Alternative Title

2022 Draft Butte Priority Soils Operable Unit Interim Site-Wide Surface Water Monitoring Quality Assurance Project Plan (QAPP)

Prepared By:

TREC Inc., A Woodard and Curran Company

Document Type

Government Report

Publication Date

Winter 12-27-2021

Subject Area

Butte

Comments

The purpose of this Quality Assurance Project Plan (QAPP) is to provide guidance for collecting enforcement quality data for site-wide surface water, sediment, benthic macroinvertebrate (BMI), and habitat monitoring activities at the Butte Priority Soils Operable Unit within the Silver Bow Creek/Butte Area National Priorities List (NPL) Site during the 2022 monitoring period and to reference the documents necessary to describe the quality assurance and quality control (QA/QC) policies and procedures to be used during data collection and analysis.

Creative Commons License

Creative Commons Attribution 4.0 International License
This work is licensed under a Creative Commons Attribution 4.0 International License.

Share

COinS