Prepared By:
Atlantic Richfield Company
Document Type
Government Report
Publication Date
Summer 8-23-2021
Subject Area
Butte
Recommended Citation
McAnulty, Mike, "Butte Priority Soils Operable Unit (BPSOU) Unreclaimed Sites - Draft Final Field Sampling Plan (FSP) #5: UR-12, UR-13, UR-33, and UR-38." (2021). Silver Bow Creek/Butte Area Superfund Site. 91.
https://digitalcommons.mtech.edu/superfund_silverbowbutte/91
Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.
Included in
Environmental Health and Protection Commons, Environmental Indicators and Impact Assessment Commons, Environmental Monitoring Commons
Comments
Soil sampling is proposed for FSP Package #5 at 4 UR Sites located in west Butte, Montana, and south of West Elementary. The results of the soil sampling will be used to support the site declaration and potential future remediation requirements for each site. This FSP is consistent with Section 3.0 Data Acquisition protocol described in the UR Sites QAPP. These 4 UR Sites vary in size from 0.8 acres to 10.1 acres. Sites UR-13, 33, and 38 are vacant lots with pedestrian and motor vehicle activity. Site UR-12 contains a wooden structure and appears vacant with residential property within 500 feet. Each site is discussed separately below. The attachments at the end of this document include figures for each site showing the proposed soil sampling locations.