Submissions from 2025
REVISED FINAL MULTI-PATHWAY RESIDENTIAL METALS ABATEMENT PROGRAM PLAN, Atlantic Richfield Company and Butte Silver Bow
Berkeley Pit and Discharge Pilot Project Quarterly Pilot Project Report Third Quarter 2024, Atlantic Richfield Company and Mark Thompson
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - CCCS Gym Annex, Christopher Berg and Thomas J. Beckman
Butte Reclamation Evaluation System Corrective Action Plans for Reclaimed Sites - 2024 BRES Site Specific Corrective Action Plans for Quadrant 1, Butte-Silver Bow Department of Reclamation and Environmental Services
Exhibit 2 “Basement ISWP” 1029 Oregon Ave. Butte, MT 59701 January 30, 2025 Database Residential Identifier: R-03611, Butte-Silver Bow Department of Reclamation and Environmental Services
Exhibit 2 “Basement ISWP” 122 W. Daly St. Butte, MT 59701 January 16, 2025 Database Residential Identifier: R-00845, Butte-Silver Bow Department of Reclamation and Environmental Services
Exhibit 2 “Basement ISWP” 1232 E. Second St. Butte, MT 59701 January 21, 2025 Database Residential Identifier: R-04389, Butte-Silver Bow Department of Reclamation and Environmental Services
Exhibit 2 “Basement ISWP” 223 N. Alabama St. Butte, MT 59701 January 2, 2025 Database Residential Identifier: R-00455, Butte-Silver Bow Department of Reclamation and Environmental Services
Exhibit 2 “Basement ISWP” 537 S. Colorado St. Butte, MT 59701 January 22, 2025 Database Residential Identifier: R-05338, Butte-Silver Bow Department of Reclamation and Environmental Services
Exhibit 2 “Basement ISWP” 604 S. Clark St. Butte, MT 59701 January 24, 2025 Database Residential Identifier: R-01537, Butte-Silver Bow Department of Reclamation and Environmental Services
Exhibit 2 “Basement ISWP” 615 W. Galena St. Butte, MT 59701 January 23, 2025 Database Residential Identifier: R-05384, Butte-Silver Bow Department of Reclamation and Environmental Services
FINAL REMOVAL SIGN OFF Individual Site Work Plans 2025 Round 2 RMAP Basement Projects Butte, MT 59701 January 31, 2025, Butte-Silver Bow Department of Reclamation and Environmental Services and Atlantic Richfield Company
Residential Metals Abatement Program Construction Completion Report East Middle School, Environmental Resource Management (ERM)
2025 Draft Final Unreclaimed Sites Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
Butte Reduction Works (BRW) Phase II Interim Demolition Plan Construction Drawings and Floodplain Encroachment Analysis, Pioneer Technical Services, Inc.
Draft Final BPSOU Insufficiently Reclaimed Sites Josephine Shaft (IR-37) Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Draft Final Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites: UR-03 Site Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Draft Final Silver Bow Creek Conservation Area Repository Data Gap Data Summary Report (DSR), Pioneer Technical Services, Inc.
Final Horseshoe Bend Effluent Line (HBEL) Discharge Structure Surface Enhancements Work Plan, Pioneer Technical Services, Inc.
Re: December 2024 Berkeley Pit Migratory Waterfowl Protection Monthly Report, Mark Thompson and Loren Burmeister
Re: Butte Mine Flooding Operable Unit Berkeley Pit and Discharge Pilot Project – December 2024 Monthly Discharge Monitoring Report, Mark Thompson and Dave Griffis
Re: BUTTE MINE FLOODING SITE CD, CV 02-35 Bu-RFC, 2024 Fourth Quarter Report, Mark Thompson and Dave Griffis
Submissions from 2024
PILOT PROJECT QUALITY ASSURANCE PROJECT PLAN 2024 UPDATE, Alloy Group
Butte Priority Soils Operable Unit (BPSOU) Draft Final Unreclaimed Sites Field Sampling Plan (FSP) Package #11: UR-49 and UR-50, Atlantic Richfield Company
TECHNICAL SPECIFICATIONS - Silver Bow Creek Conservation Area - 60% SUBMITTAL April 2024, Atlantic Richfield Company
REVISED FINAL MULTI-PATHWAY RESIDENTIAL METALS ABATEMENT PROGRAM PLAN, Atlantic Richfield Company and Butte Silver Bow
Residential Metals Abatement Program – Interior School Dust – Investigation Summary Report – After the Bell Child Care Center, Thomas J. Beckman, Christopher Berg, and Environmental Resource Management (ERM)
Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Butte Career Center / Webster Garfield, Christopher Berg and Thomas J. Beckman
Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) East Middle School, Christopher Berg and Thomas J. Beckman
Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Kennedy Elementary, Christopher Berg and Thomas J. Beckman
Residential Metals Abatement Program Construction Completion Report Butte Career Center / Webster Garield, Christopher Berg, Thomas J. Beckman, and Environmental Resource Management (ERM)
Residential Metals Abatement Program Construction Completion Report Kennedy Elementary, Christopher Berg, Thomas J. Beckman, and Environmental Resource Management (ERM)
Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Silver Bow Montessori, Christopher Berg, Thomas J. Beckman, and Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report Kennedy Elementary School Post- Remedial Action Surface Dust Sampling, Christopher Berg and Elsie King
Berkeley Pit Geochemical and Limnological Evaluation Pre-Design Investigation (PDI) Work Plan, Josh Bryson
Berkely Pit Repository Cost Comparison, Josh Bryson
Butte Priority Soils Operable Unit Diggings East 60% Remedial Design Package Submittal, Josh Bryson
Butte Priority Soils Operable Unit Grove Gulch Sedimentation Bay 100% Remedial Design, Josh Bryson
Butte Priority Soils Operable Unit SBCCA Principles for a Greener Cleanup Report, Josh Bryson
Butte Reduction Works (BRW) Phase III Quality Assurance Project Plan (QAPP) Request for Change BRW-2024-01, Josh Bryson
RE: Butte Reduction Works (BRW) Phase III Quality Assurance Project Plan (QAPP) Request for Change BRW-2024-01, Josh Bryson
RE: Silver Bow Creek Conservation Area Repository Data Gap Quality Assurance Project Plan (QAPP), Josh Bryson
Silver Bow Creek Conservation Area (SBCCA) 60% Technical Specifications Submittal, Josh Bryson
TECHNICAL MEMORANDUM Grove Gulch Earth Volumetric Studio Model Inputs, Josh Bryson
Pilot Project 2024 Annual Update, Loren Burmeister and Mark Thompson
Butte Priority Soils Operable Unit, Butte Reclamation Evaluation System Draft 2024 Field Evaluation of Previously Reclaimed Sites Summary and Technical Recommendations Report, Butte-Silver Bow Department of Reclamation and Environmental Services
FINAL 2023 BRES FSR and CAPs, Butte-Silver Bow Department of Reclamation and Environmental Services
Proposed Plan to Amend the Remedial Action for the Butte Priority Soils Operable Unit, Environmental Protection Agency
2024 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) – Indoor Dust – Group 10 - After the Bell Child Care Center, Environmental Resource Management (ERM)
2024 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) – Indoor Dust – Group 11 - Baptist Student Union, Environmental Resource Management (ERM)
2024 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) – Indoor Dust – Group 11 - Baptist Student Union, Environmental Resource Management (ERM)
2024 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) – Indoor Dust – Kennedy Elementary Surface Dust Resampling, Environmental Resource Management (ERM)
2024 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) – Indoor Dust – Kennedy Elementary Surface Dust Resampling, Environmental Resource Management (ERM)
Remedial Action Work Plan Silver Bow Montessori, Environmental Resource Management (ERM)
Residential Metals Abatement Program Construction Completion Report (Non- Residential Parcels – Indoor Dust) Small World Day Care, Environmental Resource Management (ERM)
Residential Metals Abatement Program Construction Completion Report (Non-Residential Parcels – Indoor Soil) - Butte High School, Environmental Resource Management (ERM)
Residential Metals Abatement Program Construction Completion Report (Non-Residential Parcels – Indoor Soil) - Butte High School, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report After the Bell Child Care Center, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - East Middle School, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) East Middle School, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) East Middle School, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - Emerson Elementary School, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - Gold Hill Lutheran Church (Creativity Factory Preschool), Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non- Residential Parcels – Indoor Dust) Small World Daycare, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - Small World Daycare, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - Small World Daycare, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) United Congregational Church (Crayon Academy Preschool), Environmental Resource Management (ERM)
Re: Approval of Berkeley Pit Predictive Water Level Model letter; dated January 24, 2024, Nikia Greene
BMFOU Pilot Project RFC - REQUEST FOR CHANGE, Nikia Greene and Daryl Reed
Submittal of Operations and Maintenance Manual for the Horseshoe Bend Water Treatment Plant, Dave Griffis and Mark Thompson
Repository and Haul Route Geotechnical Pre-Design Investigation (PDI) Work Plan, Jacobs Engineering Group
Repository and Proposed Haul Route – Silver Bow Creek Conservation Area Quality Assurance Project Plan, Jacobs Engineering Group