Submissions from 2024
Butte Priority Soils Operable Unit (BPSOU) Draft Final Unreclaimed Sites Field Sampling Plan (FSP) Package #11: UR-49 and UR-50, Atlantic Richfield Company
TECHNICAL SPECIFICATIONS - Silver Bow Creek Conservation Area - 60% SUBMITTAL April 2024, Atlantic Richfield Company
Residential Metals Abatement Program – Interior School Dust – Investigation Summary Report – After the Bell Child Care Center, Thomas J. Beckman, Christopher Berg, and Environmental Resource Management (ERM)
Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Butte Career Center / Webster Garfield, Christopher Berg and Thomas J. Beckman
Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) East Middle School, Christopher Berg and Thomas J. Beckman
Residential Metals Abatement Program Construction Completion Report Kennedy Elementary, Christopher Berg, Thomas J. Beckman, and Environmental Resource Management (ERM)
Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Silver Bow Montessori, Christopher Berg, Thomas J. Beckman, and Environmental Resource Management (ERM)
Berkely Pit Repository Cost Comparison, Josh Bryson
Butte Priority Soils Operable Unit Diggings East 60% Remedial Design Package Submittal, Josh Bryson
Butte Priority Soils Operable Unit Grove Gulch Sedimentation Bay 100% Remedial Design, Josh Bryson
Silver Bow Creek Conservation Area (SBCCA) 60% Technical Specifications Submittal, Josh Bryson
TECHNICAL MEMORANDUM Grove Gulch Earth Volumetric Studio Model Inputs, Josh Bryson
2024 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) – Indoor Dust – Group 10 - After the Bell Child Care Center, Environmental Resource Management (ERM)
2024 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) – Indoor Dust – Group 11 - Baptist Student Union, Environmental Resource Management (ERM)
2024 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) – Indoor Dust – Group 11 - Baptist Student Union, Environmental Resource Management (ERM)
2024 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) – Indoor Dust – Kennedy Elementary Surface Dust Resampling, Environmental Resource Management (ERM)
2024 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) – Indoor Dust – Kennedy Elementary Surface Dust Resampling, Environmental Resource Management (ERM)
Remedial Action Work Plan Silver Bow Montessori, Environmental Resource Management (ERM)
Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Small World Day Care, Environmental Resource Management (ERM)
Residential Metals Abatement Program Construction Completion Report (Non-Residential Parcels – Indoor Soil) - Butte High School, Environmental Resource Management (ERM)
Residential Metals Abatement Program Construction Completion Report (Non-Residential Parcels – Indoor Soil) - Butte High School, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - East Middle School, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) East Middle School, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - Emerson Elementary School, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - Gold Hill Lutheran Church (Creativity Factory Preschool), Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non- Residential Parcels – Indoor Dust) Small World Daycare, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - Small World Daycare, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - Small World Daycare, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) United Congregational Church (Crayon Academy Preschool), Environmental Resource Management (ERM)
BMFOU Pilot Project RFC - REQUEST FOR CHANGE, Nikia Greene and Daryl Reed
Repository and Haul Route Geotechnical Pre-Design Investigation (PDI) Work Plan, Jacobs Engineering Group
Repository and Proposed Haul Route – Silver Bow Creek Conservation Area Quality Assurance Project Plan, Jacobs Engineering Group
Approved Butte Priority Soils Operable Unit (BPSOU) Unreclaimed and Insufficiently Reclaimed Sites Request for Change 2023-02, Mike McAnulty
Approved Butte Priority Soils Operable Unit (BPSOU) Unreclaimed and Insufficiently Reclaimed Sites Request for Information 2022-01, Mike McAnulty
Medical Monitoring Working Group Focused Call Summaries, Mike McAnulty
Medical Monitoring Working Group Focused Call Summary Amendment, Mike McAnulty
Medical Monitoring Working Group Meeting Minutes, Mike McAnulty
2024 Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
2024 Draft Final Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
2024 Draft Final Unreclaimed Sites Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
Draft Final 2021-2022 Residential Metals Abatement Program (RMAP) Aware Early Head Start Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.
Draft Final 2021 Residential Metals Abatement Program (RMAP) Head Start (former Lincoln School) Soil Remedial Action Construction Completion Report, Pioneer Technical Services, Inc.
Draft Final 2023 BPSOU Subdrain Data Summary Report (DSR), Pioneer Technical Services, Inc.
Draft Final 2023 Residential Metals Abatement Program (RMAP) Whitehall Borrow Submittal #2, Pioneer Technical Services, Inc.
Draft Final 2024 Butte Priority Soils Operable Unit Helehan Borrow Submittal #2, Pioneer Technical Services, Inc.
Draft Final 2024 Butte Priority Soils Operable Unit Type B Borrow Material Submittal #2, Pioneer Technical Services, Inc.
Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2023, Pioneer Technical Services, Inc.
Draft Final Revised Residential Metals Abatement Program (RMAP) Quality Assurance Project Plan (QAPP) (Residential Parcels), Pioneer Technical Services, Inc.
Final 2023 Butte Priority Soils Operable Unit Type B Borrow Material Submittal #1, Pioneer Technical Services, Inc.
Final 2024 Butte Priority Soils Operable Unit Helehan Borrow Submittal #2, Pioneer Technical Services, Inc.
Final 2024 Butte Priority Soils Operable Unit Type B Borrow Material Submittal #2, Pioneer Technical Services, Inc.
Final 2024 Residential Metals Abatement Program (RMAP) Baptist Student Union (former McKinley School) Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Final 2024 Residential Metals Abatement Program (RMAP) Whitehall Borrow Submittal #2, Pioneer Technical Services, Inc.
Final 2024 Residential Metals Abatement Program (RMAP) Whitehall Borrow Submittal #2, Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit Repository Screening Report, Pioneer Technical Services, Inc.
Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – First Quarter 2022, Pioneer Technical Services, Inc.
Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Second Quarter 2022, Pioneer Technical Services, Inc.
FINAL REPOSITORY SCREENING REPORT, Pioneer Technical Services, Inc.
Grove Gulch Sedimentation Bay Final Remedial Design Report, Woodard & Curran
Health and Safety Plan (HASP) Butte Priority Soils Operable Unit, Woodard & Curran
Submissions from 2023
Comment Letter for Draft BPSOU Uncontrolled Surface Flow Areas Remedial Design (RD) Work Plan and Draft BPSOU Uncontrolled Surface Flow Areas Pre-Design Investigation (PDI) Work Plan (dated August 31, 2023), Atlantic Richfield Company
Revised Final Multi-Pathway Residential Metals Abatement Program Plan, Atlantic Richfield Company and Butte Silver Bow
2022 Stormwater BMPs Repair, Inspection Report, and Maintenance Work Plan BNSF Railway Company and Union Pacific Railroad Company Butte Priority Soils Operable Unit KJ 2299019.00, Doug Brannan P.E. and Kennedy Jenks
Approved Butte Reduction Works (BRW) Phase III Quality Assurance Project Plan (QAPP) Request for Change BRW-2023-01, Josh Bryson
BPSOU Buffalo Gulch Forebay Parcel 2023 Expedited Well Abandonment Plan, Josh Bryson
Butte Reduction Works (BRW) Phase III Quality Assurance Project Plan (QAPP) Request for Change BRW-2023-01, Josh Bryson
Butte Reduction Works (BRW) Phase III Quality Assurance Project Plan (QAPP) Request for Change BRW-2023-03, Josh Bryson
Final Butte Reduction Works (BRW) Phase III Quality Assurance Project Plan (QAPP) Request for Change BRW-2023-03, Josh Bryson