Submissions from 2022
BTC Remediation and Contaminated Groundwater Hydraulic Control Site Pumping Test QAPP, Nikia Greene and Pioneer Technical Services, Inc.
Butte Priority Soils Operable Unit Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan, Nikia Greene and Pioneer Technical Services, Inc.
Final Butte Priority Soils Operable Unit 2022 Unreclaimed Sites Quality Assurance Project Plan, Nikia Greene and Pioneer Technical Services, Inc.
Final Butte Reduction Works (BRW) Phase II QAPP, Nikia Greene and Pioneer Technical Services, Inc.
Final Revised Butte Reduction Works (BRW) Phase III QAPP, Nikia Greene and Pioneer Technical Services, Inc.
Revised Draft Final Butte Priority Soils Operable Unit Butte Treatment Lagoons and BPSOU Subdrain Sampling and Monitoring Quality Assurance Project Plan, Nikia Greene and Pioneer Technical Services, Inc.
ERM Corrective Action Response, Elsie King
2022 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) Butte High School – Indoor Soil, Elsie King, Christopher Berg, and Thomas J. Beckman
2022 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) – Indoor Dust – Group 2 West Elementary, Elsie King, Christopher Berg, and Thomas J. Beckman
2022 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) – Indoor Dust – Group 3 - Butte High School/Annex, Elsie King, Christopher Berg, and Thomas J. Beckman
2022 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) – Indoor Dust – Group 4 Monroe Head Start, Former Hawthorne School, Margaret Leary Elementary, and Ramsay Elementary, Elsie King, Christopher Berg, and Thomas J. Beckman
2022 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) – Indoor Dust – Group 7 East Middle School, Elsie King, Christopher Berg, and Thomas J. Beckman
Residential Metals Abatement Program Quality Assurance Project Plan (Non-Residential Parcels - Indoor Dust), Elsie King, Christopher Berg, and Environmental Resource Management (ERM)
Butte Priority Soils Operable Unit (BPSOU) Final Insufficiently Reclaimed Sites - Field Sampling Plan (FSP) BRES No. 133 – Dexter Mill, Mike McAnulty
Butte Priority Soils Operable Unit (BPSOU) Final Insufficiently Reclaimed Sites - Field Sampling Plan (FSP) BRES No. 16 - Curry., Mike McAnulty
Butte Priority Soils Operable Unit (BPSOU) Final Insufficiently Reclaimed Sites - Field Sampling Plan (FSP) BRES No. 30 – Atlantic-1, Mike McAnulty
Butte Priority Soils Operable Unit (BPSOU) Final Insufficiently Reclaimed Sites - Field Sampling Plan (FSP) BRES No. 32 – Corra-2 Dumps, Mike McAnulty
Butte Priority Soils Operable Unit (BPSOU) Final Insufficiently Reclaimed Sites - Field Sampling Plan (FSP) BRES No. 34 – Eveline, Mike McAnulty
Butte Priority Soils Operable Unit (BPSOU) Final Insufficiently Reclaimed Sites - Field Sampling Plan (FSP) BRES No. 38 – Sister Dump, Mike McAnulty
Butte Priority Soils Operable Unit (BPSOU) Final Insufficiently Reclaimed Sites - Field Sampling Plan (FSP) BRES No. 38 – Sister Dump., Mike McAnulty
Butte Priority Soils Operable Unit (BPSOU) Final Insufficiently Reclaimed Sites - Field Sampling Plan (FSP) BRES No. 93 – Soudan Dump, Mike McAnulty
Butte Priority Soils Operable Unit (BPSOU) Final Insufficiently Reclaimed Sites - Field Sampling Plan (FSP) BRES No. 96 – Washoe Dump, Mike McAnulty
Butte Priority Soils Operable Unit (BPSOU) Final Street and Snow Management Plan, Mike McAnulty
Butte Priority Soils Operable Unit (BPSOU) Revised Final Residential Metals Abatement Program (RMAP) Plan, Mike McAnulty
Final 2022 Residential Metals Abatement Program (RMAP) Quality Assurance Project Plan (QAPP) (Non-Residential Parcels), Mike McAnulty
Medical Monitoring Working Group Meeting Minutes, Mike McAnulty
Medical Monitoring Working Group Meeting Minutes, Mike McAnulty
RE: Approved Residential Metals Abatement Program Quality Assurance Project Plan (Non-Residential Parcels – Indoor Dust), Mike McAnulty
RE: Butte Priority Soils Operable Unit (BPSOU) Revised Final Residential Metals Abatement Program (RMAP) Plan, Mike McAnulty
RE: Residential Metals Abatement Program Field Sampling Plan Butte High School – Indoor Soil, Mike McAnulty
RE: Residential Metals Abatement Program Field Sampling Plan – Indoor Dust – Group1, Mike McAnulty
Residential Metals Abatement Program – Interior School Dust ‐ Remedial Action Work Plan – East Middle School, Mike McAnulty
Residential Metals Abatement Program – Interior School Soil ‐ Remedial Action Work Plan – Butte High School, Mike McAnulty
Residential Metals Abatement Program – Interior School Soil ‐ Remedial Action Work Plan – Butte High School, Mike McAnulty
QUALITY ASSURANCE PROJECT PLAN, 2023, Montana Bureau of Mines and Geology
APPENDIX D Laboratory Analytical Full Data Packages, Pace Analytical Services
2019 - 2021 WSSSOU Data For GIS, Pioneer Technical Services, Inc.
2021 3Q BTL ChemDump, Pioneer Technical Services, Inc.
2021 3Q BTL Daily PTS Field Dump, Pioneer Technical Services, Inc.
2021 3Q Laboratory EDD, Pioneer Technical Services, Inc.
2021 BTL O&M Events Log / 2021 Daily Log, Pioneer Technical Services, Inc.
2021 Final Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Quality Assurance Project Plan (QAPP) for Microbial Analysis and Biotreatability Study, Pioneer Technical Services, Inc.
2022 3Q BTL Chemical Dump, Pioneer Technical Services, Inc.
2022 3Q Daily PTS Field Dump, Pioneer Technical Services, Inc.
2022 BTL O&M Events Log, Pioneer Technical Services, Inc.
2022 Draft Final Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Organic Pollutant Surface Water Sampling Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
2022 - Draft Final - Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Phase III Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
2022 Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
2022 Final Blacktail Creek Remediation and Contaminated Groundwater Hydraulic Control Site Pumping Test Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
2022 Final Blacktail Creek Remediation and Contaminated Groundwater Hydraulic Control Site Pumping Test Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
2022 Final Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Phase III Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
2022 Final Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Phase III Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
2022 Final Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Phase III Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
2022 Final Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Phase III Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
2022 Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
2022 - Final Revised - Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Phase II Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
2022 Final Revised Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Phase II Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
2022 Final Revised Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Phase II Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
2022 Final Unreclaimed Sites Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
2022 Lab Results Annual, Pioneer Technical Services, Inc.
2022 Revised Draft Final Unreclaimed Sites Quality Assurance Project Plan (QAPP), Pioneer Technical Services, Inc.
APPENDIX B - DATA VALIDATION REPORTS, Pioneer Technical Services, Inc.
Draft Final 2021 Unreclaimed Sites Investigation: XRF to Laboratory Correlation and Regression Analyses Procedure, Pioneer Technical Services, Inc.
Draft Final 2021 Unreclaimed Sites Sampling UR-01 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Draft Final 2021 Unreclaimed Sites Sampling UR-03 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Draft Final 2021 Unreclaimed Sites Sampling UR-05 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Draft Final 2021 Unreclaimed Sites Sampling UR-24 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Draft Final 2021 Unreclaimed Sites Sampling UR-33 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Draft Final 2021 Unreclaimed Sites Sampling UR-35 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Draft Final 2021 Unreclaimed Sites Sampling UR-36 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Draft Final 2021 Unreclaimed Sites Sampling UR-38 Site Evaluation Summary Report, Pioneer Technical Services, Inc.
Draft Final 2022 Residential Metals Abatement Program (RMAP) Cherokee Park Soil Remedial Action Work Plan (RAWP), Pioneer Technical Services, Inc.