Greene, Nikia, "Silver Bow Creek/Butte Area NPL Site 2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Groundwater Monitoring Quality Assurance Project Plan (QAPP), 11/16/21" (2021). Silver Bow Creek/Butte Area Superfund Site. 150.
https://digitalcommons.mtech.edu/superfund_silverbowbutte/150
Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.
Included in
Environmental Health and Protection Commons, Environmental Indicators and Impact Assessment Commons, Environmental Monitoring Commons
Comments
Six sites were removed from the monitoring network for safey concerns. These concerns are detailed in the QAPP cover letter. BMW-04B (monthly wl) and MSD-01A (continual wl) were removed from the monthly/continual water level network and the 5-year water quality network. MW2-CGSB3 and RLP-W were removed from the monthly water level network. MSD-01B and MSD-01C were removed from the monthly/continual water level network and semi-annual water quality network. GS-42S&D were added to the list of wells abandoned for the Parrott Tailings removal Wells which have been abandoned for the Parrott Tailings removal were removed from Table 5, GW Monitoring Network Coordinates. A table was added to Section 5.2 which presents data validation criteria