Prepared By:
Atlantic Richfield Company
Document Type
Government Report
Publication Date
Summer 7-7-2021
Subject Area
Butte
Recommended Citation
McAnulty, Mike, "Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites - Draft Final Field Sampling Plan (FSP) #3 ; UR-06, UR-07, UR-20, UR-22, UR-35, and UR-36." (2021). Silver Bow Creek/Butte Area Superfund Site. 93.
https://digitalcommons.mtech.edu/superfund_silverbowbutte/93
Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.
Included in
Environmental Health and Protection Commons, Environmental Indicators and Impact Assessment Commons, Environmental Monitoring Commons
Comments
Soil sampling is proposed for FSP Package #3 at 6 UR Sites located in the northern area of Butte, Montana, southwest of the Berkeley Pit. The results of the soil sampling will be used to support the site declaration and potential future remediation requirements for each site. This FSP is consistent with Section 3.0 Data Acquisition protocol described in the UR Sites QAPP. These 6 UR Sites are made up of 5 sites less than an acre and 1 site that is 1.8 acres. UR-6, UR-7, UR-20, UR-22, and UR-35 are vacant lots that that are near businesses and residential areas with pedestrian traffic. UR-36 is the south Parrott slope site and contains steep slopes that drain into public roadways approximated at 1.8 acres.