Most Recent Additions*
2022 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) – Indoor Dust – Group 4 Monroe Head Start, Former Hawthorne School, Margaret Leary Elementary, and Ramsay Elementary
Elsie King, Christopher Berg, and Thomas J. Beckman
2022 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) – Indoor Dust – Group 3 - Butte High School/Annex
Elsie King, Christopher Berg, and Thomas J. Beckman
2022 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) – Indoor Dust – Group 2 West Elementary
Elsie King, Christopher Berg, and Thomas J. Beckman
SILVER BOW CREEK/BUTTE AREA NPL SITE BUTTE PRIORITY SOILS OPERABLE UNIT
Pioneer Technical Services, Inc.
BUTTE AREA NPL SITE BUTTE PRIORITY SOILS OPERABLE UNIT (BPSOU)
TREC Inc., A Woodard and Curran Company
Butte Priority Soils Operable Unit (BPSOU) 2022 Data Management Plan (Dated April 2022)
Atlantic Richfield Company
SILVER BOW CREEK/BUTTE AREA NPL SITE BUTTE PRIORITY SOILS OPERABLE UNIT
Pioneer Technical Services, Inc.
Risk Assessment Matrices for Workplace Hazards: Design for Usability
Roger C. Jensen, Royce L. Bird, and Blake W. Nichols
Request for Change (RFC) to the Draft Ground Water Monitoring Well Installation Plan (RFC-BPSOU-2022-04)
Josh Bryson and TREC Inc., A Woodard and Curran Company
2022 Residential Metals Abatement Program (RMAP) Field Sampling Plan (FSP) Butte High School – Indoor Soil
Elsie King, Christopher Berg, and Thomas J. Beckman
SILVER BOW CREEK/BUTTE AREA NPL SITE BUTTE PRIORITY SOILS OPERABLE UNIT
Pioneer Technical Services, Inc.
Butte Priority Soils Operable Unit (BPSOU) Silver Bow Creek/Butte Area NPL Site
Atlantic Richfield Company
Butte Priority Soils Operable Unit (BPSOU) Silver Bow Creek/Butte Area NPL Site
Atlantic Richfield Company
Butte Priority Soils Operable Unit Silver Bow Creek/Butte Area NPL Site
TREC Inc., A Woodard and Curran Company
Butte Priority Soils Operable Unit Silver Bow Creek/Butte Area NPL Site
TREC Inc., A Woodard and Curran Company
SILVER BOW CREEK/BUTTE AREA NPL SITE BUTTE PRIORITY SOILS OPERABLE UNIT
Environmental Standards, Inc. and Pioneer Technical Services, Inc.
Perseverance Rover’s Early Adventures in Jezero Crater, Mars
Kim Steadman and Sarah Milkovich
*Updated as of 05/27/22.