Alternative Title
SILVER BOW CREEK/BUTTE AREA NPL SITE BUTTE PRIORITY SOILS OPERABLE UNIT
Prepared By:
Atlantic Richfield Company
Document Type
Government Report
Publication Date
Summer 6-10-2022
Subject Area
Butte, Smelter Area
Recommended Citation
Atlantic Richfield Company and Bryson, Josh, "Draft Final Revised Butte Reduction Works (BRW) Smelter Area Mine Waste Remediation and Contaminated Groundwater Hydraulic Control Site Pre-Design Investigation (PDI) Evaluation Report" (2022). Silver Bow Creek/Butte Area Superfund Site. 251.
https://digitalcommons.mtech.edu/superfund_silverbowbutte/251
Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.
Included in
Environmental Health and Protection Commons, Environmental Indicators and Impact Assessment Commons, Environmental Monitoring Commons
Comments
Includes:
RESPONSE TO AGENCY COMMENTS FOR THE BUTTE PRIORITY SOILS OPERABLE UNIT (BPSOU) BUTTE REDUCTION WORKS (BRW) SMELTER AREA MINE WASTE REMEDIATION AND CONTAMINATED GROUNDWATER HYDRAULIC CONTROL SITE PRE-DESIGN INVESTIGATION (PDI) EVALUATION REPORT DATED MAY 14, 2021