department of Reclamation and Environmental Services and Atlantic Richfield Company
PDF
REVISED FINAL - MULTI-PATHWAY RESIDENTIAL METALS ABATEMENT PROGRAM PLAN, Butte-Silver Bow Department of Reclamation and Environmental Services and Atlantic Richfield Company
PDF
RESPONSE TO EPA COMMENTS DATED SEPTEMBER 16, 2025 FOR THE BLACKTAIL CREEK RIPARIAN ACTIONS UNIFORM FEDERAL POLICY - QUALITY ASSURANCE PROJECT PLAN SILVER BOW CREEK/BUTTE AREA SUPERFUND SITE SILVER BOW COUNTY, MONTANA, Environmental Protection Agency
PDF
EPA REGION 8 OPTIMIZED UFP-QAPP REVIEW CROSSWALK, Environmental Protection Agency and Emma Rott
PDF
Residential Metals Abatement Program Construction Completion Report East Middle School, Environmental Resource Management (ERM)
PDF
2024 RMAP NON-RESIDENTIAL PARCELS DATA SUMMARY REPORT SILVER BOW CREEK/BUTTE AREA NPL SITE BPSOU, Environmental Standards, Inc. and Pioneer Technical Services, Inc.
PDF
NRDP Comments on BP-Atlantic Richfield (BP-AR’s) Draft Materials Management Plan and Associated Documents at Butte Priority Soils Operable Unit of the Silver Bow Creek/Butte Area Superfund Site, Jim Ford
PDF
Blacktail Creek PDIER, HGL
PDF
DRAFT FINAL PHASE I PRE-DESIGN INVESTIGATION EVALUATION REPORT BLACKTAIL CREEK RIPARIAN ACTIONS BUTTE PRIORITY SOILS OPERABLE UNIT OF THE SILVER BOW CREEK/BUTTE AREA SUPERFUND SITE SILVER BOW COUNTY, MONTANA, HydroGeoLogic, Inc.
File
REVISED DRAFT FINAL UNIFORM FEDERAL POLICYQUALITY ASSURANCE PROJECT PLAN, HydroGeoLogic, Inc.
PDF
REVISED FINAL UNIFORM FEDERAL POLICY- QUALITY ASSURANCE PROJECT PLAN, HydroGeoLogic, Inc.
PDF
REVISED FINAL UNIFORM FEDERAL POLICYQUALITY ASSURANCE PROJECT PLAN, HydroGeoLogic, Inc.
PDF
Butte Priority Soils Operable Unit (BPSOU)2020 Consent Decree Appendix D Attachment C Sections 7 and 8 Discrepancies, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites Field Sampling and Investigation Plan (FSP): BRES No. 100 – Capri Motel – Arctic Dump, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Draft Final Reclamation Improvement Sites Field Sampling and Investigation Plan (FSP): BRES No. 18 – Walkerville Ballfield, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Final BPSOU Insufficiently Reclaimed Sites Belle of Butte (BRES No. 8 & UR-39) Remedial Action Work Plan (RAWP) Request for Change IR- 2024-RA-01, Mike McAnulty