Content Posted in 2023
10568969 EDD, Pioneer Technical Services, Inc.
10568969_EDD, Pioneer Technical Services, Inc.
10577063 EDD, Pioneer Technical Services, Inc.
10577069 EDD, Pioneer Technical Services, Inc.
10577877 EDD, Environmental Protection Agency and Pioneer Technical Services, Inc.
10578145, Pioneer Technical Services, Inc. and Environmental Protection Agency
10578172 EDD, Pioneer Technical Services, Inc.
10578889 EDD, Pioneer Technical Services, Inc.
10578891 EDD, Pioneer Technical Services, Inc.
10585806 EDD, Pioneer Technical Services, Inc. and Environmental Protection Agency
10586986 EDD, Pioneer Technical Services, Inc.
10586986 EDD, Pioneer Technical Services, Inc.
10587273 EDD, Pioneer Technical Services, Inc.
1st Sem 2022 BPSOU GW Data, Woodard & Curran and Hannah Foster
2019 - 2021 WSSSOU Data For GIS, Pioneer Technical Services, Inc.
2021 2Q BTL Chem Dump, Environmental Protection Agency and Pioneer Technical Services, Inc.
2021 2Q BTL Daily PTS Field Dump, Environmental Protection Agency and Pioneer Technical Services, Inc.
2021 3Q BTL ChemDump, Pioneer Technical Services, Inc. and Environmental Protection Agency
2021 3Q BTL ChemDump, Pioneer Technical Services, Inc.
2021 3Q BTL Daily PTS Field Dump, Environmental Protection Agency and Pioneer Technical Services, Inc.
2021 3Q BTL Daily PTS Field Dump, Pioneer Technical Services, Inc.
2021 3Q Laboratory EDD, Pioneer Technical Services, Inc.
2021 3Q Laboratory EDDs, Pioneer Technical Services, Inc. and Environmental Protection Agency
2021 BPSOU Subdrain Electronic Database, Pioneer Technical Services, Inc.; Atlantic Richfield Company; and Environmental Protection Agency
2021 BTL O&M Events Log, Pioneer Technical Services, Inc.
2021 BTL O&M Events Log / 2021 Daily Log, Pioneer Technical Services, Inc. and Environmental Protection Agency
2021 BTL O&M Events Log / 2021 Daily Log, Pioneer Technical Services, Inc.
2021 Final Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (QAPP) for Microbial Analysis and Biotreatability Study, Pioneer Technical Services, Inc.
2021 RMAP NON-RESIDENTIAL PARCELS DATA SUMMARY REPORT SILVER BOW CREEK/BUTTE AREA NPL SITE BPSOU, Environmental Standards, Inc. and Pioneer Technical Services, Inc.
2021 Second Quarter Laboratory EDD, Environmental Protection Agency and Pioneer Technical Services, Inc.
2022 3Q BTL Chemical Dump, Pioneer Technical Services, Inc.
2022 3Q Daily PTS Field Dump, Pioneer Technical Services, Inc.
2022 BTL O&M Events Log, Pioneer Technical Services, Inc.
2022 Draft Final Blacktail Creek Groundwater Hydraulic Control System Remedial Design Work Plan, Stantec Consulting Services, Inc.
2022 Draft Final Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Organic Pollutant Surface Water Sampling Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
2022 - Draft Final - Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Phase III Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
2022 Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (QAPP), TREC Inc., A Woodard and Curran Company
2022 Final Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Phase III Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
2022 Final Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Phase III Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (QAPP) Revision 2, Pioneer Technical Services, Inc.
2022 - Final Revised - Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Phase II Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
2022 Final Unreclaimed Sites Quality Assurance Project Plan (QAPP) Revision 1, Pioneer Technical Services, Inc.
2022 Lab Results Annual, Pioneer Technical Services, Inc.
2022 Q1 BPSOU SW - Base Flow, TREC Inc., A Woodard and Curran Company
2022 Q2 BPSOU SW, Environmental Protection Agency and Pioneer Technical Services, Inc.
2022 Q4 BPSOU SW, Pioneer Technical Services, Inc.; Atlantic Richfield Company; and Environmental Protection Agency
2022 Stormwater BMPs Repair, Inspection Report, and Maintenance Work Plan BNSF Railway Company and Union Pacific Railroad Company Butte Priority Soils Operable Unit KJ 2299019.00, Doug Brannan P.E. and Kennedy Jenks
2023 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan, Nikia Greene
2023 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (QAPP), Woodard & Curran
2023 Draft Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan, Nikia Greene
2023 Draft Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (QAPP), Woodard & Curran
2023 Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
2023 Draft Final Unreclaimed Sites Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
2023 Final Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (QAPP), Woodard & Curran
2023 Final Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (QAPP), Woodard & Curran
2023 Final Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Organic Pollutant Surface Water Sampling Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
2023 Final Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Organic Pollutant Surface Water Sampling Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
2023 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
2023 Final Unreclaimed Sites Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
2023 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) – Indoor Dust – Group 9 - Montana Technological University (Prospector Residence Hall), Environmental Resource Management (ERM)
2023 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) – Interior Soils - Silver Bow Montessori, Environmental Resource Management (ERM)
A GUIDE TO FIFTY YEARS OF RESEARCH AT MONTANA TECH: Part 1-THE TREATMENT OF ARSENIC, SELENIUM, THALLIUM, METAL BEARING SOLUTIONS AND WASTE SOLIDS, Larry G. Twidwell
AN EXAMINATION OF THE IMPACTS OF BEAVER DAM MIMICRY STRUCTURES ON GROUNDWATER SURFACE-WATER INTERACTIONS IN LOWER MOUNTAIN RIPARIAN SYSTEMS, Mercedes D. Salazar
Approval Page - Butte Priority Soils Operable Unit Residential Metals Abatement Program - Field Sampling Plan - Goldhill Lutheran Church and United Congregational - Indoor Dust, Nikia Greene, Daryl Reed, and Eric Hassler
Approved Butte Reduction Works (BRW) Phase III Quality Assurance Project Plan (QAPP) Request for Change BRW-2023-01, Josh Bryson
Atlantic Richfield Response to Agency Comments on the Draft Butte Priority Soils Operable Unit (BPSOU) 2021 Groundwater Monitoring Data Summary Report, January 2021 – December 2021; dated April 8, 2022, Atlantic Richfield Company
Attachment D to the DSR; Work Order 10577874, 10584152 EDD, Pioneer Technical Services, Inc.
Attachments to Reports Generated April 2022, Atlantic Richfield Company; Environmental Protection Agency; and TREC Inc., A Woodard and Curran Company
BPSOU Draft Final Residential Metals Abatement Program (RMAP) QAPP (Non-Residential Parcels) (5/12/22), Nikia Greene, Butte Silver Bow, and Atlantic Richfield Company
BPSOU Draft Final Residential Metals Abatement Program (RMAP) QAPP (Non-Residential Parcels) (7/7/2021), Nikia Greene, Atlantic Richfield Company, and Butte Silver Bow
BTC Remediation and Contaminated Groundwater Hydraulic Control Site Pumping Test QAPP, Nikia Greene and Pioneer Technical Services, Inc.
Butte Priority Soils Operable Unit (BPSOU) Field XRF to Laboratory Correlation and Regression Analysis Procedure for Unreclaimed (UR) and Insufficiently Reclaimed (IR) Sites, Mike McAnulty and Pioneer Technical Services, Inc.
Butte Priority Soils Operable Unit (BPSOU) Final Insufficiently Reclaimed (IR) Sites Field Sampling Plan (FSP) BRES No. 17 – Paymaster, Mike McAnulty
Butte Priority Soils Operable Unit (BPSOU) Final Unreclaimed Sites – Field Sampling Plan (FSP) UR 42 – Area near Walkerville Playground, Mike McAnulty
Butte Priority Soils Operable Unit (BPSOU) Revised Final Residential Metals Abatement Program (RMAP) Plan, Mike McAnulty
Butte Priority Soils Operable Unit (BPSOU) Unreclaimed and Insufficiently Reclaimed Sites Request for Change 2023-01, Mike McAnulty
Butte Priority Soils Operable Unit (BPSOU) Unreclaimed and Insufficiently Reclaimed Sites Request for Change 2023-02, Mike McAnulty
Butte Priority Soils Operable Unit Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan, Nikia Greene and Pioneer Technical Services, Inc.
Butte Reduction Works (BRW) Phase III Quality Assurance Project Plan (QAPP) Request for Change BRW-2023-01, Josh Bryson
Butte Reduction Works (BRW) Phase III Quality Assurance Project Plan (QAPP) Request for Change BRW-2023-03, Josh Bryson
Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (QAPP) for Microbial Analysis and Biotreatability; Request for Change BRW-2023-02, Pioneer Technical Services, Inc.
CHEMICAL SPECIATION IN HOT SPRINGS HOSTED IN RHYOLITIC AND BASALTIC HOST ROCK: YELLOWSTONE AND ICELAND, Maria Emilia Arteaga Poso
COMPARISON OF SIEVED SOIL SAMPLE RESULTS FROM BUTTE-SILVER BOW MULTI-PATHWAY RESIDENTIAL METALS ABATEMENT PROGRAM: 250 µM AND 150 µM SIEVED SAMPLES FOR LEAD AND ARSENIC ENRICHMENT DETERMINATION ATLANTIC RICHFIELD COMPANY BUTTE, MONTANA, Ramboll and Environmental Standards, Inc.
COMPARISON OF SIEVED SOIL SAMPLE RESULTS FROM BUTTE-SILVER BOW MULTI-PATHWAY RESIDENTIAL METALS ABATEMENT PROGRAM: 250 μM AND 150 μM SIEVED SAMPLES FOR LEAD AND ARSENIC ENRICHMENT DETERMINATION ATLANTIC RICHFIELD COMPANY BUTTE, MONTANA, Ramboll and Environmental Standards, Inc.
Constitutional Convention, Daniel J. Foley, Dennis E. Curran, Arthur P. Hutchinson, and Harley Hettick
Copy of Revision Summary, Atlantic Richfield Company
Copy of Revision Summary - SBC/Butte Area NPL Site Final BPSOU Interim Site-Wide Surface Water Monitoring QAPP 2020 and 2021 Monitoring Period, 10/14/20, Atlantic Richfield Company and TREC Inc., A Woodard and Curran Company
Draft Final 2022 Insufficiently Reclaimed Sites Sampling BRES No. 08 – Belle of Butte Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Draft Final 2022 Residential Metals Abatement Program (RMAP) Quality Assurance Project Plan (QAPP) (Non-Residential Parcels), Pioneer Technical Services, Inc.
Draft Final 2023 Butte Priority Soils Operable Unit (BPSOU) Borrow Amendment Work Plan, Mike McAnulty and Pioneer Technical Services, Inc.
Draft Final 2023 Butte Priority Soils Operable Unit Helehan Borrow Submittal #1, Pioneer Technical Services, Inc.
Draft Final 2023 Residential Metals Abatement Program (RMAP) Borrow Amendment Work Plan, Pioneer Technical Services, Inc.
Draft Final 2023 Residential Metals Abatement Program (RMAP) Clark Park Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Draft Final 2023 Residential Metals Abatement Program (RMAP) Copper/Emmett Park Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Draft Final 2023 Residential Metals Abatement Program (RMAP) Gold Hill Lutheran Church (containing the Creativity Factory Preschool) Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Draft Final 2023 Residential Metals Abatement Program (RMAP) Park Soil Sampling Field Sampling Plan (FSP) Submittal #10 [Original Mine Yard], Pioneer Technical Services, Inc.
Draft Final 2023 Residential Metals Abatement Program (RMAP) Park Soil Sampling Field Sampling Plan (FSP) Submittal #12 [Aldersgate United Methodist Church], Pioneer Technical Services, Inc.
Draft Final 2023 Residential Metals Abatement Program (RMAP) Park Soil Sampling Field Sampling Plan (FSP) Submittal #7 [Gold Hill Lutheran Church, Peoples Park, Sioux Park, Charlie Judd Park, Emma Park, Mandan Park, and Walkerville Park (Daly and Dunn)], Pioneer Technical Services, Inc.
|Draft Final 2023 Residential Metals Abatement Program (RMAP) Quality Assurance Project Plan (QAPP) Annual Update (Non-Residential Parcels), Pioneer Technical Services, Inc.
Draft Final 2023 Residential Metals Abatement Program (RMAP) Racetrack Borrow Submittal, Pioneer Technical Services, Inc.
Draft Final 2023 Residential Metals Abatement Program (RMAP) Racetrack Borrow Submittal, Pioneer Technical Services, Inc.
Draft Final 2023 Residential Metals Abatement Program (RMAP) Rocker Park Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Draft Final 2023 Residential Metals Abatement Program (RMAP) School Soil Sampling Field Sampling Plan (FSP) Submittal #11 [Montana Technological University (North Campus)], Pioneer Technical Services, Inc.
Draft Final 2023 Residential Metals Abatement Program (RMAP) Stodden Park Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Draft Final 2023 Residential Metals Abatement Program (RMAP) Walkerville Park (Alley of North Main and Alley of West Daly) Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Draft Final 2023 Residential Metals Abatement Program (RMAP) Walkerville Park (Walkerville Drive and Ryan Road) Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Draft Final 2023 RMAP Baptist Student Union (former McKinley School) Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Draft Final Annual Operations and Maintenance (O&M) Report Butte Treatment Lagoon (BTL) System – 2022, Pioneer Technical Services, Inc.
Draft Final BPSOU Unreclaimed Sites UR-06 Temporary Best Management Practice Work Plan, Pioneer Technical Services, Inc.
Draft Final Butte Priority Soils Operable Unit (BPSOU) Insufficiently Reclaimed (IR) Sites Colorado Dump – West Lot Construction Completion Report (CCR), Pioneer Technical Services, Inc.
Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – First Quarter 2022, Pioneer Technical Services, Inc.
Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – First Quarter 2023, Pioneer Technical Services, Inc.
Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2022, Pioneer Technical Services, Inc.
Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023, Pioneer Technical Services, Inc.
Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Second Quarter 2023, Pioneer Technical Services, Inc.
Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Third Quarter 2022, Pioneer Technical Services, Inc.
Draft Final Revised Residential Metals Abatement Program (RMAP) Quality Assurance Project Plan (QAPP) (Residential Parcels), Pioneer Technical Services, Inc.
Draft - Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) Butte High School, Environmental Resource Management (ERM)
Draft - Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) Emerson Elementary School, Environmental Resource Management (ERM)
Draft - Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) Former Hawthorne School, Environmental Resource Management (ERM)
Draft - Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) Monroe Head Start Preschool, Environmental Resource Management (ERM)
Draft - Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) Ramsay Elementary School, Environmental Resource Management (ERM)
Draft - Sieve Study Report December 2022, Appendices, Ramboll
Electronic Data WSSOU for DSR, Environmental Protection Agency and Pioneer Technical Services, Inc.
Environmental Considerations for Treatment of Effluent Waste Solutions and Solid Waste Products, Larry G. Twidwell
Final 2021 Insufficiently Reclaimed Sites Sampling BRES No. 104 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2021 Insufficiently Reclaimed Sites Sampling BRES No. 154 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2021 Unreclaimed Sites Sampling UR-01 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2021 Unreclaimed Sites Sampling UR-03 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2021 Unreclaimed Sites Sampling UR-05 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2021 Unreclaimed Sites Sampling UR-24 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2021 Unreclaimed Sites Sampling UR-30 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2021 Unreclaimed Sites Sampling UR-32 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2021 Unreclaimed Sites Sampling UR-33 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2021 Unreclaimed Sites Sampling UR-34 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2021 Unreclaimed Sites Sampling UR-35 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2021 Unreclaimed Sites Sampling UR-36 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2021 Unreclaimed Sites Sampling UR-38 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2021 Unreclaimed Sites Sampling UR-40 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final 2023 Butte Priority Soils Operable Unit (BPSOU) Borrow Amendment Work Plan, Pioneer Technical Services, Inc.
Final 2023 Butte Priority Soils Operable Unit Helehan Borrow Submittal #1, Pioneer Technical Services, Inc.
Final 2023 Residential Metals Abatement Program (RMAP) Clark Park Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Final 2023 Residential Metals Abatement Program (RMAP) Copper/Emmett Park Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Final 2023 Residential Metals Abatement Program (RMAP) Gold Hill Lutheran Church (containing the Creativity Factory Preschool) Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Final 2023 Residential Metals Abatement Program (RMAP) Park Soil Sampling Field Sampling Plan (FSP) Submittal #11 [Montana Technological University (North Campus)], Pioneer Technical Services, Inc.
Final 2023 Residential Metals Abatement Program (RMAP) Park Soil Sampling Field Sampling Plan (FSP) Submittal #12 [Aldersgate United Methodist Church], Pioneer Technical Services, Inc.
Final 2023 Residential Metals Abatement Program (RMAP) Park Soil Sampling Field Sampling Plan (FSP) Submittal #8 [Ramsay Skating Rink, Skyline Park, Butte Vigilante Saddle Club, Butte Country Club, Fairmont Hot Springs, Silver Bow Homes Park, Gloria Dei Lutheran Church, and United Congregational Church], Pioneer Technical Services, Inc.
Final 2023 Residential Metals Abatement Program (RMAP) Quality Assurance Project Plan (QAPP) Annual Update (Non-Residential Parcels), Pioneer Technical Services, Inc.
Final 2023 Residential Metals Abatement Program (RMAP) Racetrack Borrow Submittal, Pioneer Technical Services, Inc.
Final 2023 Residential Metals Abatement Program (RMAP) Rocker Park Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Final 2023 Residential Metals Abatement Program (RMAP) Stodden Park Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Final 2023 Residential Metals Abatement Program (RMAP) Stodden Park Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Final 2023 Residential Metals Abatement Program (RMAP) Walkerville Park (Walkerville Drive and Ryan Road) Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Final 2023 RMAP Stodden Park Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Final BPSOU Insufficiently Reclaimed Sites Colorado Dump-West Lot Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit 2022 Unreclaimed Sites Quality Assurance Project Plan, Nikia Greene and Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (BPSOU) 2021 Unreclaimed Sites Sampling – UR-03 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (BPSOU) 2021 Unreclaimed Sites Sampling – UR-05 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (BPSOU) 2021 Unreclaimed Sites Sampling – UR-09 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (BPSOU) 2021 Unreclaimed Sites Sampling – UR-24 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (BPSOU) 2021 Unreclaimed Sites Sampling – UR-30 Site Evaluation Summary Report., Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (BPSOU) 2021 Unreclaimed Sites Sampling – UR-32 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (BPSOU) 2021 Unreclaimed Sites Sampling – UR-33 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (BPSOU) 2021 Unreclaimed Sites Sampling – UR-34 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (BPSOU) 2021 Unreclaimed Sites Sampling – UR-35 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (BPSOU) 2021 Unreclaimed Sites Sampling – UR-38 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (BPSOU) 2021 Unreclaimed Sites Sampling – UR-39 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (BPSOU) 2021 Unreclaimed Sites Sampling – UR-39 Site Evaluation Summary Report., Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (BPSOU) 2021 Unreclaimed Sites Sampling – UR-40 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit (BPSOU) Insufficiently Reclaimed (IR) Sites Colorado Dump – West Lot Construction Completion Report (CCR), Pioneer Technical Services, Inc.
Final Butte Reduction Works (BRW) Phase III Quality Assurance Project Plan (QAPP) Request for Change BRW-2023-03, Josh Bryson
Final Butte Reduction Works (BRW) Phase II QAPP, Nikia Greene and Pioneer Technical Services, Inc.
Final Butte Reduction Works (BRW) Phase I QAPP, Pioneer Technical Services, Inc. and Nikia Greene
Final Butte Reduction Works (BRW) Phase I Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
Final Revised Butte Reduction Works (BRW) Phase III QAPP, Nikia Greene
Final Revised Butte Reduction Works (BRW) Phase III QAPP, Nikia Greene
Final Revised Butte Reduction Works (BRW) Phase III QAPP, Nikia Greene and Pioneer Technical Services, Inc.
Final Revised Butte Reduction Works (BRW) Phase I Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
Final Revised Residential Metals Abatement Program (RMAP) (Non-Residential Parcels) 2021 DATA SUMMARY REPORT (DSR), Environmental Standards, Inc. and Pioneer Technical Services, Inc.
Final RMAP Park Soil Sampling Field Sampling Plan (FSP) Submittal #7 [Covering Gold Hill Lutheran Church, Peoples Park, Sioux Park, Charlie Judd Park, Emma Park, Mandan Park, and Walkerville Park (Daly and Dunn)], Pioneer Technical Services, Inc.
Final RMAP Park Soil Sampling Field Sampling Plan (FSP) Submittal #9 [Covering Centerville Skating Rink, Belmont Senior Citizens Center, High Altitude Skating Rink, Missoula Gulch Ballfield Play Area, MAC Facilities, Butte Family YMCA, Church of Christ, and Montana Tech South Campus], Pioneer Technical Services, Inc.
Final Third Cycle Best Management Practices (BMPs) New and Mahoney Work Plan, Pioneer Technical Services, Inc.
First Quarter Data Sheets - Event Log, Chem Dump, Field Dump, etc., Atlantic Richfield Company
GEOCHEMICAL MODELING OF MOLYBDENUM STABILITY IN A BASALT AQUIFER, Scott Hensel
Golden Leaf Property, WPA
Golden Link, WPA
Golden Messenger, WPA
Golden Messenger, WPA
Golden Messenger, WPA
Golden Messenger, WPA
Golden Messenger, WPA
Golden Messenger, WPA
Golden Messenger, WPA
Golden Messenger, WPA
Golden Messenger, WPA
Golden Messenger, WPA
Golden Mist, WPA
Golden Moss, WPA
Golden Point, WPA
Golden Queen, WPA
Golden Reef, WPA
Golden Ridge, WPA
Golden Ring, WPA
Golden Ring, WPA
Golden Ring, WPA
Golden Rod, WPA
Golden Rod, WPA
Golden Rod, WPA
Golden Rod, WPA
Golden Rod, WPA
Golden Rod, WPA
Golden Rod, WPA
Golden Rod, WPA
Golden Rod, WPA
Golden Rod, WPA
Golden Shower, WPA
Golden Summit, WPA
Golden Sunlight, WPA
Golden Sunlight, WPA
Golden Sunlight, WPA
Golden Sunlight, WPA
Golden Sunlight, WPA
Golden Sunlight, WPA
Golden Sunlight, WPA
Golden Sunlight, WPA
Golden Sunlight, WPA
Golden Sunlight, WPA
Golden Sunset, WPA
Golden Thread, WPA
Golden Treasure, WPA
Golden Valley, WPA
Golden Valley, WPA
Golden Valley, WPA
Golden West, WPA
Goldonna, WPA
GW Monitoring, Pioneer Technical Services, Inc.
HIGH-PRESSURE SLURRY ABLATION FOR IMPROVING SEPARATION OF COPPER/MOLYBDENUM AND FLOTATION OF GOLD TAILINGS, Mitchell Harvey
History of the Metallurgy / Mineral Processing Programs (1900-2022), Jerome Downey and Larry G. Twidwell
IMAGING METAL OBJECTS THROUGH RADIO FREQUENCY CHANNEL SOUNDING, Jamison Ehlers
INVESTIGATION OF THE SHEEP CREEK CARBONATITES, RAVALLI COUNTY, MONTANA, Sarah Risedorf
Irma, WPA
Irma, WPA
Irma, WPA
Irma, WPA
Irma, WPA
Irma, WPA
Irma, WPA
Irma & Republic, WPA
Iron Age, WPA
Iron Age, WPA
Iron Age, WPA
Iron Age, WPA
Iron Age, WPA
Iron Age, WPA
Iron Age, WPA
Iron Age, WPA
Iron Chancellor, WPA
Iron Chief, WPA
Iron Chief, WPA
Iron King, WPA
Iron Mask, WPA
Iron Mask, WPA
Iron Mask, WPA
Iron Mask, WPA
Iron Mask, WPA
Iron Mask, WPA
Iron Mask, WPA
Iron Mountain, WPA
Iron Mountain, WPA
Iron Mountain, WPA
Iron Mountain, WPA
Iron Mountain, WPA
Iron Mountain, WPA
Iron Rod, WPA
Irwin, WPA
Isabella, WPA
Isabella, WPA
Isabelle, WPA
Ivans Mine, WPA
Jack, WPA
Jack, WPA
Jack Pot, WPA
Jack Pot, WPA
Jack Rabbit, WPA
Jack Rabbit, WPA
Jack Rabbit, WPA
Jack Rabbit, WPA
Jack Rabbit, WPA
Jack Rabbit, WPA
Jack Rabbit, WPA
Jack Rabbit, WPA
Jack & Rosemont, WPA
Jack Waite, WPA
Jack Waite, WPA
Jack Waite, WPA
Jack Waite, WPA
Jack Waite, WPA
Jack Waite, WPA
Jack Waite, WPA
Jack Waite, WPA
Jack Waite, WPA
Jack Waite, WPA
Jack Waite, WPA
Jack Waite, WPA
Jack Waite, WPA
Jameson, WPA
Jamie, WPA
January, WPA
January, WPA
January, WPA
January, WPA
Jardine, WPA
Jardine, WPA
Jardine, WPA
Jardine, WPA
Jardine, WPA
Jardine, WPA
Jardine, WPA
Jardine, WPA
Jardine, WPA
Jardine, WPA
Jardine, WPA
Jardine, WPA
Jardine, WPA
Jardine, WPA
Jawbone, WPA
Jaybird, WPA
Jaybird, WPA
Jay Gould, WPA
Jay Gould, WPA
Jay Gould, WPA
Jay Gould, WPA
Jay Gould, WPA
Jay Gould, WPA
Jay Gould, WPA
Jeff Davis, WPA
Jefferson, WPA
Jewel, WPA
Jewel, WPA
Jewel, WPA
Medical Monitoring Working Group Meeting Minutes, Mike McAnulty
MICROBIOME RECOVERY OF THE UPPER CLARK FORK RIVER RESTORATION SITE, Danella Stapley
Optimization of Porosity in Cold Spray Produced Copper and Zinc Coatings, Cameron Hughes
Overall Data Summary, Pioneer Technical Services, Inc. and Environmental Protection Agency
RE: Approved Residential Metals Abatement Program Quality Assurance Project Plan (Non-Residential Parcels – Indoor Dust), Mike McAnulty
RE: Butte Priority Soils Operable Unit (BPSOU) Revised Final Residential Metals Abatement Program (RMAP) Plan, Mike McAnulty
Re: Comments on the Draft Butte Priority Soils Operable Unit (BPSOU) Buffalo Gulch 60 Percent Design (dated December 9, 2022), Nikia Greene
Remedial Action Work Plan - East Middle School, Environmental Protection Agency
Remedial Action Work Plan East Middle School, Environmental Resource Management (ERM)
RE: Residential Metals Abatement Program Field Sampling Plan Butte High School – Indoor Soil, Mike McAnulty
RE: Residential Metals Abatement Program Field Sampling Plan – Indoor Dust – Group1, Mike McAnulty
Residential Metals Abatement Program – Interior School Dust – Investigation Summary Report – Emerson Elementary, Pioneer Technical Services, Inc.
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - Aware Early Head Start, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) - Aware Early Head Start, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) Aware Early Head Start, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) Aware Early Head Start, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) Butte High School, Environmental Protection Agency
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) East Middle School, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) Emerson Elementary School, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) Former Hawthorne School, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) Highland View Christian School, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) Highland View Christian School, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) Lincoln Head Start, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) Margaret Leary Elementary School, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) Margaret Leary Elementary School, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) Monroe Head Start Preschool, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) Ramsay Elementary School, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) Ramsay Elementary School, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non- Residential Parcels – Indoor Dust) West Elementary School, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) West Elementary School, Environmental Resource Management (ERM)
Residential Metals Abatement Program Investigation Summary Report (Non-Residential Parcels – Indoor Dust) West Elementary School, Environmental Resource Management (ERM)
Revised Draft Final Butte Priority Soils Operable Unit Butte Treatment Lagoons and BPSOU Subdrain Sampling and Monitoring Quality Assurance Project Plan, Nikia Greene and Pioneer Technical Services, Inc.
Revised Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2021, Pioneer Technical Services, Inc.
Revised Draft Final West Side Soils Operable Unit Remedial Investigation Sampling Data Summary Report, Pioneer Technical Services, Inc.
Revised Final Multi-Pathway Residential Metals Abatement Program Plan, Atlantic Richfield Company and Butte Silver Bow
Risk-Reduction Research in Occupational Safety and Ergonomics: An Editorial, Roger C. Jensen and David P. Gilkey
Table1 ERM RMAP Dust 2022 Revision Summary - Final Qualified, Environmental Resource Management (ERM)
Table 2 ERM RMAP Dust 2022 Revision Summary Final, Environmental Resource Management (ERM)
Tables A1, A2, A3, A4, A5 2021, Pioneer Technical Services, Inc. and Environmental Protection Agency
The application of portable air cleaners in spaces occupied by vulnerable people during wildfire events, Layne Willis, Julie Hart, Raja Nagisetty, Clay Comstock, David P. Gilkey, and Daniel Autenrieth
THE USE OF NOVEL CEMENT ADDITIVES TO INCREASE THE CARBON STORAGE POTENTIAL OF OILFIELD CEMENTS, Rob Braden
Timeline - History of the Metallurgy / Mineral Processing Programs (1900-2022), Jerome Downey and Larry G. Twidwell
Treatment of Arsenic-Bearing Minerals and Fixation of Recovered Arsenic Products: An Updated Review, Larry G. Twidwell
Work Order No. 10591325, Environmental Protection Agency; Atlantic Richfield Company; and Pioneer Technical Services, Inc.