Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) – Indoor Dust – Group 1 (Aware Early Head Start, Lincoln Head Start, Highland View Christian School, Silver Bow Montessori, and Small World Day Care) (dated March 23, 2022), Nikia Greene
PDF
Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Revised Draft Final Insufficiently Reclaimed Sites Colorado Dump – West Lot Remedial Action Work Plan (RAWP) (dated July 29, 2022), Nikia Greene
PDF
Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Revised Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (FSP) BRES No. 8 – Belle of Butte (dated August 2, 2022), Nikia Greene
PDF
Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Revised Draft Final Reclaimed Areas Maintenance and Monitoring Plan (dated June 15, 2022), Nikia Greene
PDF
Approval letter for the Draft Final Residential Metals Abatement Program (RMAP) Cherokee Park Soil Remedial Action Work Plan (RAWP) (dated November 4, 2022), Nikia Greene
PDF
Approval letter for the Draft Final Residential Metals Abatement Program (RMAP) Koprivica Park Soil Remedial Action Work Plan (RAWP) (dated November 4, 2022), Nikia Greene
PDF
Approval letter for the Request for Change (RFC) to the Butte Priority Soils Operable Unit (BPSOU) Request for Change (RFC) No. 1 to the Final 2022 Insufficiently Reclaimed Sites Quality Assurance Project Plan (QAPP) (dated August 31, 2022), Nikia Greene
PDF
Approval letter for the Request for Information (RFI) - 01 to the Butte Priority Soils Operable Unit (BPSOU) Final 2022 Unreclaimed Sites Quality Assurance Project Plan (QAPP) (dated August 31, 2022), Nikia Greene
PDF
Approval Letter for the Revised Draft Final Butte Priority Soils Operable Unit (BPSOU) Revised Butte Reclamation Evaluation System (BRES) Field Manual (dated July 2021), Nikia Greene
PDF
Approval letter for the Revised Residential Metals Abatement Program (RMAP), Interior School Soils Remedial Action Work Plan (RAWP), Butte High School (dated November 17, 2022), Nikia Greene
PDF
Approval of Quality Assurance Project Plan [QAPP], 2022, Butte Mine Flooding Operable Unit and Butte Priority Soils Operable Unit, Private Well Monitoring Program, dated November 2021, revised version received February 10, 2022, Nikia Greene
PDF
Approval of the Butte Priority Soils Operable Unit (BPSOU) Revised Draft Final 2021 Groundwater Monitoring Data Summary Report, January 2021 – December 2021 (dated July 20, 2022), Nikia Greene
PDF
Approval of the Final Butte Priority Soils Operable Unit (BPSOU), Revised Draft Final Interim 2022 Site-Wide Surface Water Quality Assurance Project Plan (QAPP) (dated January 28, 2022), Nikia Greene
PDF
Approval of the Final Butte Priority Soils Operable Unit (BPSOU), Revision 1 to the Final 2022 Site-Wide Surface Water Quality Assurance Project Plan (QAPP) (dated February 25, 2022), Nikia Greene
PDF
Approval on the Draft Butte Priority Soils Operable Unit (BPSOU) Blacktail Creek Piezometer Installation and Monitoring Well Repair Plan (dated June 10, 2022), Nikia Greene
PDF
Comment letter: BPSOU Draft Final RMAP Quality Assurance Project Plan (QAPP) (Residential RMAP Parcels) (dated January 10, 2022), Nikia Greene
PDF
Comment letter: Butte Priority Soils Operable Unit (BPSOU) Draft Final Unreclaimed Sites Quality Assurance Project Plan (dated April 5, 2022), Nikia Greene
PDF
Comment letter for: 2021 BRES (Butte Reclamation Evaluation System) Inspection and Technical Recommendations Report (dated January 24, 2022), Nikia Greene
PDF
Comment Letter for: BPSOU Draft 2021 Stormwater Evaluation and Maintenance Report, (dated July 14, 2022), Nikia Greene
PDF
Comment letter for: Butte Priority Soils Operable Unit (BPSOU) Draft Final 2021 BPSOU Subdrain Data Summary Report (dated May 4, 2022), Nikia Greene
PDF
Comment letter for: Butte Priority Soils Operable Unit (BPSOU) Draft Final Blacktail Creek Remediation and Contaminated Groundwater Hydraulic Control Site, Pumping Test Quality Assurance Project Plan (dated October 20, 2021), Nikia Greene
PDF
Comment letter for: Butte Priority Soils Operable Unit (BPSOU) Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoons System – Fourth Quarter 2021 (dated March 30, 2022), Nikia Greene
PDF
Comment letter for: Butte Priority Soils Operable Unit (BPSOU) Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoons System – Fourth Quarter 2021 (dated March 30, 2022), Nikia Greene
PDF
Comment letter for: Butte Priority Soils Operable Unit (BPSOU) Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoons System – Second Quarter 2021 (dated September 21, 2021), Nikia Greene
PDF
Comment letter for: Butte Priority Soils Operable Unit (BPSOU) Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoons System – Third Quarter 2021 (dated December 10, 2021), Nikia Greene
PDF
Comment Letter for Draft 2021 Stormwater BMPs Repair, Inspection Report, and Maintenance Work Plan (dated January 24, 2022), Nikia Greene
PDF
Comment Letter for Draft Blacktail Creek (BTC) Groundwater Hydraulic Control System Remedial Design Work Plan (RDWP) (dated July 22, 2022), Nikia Greene
PDF
Comment Letter for Draft Final BPSOU Subdrain Pump Station Quality Assurance Project Plan (dated October 7, 2022), Nikia Greene
PDF
Comment Letter for Draft Final BPSOU Subdrain Pump Station Remedial Design (RD) Work Plan (dated June 14, 2022), Nikia Greene
PDF
Comment letter for: Quality Assurance Project Plan: Long-Term Operation and Maintenance of Railroad Assets, For BNSF Railway Company and Union Pacific Railroad, Butte Priority Soils Operable Unit (dated May 2022), Nikia Greene
PDF
Comment letter for the Butte Priority Soils Operable Unit (BPSOU) 2022 Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan (QAPP) (dated May 20, 2022), Nikia Greene
PDF
Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites Colorado Dump – West Lot Remedial Action Work Plan (RAWP) (dated July 13, 2022), Nikia Greene
PDF
Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Further Remedial Element Projects Quality Assurance Project Plan (QAPP) (dated October 2021), Nikia Greene
PDF
Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Draft Residential Metals Abatement Program (RMAP), Interior School Soils – Remedial Action Work Plan (RAWP), Butte High School (dated October 5, 2022), Nikia Greene
PDF
Comment letter for the Butte Priority Soils Operable Unit (BPSOU) Revised Final Multi-Pathway Residential Metals Abatement Program Plan (dated November 19, 2021), Nikia Greene
PDF
Comment letter for the Draft Final 2021 Unreclaimed Site Investigation: XRF to Laboratory Correlation and Regression Analyses Procedure (dated May 16, 2022), Nikia Greene
PDF
Comments for the Butte Priority Soils Operable Unit, 2018 Unreclaimed Sites Sampling UR- 09 Site Evaluation Summary Report (February 18, 2022), Nikia Greene
PDF
Comments for the Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites - Field Sampling and Investigation Plan (FSP) BRES No. 08 – Belle of Butte (dated March 11, 2022), Nikia Greene
PDF
Comments for the Butte Priority Soils Operable Unit, Insufficiently Reclaimed Site – Clark Mill Tailings NE (BRES No. 154) Evaluation Summary Report (May 4, 2022), Nikia Greene
PDF
Comments for the Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling UR-03 Site Evaluation Summary Report (August 3, 2022), Nikia Greene
PDF
Comments for the Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling UR-24 Site Evaluation Summary Report (July 26, 2022), Nikia Greene
PDF
Comments for the Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling UR-33 Site Evaluation Summary Report (June 6, 2022), Nikia Greene
PDF
Comments for the Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling UR-35 Site Evaluation Summary Report (June 15, 2022), Nikia Greene
PDF
Comments for the Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling UR-36 Site Evaluation Summary Report (August 8, 2022), Nikia Greene
PDF
Comments for the Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling UR-38 Site Evaluation Summary Report (June 8, 2022), Nikia Greene
PDF
Comments for the Draft Final Butte Priority Soils Operable Unit, 2021 Unreclaimed Sites Sampling UR-39 Site Evaluation Summary Report (June 15, 2022), Nikia Greene
PDF
Comments for the Draft Final Butte Priority Soils Operable Unit, Draft Final 2021 Unreclaimed Sites Sampling – Minnie Irvine (UR-01) Site Evaluation Summary Report (May 24, 2022), Nikia Greene
PDF
Comments for the Draft Final Butte Priority Soils Operable Unit, Draft Final 2021 Unreclaimed Sites Sampling Ruby Street (UR-05) Site Evaluation Summary Report (May 2022), Nikia Greene
PDF
Comments for the Draft Final Residential Metals Abatement Program (RMAP) (Non- Residential Parcels) Data Summary Report (DSR) (dated April 19, 2022), Nikia Greene
PDF
Comments for the Draft Residential Metals Abatement Program (RMAP) (Non- Residential Parcels) Quality Assurance Project Plan (QAPP) (dated May 12, 2022), Nikia Greene
PDF
Comments on Berkeley Pit and Discharge Pilot Project, Quarterly Pilot Project Report, Second Quarter 2022, dated September 21, 2022, Nikia Greene
PDF
Comments on the Butte Priority Soils Operable Unit (BPSOU) Annual Quality Assurance Project Plan for Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site; Phase III BRW Quality Assurance Project Plan (dated June 29, 2022), Nikia Greene
PDF
Comments on the Butte Priority Soils Operable Unit (BPSOU) Draft Final Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Pre-Design Investigation (PDI) Evaluation Report (dated June 10, 2022), Nikia Greene
PDF
Comments on the Butte Priority Soils Operable Unit (BPSOU) Revised Retention and Detention Discharge Management Report (dated April 1, 2022), Nikia Greene
PDF
Comments on the Draft Butte Priority Soils Operable Unit (BPSOU) 2020 Groundwater Compliance and Interpretation Technical Memorandum (dated May 12, 2022), Nikia Greene
PDF
Comments on the Draft Butte Priority Soils Operable Unit (BPSOU) 2021 Draft Site- Wide Surface Water Monitoring Data Summary Report (dated April 4, 2022), Nikia Greene
PDF
Comments on the Draft Butte Priority Soils Operable Unit (BPSOU) 2021 Groundwater Monitoring Data Summary Report, January 2021 – December 2021 (dated April 8, 2022), Nikia Greene
PDF
Comments on the Draft Butte Priority Soils Operable Unit (BPSOU) Draft Surface Water Surface Water Compliance and Interpretation Technical Memorandum (dated May 12, 2022), Nikia Greene
PDF
Comments the Butte Reclamation Evaluation System (BRES) Draft 2021 Field Evaluation of Reclaimed Sites Summary Report, 2021 BRES Field Evaluation Summary Report and Technical Recommendations Proposal (dated March 11, 2022), Nikia Greene
PDF
Concurrence and Comments on: SD Response to the Agencies Proposed RAAR Path Forward letter, dated March 28, 2022 and Pilot Project Annual Update letter, dated July 1, 2022, Nikia Greene
PDF
EPA REGION 8 QA DOCUMENT REVIEW CROSSWALK, Nikia Greene
PDF
Final Revised Butte Reduction Works (BRW) Phase III QAPP, Nikia Greene
PDF
Final Revised Butte Reduction Works (BRW) Phase III QAPP, Nikia Greene
PDF
Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) 2022 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) – Indoor Dust – Group 3, Revision 1 (dated September 8, 2022), Nikia Greene
PDF
Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) 2022 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) – Indoor Dust – Group 4, Revision 1 (dated September 8, 2022), Nikia Greene
PDF
Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) 2022 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) – Indoor Dust – Group 5, Revision 1 (dated September 8, 2022), Nikia Greene
PDF
Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) 2022 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) – Indoor Dust – Group 6, Revision 1 (dated September 8, 2022), Nikia Greene
PDF
Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) 2022 Revision No. 1, Residential Metals Abatement Program (RMAP), Quality Assurance Project Plan (QAPP), Non-Residential Parcels – Indoor Dust (dated September 9, 2022), Nikia Greene
PDF
Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Draft 2022 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) – Indoor Dust – Group 2 – West Elementary (dated April 25, 2022), Nikia Greene
PDF
Re: Approval letter for the Butte Priority Soils Operable Unit (BPSOU) Final 2022 Insufficiently Reclaimed Sites Quality Assurance Project Plan (QAPP) (dated July 12, 2022), Nikia Greene
PDF
RE: Butte High School Indoor Soil FSP - Informal Agency Review Copy, Nikia Greene
PDF
BPSOU Draft Final Residential Metals Abatement Program (RMAP) QAPP (Non-Residential Parcels) (5/12/22), Nikia Greene, Butte Silver Bow, and Atlantic Richfield Company
PDF
BTC Remediation and Contaminated Groundwater Hydraulic Control Site Pumping Test QAPP, Nikia Greene and Pioneer Technical Services, Inc.
PDF
Butte Priority Soils Operable Unit Draft Final Insufficiently Reclaimed Sites Quality Assurance Project Plan, Nikia Greene and Pioneer Technical Services, Inc.
PDF
Final Butte Priority Soils Operable Unit 2022 Unreclaimed Sites Quality Assurance Project Plan, Nikia Greene and Pioneer Technical Services, Inc.
PDF
Final Butte Reduction Works (BRW) Phase II QAPP, Nikia Greene and Pioneer Technical Services, Inc.
PDF
Final Revised Butte Reduction Works (BRW) Phase III QAPP, Nikia Greene and Pioneer Technical Services, Inc.
PDF
Revised Draft Final Butte Priority Soils Operable Unit Butte Treatment Lagoons and BPSOU Subdrain Sampling and Monitoring Quality Assurance Project Plan, Nikia Greene and Pioneer Technical Services, Inc.
PDF
Butte Priority Soils Operable Unit (BPSOU) Draft Final Quarterly Operations and Maintenance Report Butte Treatment Lagoon System – Fourth Quarter 2021., Dave Griffis
PDF
Butte Priority Soils Operable Unit (BPSOU) Draft 2021 Site-Wide Surface Water Monitoring Data Summary Report. Consent Decree- Civil Action No. CV 89-039-BU-SHE, Adrian Kien
PDF
RE: 2021 Butte Priority Soils Operable Unit (BPSOU) Draft Groundwater Monitoring Data Summary Report. Consent Decree- Civil Action No. CV 89-039-BU-SHE, Adrian Kien
PDF
ERM Corrective Action Response, Elsie King
PDF
2022 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) Butte High School – Indoor Soil, Elsie King, Christopher Berg, and Thomas J. Beckman
PDF
2022 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) – Indoor Dust – Group 2 West Elementary, Elsie King, Christopher Berg, and Thomas J. Beckman
PDF
2022 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) – Indoor Dust – Group 3 - Butte High School/Annex, Elsie King, Christopher Berg, and Thomas J. Beckman
PDF
2022 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) – Indoor Dust – Group 4 Monroe Head Start, Former Hawthorne School, Margaret Leary Elementary, and Ramsay Elementary, Elsie King, Christopher Berg, and Thomas J. Beckman
PDF
2022 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) – Indoor Dust – Group 7 East Middle School, Elsie King, Christopher Berg, and Thomas J. Beckman
PDF
Residential Metals Abatement Program Quality Assurance Project Plan (Non-Residential Parcels - Indoor Dust), Elsie King, Christopher Berg, and Environmental Resource Management (ERM)
PDF
Approved Final Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites Field Sampling Plan (FSP) Package #7: UR-01, UR-12, UR-03, UR-04, UR-15, and UR-17, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites - Field Sampling and Investigation Plan (FSP) BRES No. 08 – Belle of Butte, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites Field Sampling and Investigation Plan (FSP) BRES No. 50 – Zelia, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (FSP) BRES No. 133 – Dexter Mill, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (FSP) BRES No. 158 - Waste Rock Dump., Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (FSP) BRES No. 30 – Atlantic-1, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (FSP) BRES No. 32 – Corra-2 Dumps., Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (FSP) BRES No. 34 – Eveline., Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (FSP) BRES No. 37 – Josephine Shaft, Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites – Field Sampling Plan (FSP) BRES No. 38 – Sister Dump., Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (FSP) BRES No. 93 – Soudan Dump., Mike McAnulty
PDF
Butte Priority Soils Operable Unit (BPSOU) Draft Final Insufficiently Reclaimed Sites - Field Sampling Plan (FSP) BRES No. 96 – Washoe Dump, Mike McAnulty