Prepared By:
Atlantic Richfield Company
Document Type
Government Report
Publication Date
Spring 5-10-2023
Subject Area
Butte
Recommended Citation
Bryson, Josh, "Butte Reduction Works (BRW) Phase III Quality Assurance Project Plan (QAPP) Request for Change BRW-2023-01" (2023). Silver Bow Creek/Butte Area Superfund Site. 445.
https://digitalcommons.mtech.edu/superfund_silverbowbutte/445
Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.
Included in
Environmental Health and Protection Commons, Environmental Indicators and Impact Assessment Commons, Environmental Monitoring Commons
Comments
This request for change (RFC) to the Final Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Phase III Quality Assurance Project Plan (QAPP) (Atlantic Richfield Company, 2022) (Phase III QAPP) provides the procedures and protocols necessary for Atlantic Richfield Company (Atlantic Richfield) to install additional boreholes and collect additional geotechnical data to meet a data quality objective specified in the Phase III QAPP and provide the necessary information to support design and construction of the proposed bridge replacement (North Bridge) that will span the Silver Bow Creek channel on the north side of the site (Figure 1).