Alternative Title

2021 Draft Final Blacktail Creek Remediation and Contaminated Groundwater Hydraulic Control Site Pumping Test Quality Assurance Project Plan (QAPP)

Prepared By:

Pioneer Technical Services, Inc.

Document Type

Government Report

Publication Date

Fall 10-20-2021

Subject Area

Butte

Comments

This Blacktail Creek (BTC) Pumping Test Quality Assurance Project Plan (QAPP) provides the procedures and protocols necessary to conduct a groundwater pumping test and a loading analysis as a part of the BTC groundwater hydraulic control (BTC hydraulic control) remedial design (RD) and remedial action (RA) effort for the BTC Remediation and Contaminated Groundwater Hydraulic Control Site (BTC RA Site).

Creative Commons License

Creative Commons Attribution 4.0 International License
This work is licensed under a Creative Commons Attribution 4.0 International License.

Share

COinS