Date of Award

Spring 2014

Degree Type

Non-Thesis Project

Department

Environmental Engineering

First Advisor

Dr. Richard Appleman

Second Advisor

Dr. Rod James

Third Advisor

Dr. Steve Parker

Abstract

The purpose of this project is to take preliminary steps towards the development of a QUAL2Kw model for Silver Bow Creek, MT. These preliminary steps include initial research and familiarization with QUAL2Kw, use of ArcGIS to fill in geospatial data gaps, and integration of QUAL2Kw and ArcGIS. The integration involves improvement of the QUAL2Kw model output through adding functionality to the model itself, and development of a QUAL2Kw specific tool in ArcGIS. These improvements are designed to help expedite and simplify the viewing of QUAL2Kw output data spatially in ArcGIS as opposed to graphically within QUAL2Kw. These improvements will allow users to quickly and easily view the many output parameters of each model run geographically within ArcGIS. This will make locating potential problem areas or “hot spots” much quicker and easier than interpreting the QUAL2Kw output data from a graph alone. The added functionality of QUAL2KW was achieved through the development of an excel Macro, and the tool in ArcGIS was developed using python scripting and the model builder feature in ArcGIS.

Comments

A non-thesis paper submitted in partial fulfillment of the requirements for the degree of Master of Environmental Engineering.

Share

COinS